Back to bathroom remodel contractors
Robert J Chorak
- Based in
- Lafayette
- On San Francisco permits
- Jun 2005 to Apr 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2013 | Completed final sign-off Jun 2013 | 2750 Harrison St | replace kitchen cabinets, insulate kitchen exterior walls, install new solid surface kitchen. new tile in showers, new toilets, new lavys, new shower doors in bathrooms, replace back exterior door.Details
replace kitchen cabinets, insulate kitchen exterior walls, install new solid surface kitchen. new tile in showers, new toilets, new lavys, new shower doors in bathrooms, replace back exterior door. | $16,000 |
| Nov 22, 2011 | Completed final sign-off Dec 2012 | 711 Shotwell St | revision to pa# 2011-0624-8877-revise layout & sizes of windows & doors. add solar tube to master closet, revise location of back deck stairs, revise location of bathroom toilet & revise structuralDetails
revision to pa# 2011-0624-8877-revise layout & sizes of windows & doors. add solar tube to master closet, revise location of back deck stairs, revise location of bathroom toilet & revise structural |