Back to bathroom remodel contractors
Roca Enviro Works
- Based in
- San Leandro
- On San Francisco permits
- Feb 2014 to Apr 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2018 | Completed final sign-off Jan 2019 | 154 Ocean Av | replace kitchen cabinets. remodel upper bathroom. no change in placement of fixtures or walls. new sheetrock in garage, 5/8 type x sheetrockDetails
replace kitchen cabinets. remodel upper bathroom. no change in placement of fixtures or walls. new sheetrock in garage, 5/8 type x sheetrock | $85,000 |
| Jul 24, 2014 | Completed final sign-off Jan 2015 | 1050 North Point St | electrical upgrades: install new recess lights, invert electerical panel. all new lighting lights shall be high efficacy. plumbing upgrades: install new mix valve (shower) bathroom remodel (e) exh. fan. building upgrades: patch affected areas by plumbing and electrical work.Details
electrical upgrades: install new recess lights, invert electerical panel. all new lighting lights shall be high efficacy. plumbing upgrades: install new mix valve (shower) bathroom remodel (e) exh. fan. building upgrades: patch affected areas by plumbing and electrical work. | $30,000 |
| Feb 13, 2014 | Completed final sign-off Jun 2014 | 1050 North Point St | unit #1007 - remodel kitchen & bathroom, replace furniture, add countertop, enlarge closet removing walls. replace regular door of bathroom for sliding door, put new fixtures & new tile floor.Details
unit #1007 - remodel kitchen & bathroom, replace furniture, add countertop, enlarge closet removing walls. replace regular door of bathroom for sliding door, put new fixtures & new tile floor. | $18,000 |