Back to kitchen remodel contractors
Robison Nieri White Construction
- Based in
- So. San Francisco
- On San Francisco permits
- Aug 2002 to May 2026
- Last 24 months
- 3 permits filed
244 permits since 2000: 221 completed, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
78 kitchen remodel permits: 74 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 217 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2024 | Completed final sign-off Mar 2026 | 1090 Chestnut St | unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishesDetails
unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishes | $350,786 |
| Aug 20, 2024 | Completed final sign-off Jul 2025 | 188 Minna St | unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting.Details
unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting. | $220,000 |
| Feb 5, 2024 | Completed final sign-off Oct 2024 | 239 Brannan St | interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes.Details
interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes. | $62,000 |
| Apr 7, 2023 | Completed final sign-off Sep 2023 | 1333 Jones St | new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in sameDetails
new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in same | $30,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removedDetails
unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removed | $250,000 |
| Jan 15, 2020 | Completed final sign-off May 2022 | 1090 Chestnut St | interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishesDetails
interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishes | $210,000 |
| Aug 26, 2019 | Completed final sign-off Jul 2020 | 1333 Jones St | kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.wDetails
kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.w | $150,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 1090 Chestnut St | complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not reqDetails
complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not req | $100,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2022 | 1090 Chestnut St | all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work.Details
all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work. | $350,000 |
| Aug 1, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishesDetails
remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishes | $103,000 |
| May 22, 2018 | Completed final sign-off Mar 2021 | 1090 Chestnut St | ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures.Details
ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures. | $250,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 229 Brannan St | unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work.Details
unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work. | $25,000 |
| Feb 6, 2018 | Completed final sign-off Feb 2021 | 3449 Pacific Av | basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile,Details
basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile, | $250,000 |
| Nov 2, 2017 | Completed final sign-off Jul 2018 | 1170 Sacramento St | remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural workDetails
remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural work | $350,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2017 | 1170 Sacramento St | remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural workDetails
remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural work | $350,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 229 Brannan St | master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maherDetails
master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maher | $17,000 |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 840 Powell St | kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work.Details
kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work. | $150,000 |
| Jan 17, 2017 | Completed final sign-off Feb 2021 | 79 Valley St | new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living roomDetails
new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living room | $1,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 2164 Hyde St | unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work.Details
unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work. | $60,000 |
| Oct 21, 2016 | Completed final sign-off Apr 2017 | 79 Valley St | remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout.Details
remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout. | $80,000 |
| Sep 30, 2016 | Completed final sign-off Aug 2017 | 1750 Taylor St | #1802: kitchen remodel: (n) cabinets, countertops, & appl. in same location as (e). new hardwood floors in kitchen, living room and two bedrooms, total approx. 1000 sf. no structural work. no change in wall and opening layout. lighting change will invoke 50% min watt. of high efficacy fixturesDetails
#1802: kitchen remodel: (n) cabinets, countertops, & appl. in same location as (e). new hardwood floors in kitchen, living room and two bedrooms, total approx. 1000 sf. no structural work. no change in wall and opening layout. lighting change will invoke 50% min watt. of high efficacy fixtures | $90,000 |
| Sep 30, 2016 | Completed final sign-off Aug 2017 | 219 Brannan St | unit #18a: replace (e) sheetrock ceiling area in living room, approx. 250 sq. ft. new hardwood floors in living room, dining room, hallway and kitchen, approx. 2500 sq. ft, throughout unit. no structural work.Details
unit #18a: replace (e) sheetrock ceiling area in living room, approx. 250 sq. ft. new hardwood floors in living room, dining room, hallway and kitchen, approx. 2500 sq. ft, throughout unit. no structural work. | $40,000 |
| Jun 16, 2016 | Completed final sign-off Dec 2016 | 239 Brannan St | interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishesDetails
interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishes | $58,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 229 Brannan St | kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no strucDetails
kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no struc | $125,000 |
| May 19, 2016 | Completed final sign-off Oct 2016 | 229 Brannan St | kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work.Details
kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work. | $50,000 |
| May 11, 2016 | Completed final sign-off Sep 2016 | 35 Dolores St | furnish & install bookcases/computer desk in the kitchen. no structural work.Details
furnish & install bookcases/computer desk in the kitchen. no structural work. | $10,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2016 | 2743 Baker St | kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher naDetails
kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher na | $75,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 1750 Taylor St | unit #602: kitchen: new door and drawer fronts on all cabinetry, new counter tops, new plugs and recessed lighting in some locations. no structural work.Details
unit #602: kitchen: new door and drawer fronts on all cabinetry, new counter tops, new plugs and recessed lighting in some locations. no structural work. | $12,000 |
| May 18, 2015 | Completed final sign-off Aug 2016 | 1080 Chestnut St | kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining roomDetails
kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining room | $125,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 1750 Taylor St | cut holes for electrician in 2 bedrms & living room, remove marble backsplash at hood area in kitchen & replace with mirror. repaint kitchen. patch & paint throughout unit. no structural work, replace in kind for fire protection.Details
cut holes for electrician in 2 bedrms & living room, remove marble backsplash at hood area in kitchen & replace with mirror. repaint kitchen. patch & paint throughout unit. no structural work, replace in kind for fire protection. | $16,500 |
| Jan 20, 2015 | Completed final sign-off Jun 2015 | 1100 Union St | kitchen remodel: new cabinets, countertops, flooring, tile, appliances, plumbing fixtures in same location. new recessed lights, new hood using existing exhaust duct work, painting. no structural work. n/a ordinance #155-13.Details
kitchen remodel: new cabinets, countertops, flooring, tile, appliances, plumbing fixtures in same location. new recessed lights, new hood using existing exhaust duct work, painting. no structural work. n/a ordinance #155-13. | $58,000 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 301 Main St | non structural work open ceiling for electrician, sheetrock and patch for surface mounted light fixture approx 30 ft . open a dropped ceiling in the kitchen sheetrock of approx 30 sq ft work only in unit #21g no changes to doors or windows.Details
non structural work open ceiling for electrician, sheetrock and patch for surface mounted light fixture approx 30 ft . open a dropped ceiling in the kitchen sheetrock of approx 30 sq ft work only in unit #21g no changes to doors or windows. | $2,000 |
| Jun 19, 2013 | Completed final sign-off Jun 2014 | 611 Washington St | #2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting.Details
#2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting. | $75,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 229 Brannan St | kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location.Details
kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location. | $35,000 |
| May 10, 2013 | Completed final sign-off Jul 2013 | 338 Spear St | new kitchen countertop, new carpet, new shower enclosure, paint throughout, no structural work, no change on walls.Details
new kitchen countertop, new carpet, new shower enclosure, paint throughout, no structural work, no change on walls. | $25,000 |
| Apr 18, 2013 | Completed final sign-off Jan 2014 | 46 Heather Av | install washer/dryer in closet. kitchen new countertops, new floor, appliances, new plumbing fixtures, paint. no structural work. provide louvered door for makeup air. dryer exhaust termination 3' from p.l. and openings. max. length for exhaust 14' per code. no penetration into exit component.Details
install washer/dryer in closet. kitchen new countertops, new floor, appliances, new plumbing fixtures, paint. no structural work. provide louvered door for makeup air. dryer exhaust termination 3' from p.l. and openings. max. length for exhaust 14' per code. no penetration into exit component. | $10,000 |
| Apr 18, 2013 | Completed final sign-off May 2014 | 1090 Chestnut St | unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k).Details
unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k). | $180,000 |
| Jan 11, 2013 | Completed final sign-off Dec 2013 | 1080 Chestnut St | kitchen & two bathroom: remove & replace in same locations plumbing fixtures, outlets, cabinetry & countertops. new tile. painting throughout unit. no structural workDetails
kitchen & two bathroom: remove & replace in same locations plumbing fixtures, outlets, cabinetry & countertops. new tile. painting throughout unit. no structural work | $100,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 1080 Chestnut St | new kitchen countertops. painting throughout unit, minor electrcial work. no structural workDetails
new kitchen countertops. painting throughout unit, minor electrcial work. no structural work | $10,000 |
| Jul 30, 2012 | Completed final sign-off Mar 2013 | 1080 Chestnut St | kitchen, master bath & powder room: remove & replace in same locations, plumbing fixtures, outlets cabinetry & counter tops. new tile & paint. no structural work. no change on walls and opening. (e0 bathroom exit to remain, bathroom % 50% kitchen lighting shall be high efficacy.Details
kitchen, master bath & powder room: remove & replace in same locations, plumbing fixtures, outlets cabinetry & counter tops. new tile & paint. no structural work. no change on walls and opening. (e0 bathroom exit to remain, bathroom % 50% kitchen lighting shall be high efficacy. | $125,000 |
| Mar 5, 2012 | Completed final sign-off Aug 2012 | 1080 Chestnut St | kitchen: remove/replsace with new, same locations plumbing fixtures, outlets, cabinetry & countertops. new stone tile & paint. 2 bathrooms: remove/replace with new, same location plumbing fixtures, outlets, vanities & coutertops. new sone tile & paint. no structural work. lighting to comply cec150(kDetails
kitchen: remove/replsace with new, same locations plumbing fixtures, outlets, cabinetry & countertops. new stone tile & paint. 2 bathrooms: remove/replace with new, same location plumbing fixtures, outlets, vanities & coutertops. new sone tile & paint. no structural work. lighting to comply cec150(k | $100,000 |
| Oct 28, 2011 | Completed final sign-off Jan 2012 | 1 Atalaya Tr | kitchen remodel: remove and replace with new in same locations, plumbing fixtures, outlets, appliances, cabinets, countertops, tile & paint. no structural work. all (n) lighting must comply with cec150(k)Details
kitchen remodel: remove and replace with new in same locations, plumbing fixtures, outlets, appliances, cabinets, countertops, tile & paint. no structural work. all (n) lighting must comply with cec150(k) | $40,000 |
| Jul 18, 2011 | Completed final sign-off Apr 2012 | 2164 Hyde St | complete remodel of kitchen & 3 bathrooms-plumbing & electrical, cabinets, tile, paint. no structural work. plumbing & electrical fixtures in same locations. kitchen at least 50% high eff (he) lighting, bathroom he or occupancy sensor, cec 150(c)Details
complete remodel of kitchen & 3 bathrooms-plumbing & electrical, cabinets, tile, paint. no structural work. plumbing & electrical fixtures in same locations. kitchen at least 50% high eff (he) lighting, bathroom he or occupancy sensor, cec 150(c) | $260,000 |
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 2675 Green St | kitchen remodel-(e) cabinets, new appliances, countertops, tile, floor, paint, plumbing & electrical. no structural work, plumbing & electrical fixtures in same locations. comply cec 150 (k)Details
kitchen remodel-(e) cabinets, new appliances, countertops, tile, floor, paint, plumbing & electrical. no structural work, plumbing & electrical fixtures in same locations. comply cec 150 (k) | $50,000 |
| Mar 28, 2011 | Completed final sign-off Oct 2011 | 1080 Chestnut St | kitchen: remove & replace with new in same locations. plumbing fixtures, outlets, cabinetry & counter tops. new stone, tile & paint. (2) bathrooms; remove & replace with new in same location plumbing fixtures, outlets, vanities & counter tops. new stone, tile & paint. no structural work.Details
kitchen: remove & replace with new in same locations. plumbing fixtures, outlets, cabinetry & counter tops. new stone, tile & paint. (2) bathrooms; remove & replace with new in same location plumbing fixtures, outlets, vanities & counter tops. new stone, tile & paint. no structural work. | $150,000 |
| Apr 23, 2010 | Completed final sign-off Sep 2010 | 850 Powell St | kitchen: remove & replace with new in same location plumbing fixtures, outlets & countertop install owner supplied cabinetrs & appliances, new hardwood flr; provide high efficiency lights per cecDetails
kitchen: remove & replace with new in same location plumbing fixtures, outlets & countertop install owner supplied cabinetrs & appliances, new hardwood flr; provide high efficiency lights per cec | $20,000 |
| Apr 23, 2010 | Completed final sign-off Dec 2010 | 1750 Taylor St | unit #802: kitchen: remove & repl with new in same location plumbing fixtures, outlets, cabinets, appliances, & countertop, paint: masterbath: remove & repl with new in same locations, guest bath- remove & repl with new; new hardwood flooring in living rm, provide high efficiency lights per cecDetails
unit #802: kitchen: remove & repl with new in same location plumbing fixtures, outlets, cabinets, appliances, & countertop, paint: masterbath: remove & repl with new in same locations, guest bath- remove & repl with new; new hardwood flooring in living rm, provide high efficiency lights per cec | $80,000 |
| Dec 23, 2009 | Completed final sign-off Mar 2010 | 343 Frederick St | apt 2: kitchen remodel. remove and replace in same location cabinets, plumbing fixtures, electrical plugs. new kitchen countertop. paint. no structural workDetails
apt 2: kitchen remodel. remove and replace in same location cabinets, plumbing fixtures, electrical plugs. new kitchen countertop. paint. no structural work | $20,000 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 1170 Sacramento St | kitchen remove + replace swith new in same location plumbing fixtures, outlets, cabinets, appliance + granite countertop. paint. master bath-remove + replace with new in same locations plumbing fixtures, outlets, vanity + countertop. new tile + paint. guest bath + powder room: remove + replace withDetails
kitchen remove + replace swith new in same location plumbing fixtures, outlets, cabinets, appliance + granite countertop. paint. master bath-remove + replace with new in same locations plumbing fixtures, outlets, vanity + countertop. new tile + paint. guest bath + powder room: remove + replace with | $55,000 |
| Jun 19, 2008 | Completed final sign-off Jan 2009 | 2622 Jackson St | all work in kitchen, remove old cabinets, countertops & appliances, replace with new in same locations, new hardwood floor, no structural workDetails
all work in kitchen, remove old cabinets, countertops & appliances, replace with new in same locations, new hardwood floor, no structural work | $100,000 |
| Feb 29, 2008 | Completed final sign-off Oct 2008 | 1333 Jones St | remove and replace with new in existing locations. cabinets, countertops, appliances in kitchen. remove and replace with new existing locations vanieties, fixtures, lighting, and finishes in guest and master bathrooms. no structural work.Details
remove and replace with new in existing locations. cabinets, countertops, appliances in kitchen. remove and replace with new existing locations vanieties, fixtures, lighting, and finishes in guest and master bathrooms. no structural work. | $100,000 |
| Feb 1, 2008 | Completed final sign-off May 2008 | 1170 Sacramento St | #6b- remodel (e) kitchen: remove and replace with (n) cabinets, countertops and appliances in same locations. new hardwood floor. electrical and plumbing to install new appliances under seperate permits. paint. no structural work.Details
#6b- remodel (e) kitchen: remove and replace with (n) cabinets, countertops and appliances in same locations. new hardwood floor. electrical and plumbing to install new appliances under seperate permits. paint. no structural work. | $30,000 |
| Jan 8, 2008 | Completed final sign-off May 2008 | 1333 Jones St | in unit 1510 - install new hardwood flooring throughout the unit; install new countertops and appliances in the kitchen. no structural work.Details
in unit 1510 - install new hardwood flooring throughout the unit; install new countertops and appliances in the kitchen. no structural work. | $50,000 |
| Nov 14, 2007 | Completed final sign-off Jul 2008 | 2200 Sacramento St | install new cabinets in office. install new closet package in master bedroom. remove extg undercounter lights only in 1 kitchen and install new. painting throughout. no structural work at 408 unitDetails
install new cabinets in office. install new closet package in master bedroom. remove extg undercounter lights only in 1 kitchen and install new. painting throughout. no structural work at 408 unit | $30,000 |
| Aug 13, 2007 | Completed final sign-off Sep 2008 | 840 Powell St | 4th floor-remodel of apartment unit #402, demolition of closets at master bedroom, construction of new walk in closet, remodel kitchen and bathrooms; new laundry room. new finishes.Details
4th floor-remodel of apartment unit #402, demolition of closets at master bedroom, construction of new walk in closet, remodel kitchen and bathrooms; new laundry room. new finishes. | $200,000 |
| Jun 29, 2007 | Completed final sign-off Mar 2008 | 1333 Jones St | work on#1210. remove & replace w/new in (e) locations cabinets, countertops + appliances in kitchen. vanities fixtures, lighting & finishes in guest & master bathrooms. new washer & dryer in guest bath. new hardwood flooring throughout unit.no structural work.Details
work on#1210. remove & replace w/new in (e) locations cabinets, countertops + appliances in kitchen. vanities fixtures, lighting & finishes in guest & master bathrooms. new washer & dryer in guest bath. new hardwood flooring throughout unit.no structural work. | $100,000 |
| Apr 17, 2007 | Completed final sign-off Mar 2008 | 239 Brannan St | #10a- interior non-structural remodeling: (n0 structural work). conncet (merge) unit 10a to adjacent unit 10j owned by husband & wife. remodeling (interior) & re-configuration of bed #2, bed #3, no lighting work. remove kitchen counters, cabs. & appliances & remove bath #3.Details
#10a- interior non-structural remodeling: (n0 structural work). conncet (merge) unit 10a to adjacent unit 10j owned by husband & wife. remodeling (interior) & re-configuration of bed #2, bed #3, no lighting work. remove kitchen counters, cabs. & appliances & remove bath #3. | $80,000 |
| Mar 8, 2007 | Completed final sign-off Mar 2008 | 239 Brannan St | kitchen remodel. remove & replace with new cabinets + countertops. new switches + oulets. new hardwood floors in kitchen, living room + entrance hall. paint throughout. new molding in living room. no structural work. no new light fixture.Details
kitchen remodel. remove & replace with new cabinets + countertops. new switches + oulets. new hardwood floors in kitchen, living room + entrance hall. paint throughout. new molding in living room. no structural work. no new light fixture. | $125,000 |
| Feb 23, 2007 | Expired or cancelled expired Jun 2008 | 4068 18th St | maintenance & repair of existing dry rotted partitions at kitchen, add (n) floor drains & grease trap, (n) trench drain at (e) footing. no structural work under this permit.Details
maintenance & repair of existing dry rotted partitions at kitchen, add (n) floor drains & grease trap, (n) trench drain at (e) footing. no structural work under this permit. | $6,500 |
| Feb 22, 2007 | Completed final sign-off Sep 2007 | 1034 Chestnut St | work @ unit# 1038 only. kitchen & master bath remodel. remove old bath fixtures & replace with new. new shower pan, shower valve & shower enclosure. new vanity & countertop. new tile. new kitchen cabinets & counter top. remove old appliances & replace with new. replaces switches, outlets &Details
work @ unit# 1038 only. kitchen & master bath remodel. remove old bath fixtures & replace with new. new shower pan, shower valve & shower enclosure. new vanity & countertop. new tile. new kitchen cabinets & counter top. remove old appliances & replace with new. replaces switches, outlets & | $125,000 |
| Nov 14, 2006 | Completed final sign-off Aug 2008 | 125 Montalvo Av | new kitchen sink and countertops. existing kitchen cabinets to remain. remove existing bath vanity, medicine cabinet and all fixtures. replace with new. no structural work. no new lightingDetails
new kitchen sink and countertops. existing kitchen cabinets to remain. remove existing bath vanity, medicine cabinet and all fixtures. replace with new. no structural work. no new lighting | $25,500 |
| Jul 21, 2006 | Completed final sign-off Apr 2007 | 1080 Chestnut St | remocelkitchen & 2 bathrooms electrical, plumbin, cabinets flooring & paint no structural workDetails
remocelkitchen & 2 bathrooms electrical, plumbin, cabinets flooring & paint no structural work | $100,000 |
| Feb 28, 2006 | Completed final sign-off Oct 2006 | 1090 Chestnut St | kitchen + master bath remodel. replace cabinets, appliances. countertops, vanity, plumbing fixtures, tile, paint. no structural work.Details
kitchen + master bath remodel. replace cabinets, appliances. countertops, vanity, plumbing fixtures, tile, paint. no structural work. | $70,000 |
| Feb 17, 2006 | Completed final sign-off Oct 2006 | 5 Montague Pl | no structural work. remodel kitchen & (2) bathrooms replace vanities, replace kitchen cabinets, tile, countertops, hardwood floors, paint, work on upper unitDetails
no structural work. remodel kitchen & (2) bathrooms replace vanities, replace kitchen cabinets, tile, countertops, hardwood floors, paint, work on upper unit | $250,000 |
| Dec 9, 2005 | Completed final sign-off Feb 2006 | 152 Lombard St | kitchen & bath remodel. remove & replace fixtures in same location. new cabinets, tile electrical plumbing & paint, no structural workDetails
kitchen & bath remodel. remove & replace fixtures in same location. new cabinets, tile electrical plumbing & paint, no structural work | $75,000 |
| Nov 16, 2005 | Never finaled issued Nov 2005, no final | 1170 Sacramento St | general remodel of unit,power remodel kitchen,remove/replace plumbing fixtures,new lighting,counter tops & cabinets.new hardwood floors.no structural workDetails
general remodel of unit,power remodel kitchen,remove/replace plumbing fixtures,new lighting,counter tops & cabinets.new hardwood floors.no structural work | $155,000 |
| Sep 21, 2005 | Completed final sign-off Sep 2006 | 1090 Chestnut St | general remodel kitchen, master bath, guest bath + powder rm. replace plumbing + electrical fixturesDetails
general remodel kitchen, master bath, guest bath + powder rm. replace plumbing + electrical fixtures | $200,000 |
| Sep 21, 2005 | Completed final sign-off Dec 2005 | 219 Brannan St | new hardwood floors in living rm, kitchen + guest bedrm, replace light fixtures & shower valve inDetails
new hardwood floors in living rm, kitchen + guest bedrm, replace light fixtures & shower valve in | $20,000 |
| May 13, 2005 | Completed final sign-off Oct 2005 | 3074 Pacific Av | no structural work. replace existing kitchen and 2 bathrooms cabinets. replace bath fixtures.Details
no structural work. replace existing kitchen and 2 bathrooms cabinets. replace bath fixtures. | $100,000 |
| Feb 23, 2005 | Completed final sign-off Jun 2005 | 1170 Sacramento St | remodel kitchen and bath. painting, electrical and plumbing .nop structural work.Details
remodel kitchen and bath. painting, electrical and plumbing .nop structural work. | $105,000 |
| Feb 2, 2005 | Completed final sign-off Feb 2005 | 1080 Chestnut St | #16b-no structural work,remodel kitchen & 2 1/2 baths.millwork,marble,plumbing fixtures.appliances.Details
#16b-no structural work,remodel kitchen & 2 1/2 baths.millwork,marble,plumbing fixtures.appliances. | $200,000 |
| Sep 21, 2004 | Completed final sign-off Apr 2005 | 1080 Chestnut St | remodel bathroom & kitchen, hardwood flooring, electrical & plumbing, fixtures, painting, no structuDetails
remodel bathroom & kitchen, hardwood flooring, electrical & plumbing, fixtures, painting, no structu | $75,000 |
| Jul 16, 2004 | Completed final sign-off Mar 2005 | 1170 Sacramento St | remodel (2) bathroom + kitchen. plumbing, electrical, hardwood floors, paint. no structural work.Details
remodel (2) bathroom + kitchen. plumbing, electrical, hardwood floors, paint. no structural work. | $75,000 |
| Jul 7, 2004 | Completed final sign-off Feb 2005 | 1080 Chestnut St | remodel kitchen and bath. sheetrock and paintDetails
remodel kitchen and bath. sheetrock and paint | $23,000 |
| Feb 11, 2004 | Completed final sign-off May 2004 | 2017 Grant Av | kitchen remodel - includes new cabinets, appliances, countertop, flooring, plumbing/electricalDetails
kitchen remodel - includes new cabinets, appliances, countertop, flooring, plumbing/electrical | $45,000 |
| Jan 12, 2004 | Completed final sign-off Oct 2004 | 1333 Jones St | general remodel of kitchen & master bath. partial remodel of guest bath. includes new plumbingDetails
general remodel of kitchen & master bath. partial remodel of guest bath. includes new plumbing | $145,000 |
| Feb 14, 2003 | Completed final sign-off Jun 2003 | 1901 California St | kitchen remodel, new cabinets,countertop,appliances, flooring. master bedroom closet remodel no struDetails
kitchen remodel, new cabinets,countertop,appliances, flooring. master bedroom closet remodel no stru | $25,000 |
| Sep 18, 2002 | Completed final sign-off Feb 2003 | 1080 Chestnut St | #6b- install ready made cabinets @ kitchen 2 vanities & a new shower at bathDetails
#6b- install ready made cabinets @ kitchen 2 vanities & a new shower at bath | $14,000 |