Back to bathroom remodel contractors
Robert Rainsford
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Jun 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2023 | Expired or cancelled cancelled Feb 2025 | 865 25th Av | home office space upgrade:new wood flooring,dig out of floor in entrance area.install electric floor heating; insulate ceiling and walls, install recessed ceilings lights, renew electrical wiring & outlets; paint surfaces.install new office door, new step into entrance area. bathroom remodel.Details
home office space upgrade:new wood flooring,dig out of floor in entrance area.install electric floor heating; insulate ceiling and walls, install recessed ceilings lights, renew electrical wiring & outlets; paint surfaces.install new office door, new step into entrance area. bathroom remodel. | $80,000 |
| Mar 27, 2015 | Completed final sign-off Nov 2015 | 256 30th Av | remodel existing kitchen and 3 bathrooms on upper tow levels. no change in walls & opening layout - high efficacy lighting for min 50% wattage in kitchen; high efficacy lighting in bathroom or controlled by manuel on switches & one main light as high efficacy.Details
remodel existing kitchen and 3 bathrooms on upper tow levels. no change in walls & opening layout - high efficacy lighting for min 50% wattage in kitchen; high efficacy lighting in bathroom or controlled by manuel on switches & one main light as high efficacy. | $150,000 |