Back to pergola or trellis contractors
Romero Landscaping & Partnership
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2013 to Sep 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 never finaled. Typically 43 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2016 | Never finaled issued Oct 2016, no final | 333 Bush St | ground floor: removal of (e) wood lattice trellis and plantinf in raised sidewalk bed and replacement with new >75% open metal fencinf and ada compliant gate. installation of 2 metal sidewalk planters and new plant materialDetails
ground floor: removal of (e) wood lattice trellis and plantinf in raised sidewalk bed and replacement with new >75% open metal fencinf and ada compliant gate. installation of 2 metal sidewalk planters and new plant material | $50,000 |