Back to bathroom remodel contractors
Robert Thomas Construction
- Based in
- Martinez
- On San Francisco permits
- Aug 2011 to Mar 2020
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2019 | Completed final sign-off Nov 2020 | 1170 Sacramento St | revision to app#201910305939. shower pan, remodel kitchen and full guest bath.Details
revision to app#201910305939. shower pan, remodel kitchen and full guest bath. | $5,000 |
| Oct 30, 2019 | Completed final sign-off Nov 2020 | 1170 Sacramento St | apt 14d: remodel ktichen & full guest bathroom, no change of walls or openings layout. maintain speartion between units.Details
apt 14d: remodel ktichen & full guest bathroom, no change of walls or openings layout. maintain speartion between units. | $45,000 |
| Mar 6, 2017 | Expired or cancelled expired Oct 2019 | 1170 Sacramento St | remodel (e) bathroom with shower unit, sink & toilet. add additional toilet & sink in (e) clsoet that was once a bath. demo (e) non-load walls in previous powder bath & add new walls.Details
remodel (e) bathroom with shower unit, sink & toilet. add additional toilet & sink in (e) clsoet that was once a bath. demo (e) non-load walls in previous powder bath & add new walls. | $20,000 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 2266 Pacific Av | convert hall closet to stocked laundry-ventless dryer, replace fan in bathroom, replace lighitng in bath with led.Details
convert hall closet to stocked laundry-ventless dryer, replace fan in bathroom, replace lighitng in bath with led. | $2,000 |
| Jun 30, 2016 | Completed final sign-off Apr 2017 | 2266 Pacific Av | apt 4: remodel (e) bathroom in-kind dbl vanity, wall mount toi9let & remove tub& replace with tile showr. no structural changes. shower going in (e) tub enclosure.Details
apt 4: remodel (e) bathroom in-kind dbl vanity, wall mount toi9let & remove tub& replace with tile showr. no structural changes. shower going in (e) tub enclosure. | $30,000 |
| Sep 25, 2014 | Completed final sign-off Mar 2015 | 1372 Green St | remodel (e) kitchen and bathroom in-kind, no structural work, no new opening on wall, replace in-kind. compliance with maher ordinance no 155-13 not required.Details
remodel (e) kitchen and bathroom in-kind, no structural work, no new opening on wall, replace in-kind. compliance with maher ordinance no 155-13 not required. | $50,000 |
| Aug 5, 2011 | Completed final sign-off Dec 2011 | 1372 Green St | one bath romodel - remove bath tub & install shower, relocate sink and toilet, move light, switch, receptacle and install exhaust fan, shower fan and tile in shower.Details
one bath romodel - remove bath tub & install shower, relocate sink and toilet, move light, switch, receptacle and install exhaust fan, shower fan and tile in shower. | $20,000 |