Rockwell Group Construction
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to Jul 2006
- Last 24 months
- 0 permits filed
18 permits since 2000: 9 completed, 9 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2003 | Expired or cancelled expired Aug 2007 | 4043 26th St | replace the old deck to the same specifications in accordance with the engineers plansDetails
replace the old deck to the same specifications in accordance with the engineers plans | $10,000 |
| Jun 2, 2003 | Completed final sign-off Oct 2003 | 422 09th Av | some water leakage was found in each of the front decks, we did some one drills in the stucco, and wDetails
some water leakage was found in each of the front decks, we did some one drills in the stucco, and w | $12,000 |