Back to bathroom remodel contractors
Robert Bernhard Coatings/Rbc Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to May 2026
- Last 24 months
- 19 permits filed
61 permits since 2000: 52 completed, 2 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 15 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2024 | Completed final sign-off Jul 2026 | 515 Noriega St | strip down 2 bathrooms replace all fixtures and floorings prime and paint -in kindDetails
strip down 2 bathrooms replace all fixtures and floorings prime and paint -in kind | $40,000 |
| Oct 9, 2024 | Completed final sign-off Jul 2025 | 350 Noriega St | remodel (e) kitchen and bathrooom on upper level. convert unfinished space in lower level to habitable space. included: bathroom, laundry area, and bedroom. replace street facing windows with fiber glass windows. new windows at south elevationDetails
remodel (e) kitchen and bathrooom on upper level. convert unfinished space in lower level to habitable space. included: bathroom, laundry area, and bedroom. replace street facing windows with fiber glass windows. new windows at south elevation | $80,000 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 25 Justin Dr | garage level: build office room and bath. add one new window and one replacement.Details
garage level: build office room and bath. add one new window and one replacement. | $45,000 |
| Dec 23, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | kitchen & bathroom remodel: replace plumbing, fixtures and appliances with no change to originall location. new cabinets and counters, new flooring in kitchen,bathroom and master bedroomDetails
kitchen & bathroom remodel: replace plumbing, fixtures and appliances with no change to originall location. new cabinets and counters, new flooring in kitchen,bathroom and master bedroom | $60,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306Details
repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306 | $300,000 |
| Mar 2, 2022 | Completed final sign-off Apr 2023 | 3330 Folsom St | remodel bathroom on 2nd floor; infill existing opening on property line w/ 1-hr rated wall; no structural workDetails
remodel bathroom on 2nd floor; infill existing opening on property line w/ 1-hr rated wall; no structural work | $27,500 |