Back to bathroom remodel contractors
Robert B Lewis Const.
- Based in
- San Framcisco
- On San Francisco permits
- Jul 2002 to Feb 2009
- Last 24 months
- 0 permits filed
Also written on permits as: Robert Lewis Construction Inc.
55 permits since 2000: 32 completed, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 12 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2008 | Completed final sign-off May 2008 | 167 05th Av | kitchen and bathroom remodel, no structural work. replacement of 2 existing windows in affected areaDetails
kitchen and bathroom remodel, no structural work. replacement of 2 existing windows in affected area | $85,000 |
| Mar 10, 2008 | Never finaled issued Mar 2008, no final | 3850 Washington St | replace all fixtures and wall finishes in master bathroom on upper floor. no structural work. new lights to be high efficancy or manual on auto-off switch.Details
replace all fixtures and wall finishes in master bathroom on upper floor. no structural work. new lights to be high efficancy or manual on auto-off switch. | $30,000 |
| Nov 1, 2007 | Completed final sign-off Jan 2008 | 1333 Jones St | remodel (e) master bath (partial)-new shower, tile, vanity to remain, new glass enclosure and valves, add track lighting in master bedroom, living and guestroom. new cork flooring, no new bath lightingDetails
remodel (e) master bath (partial)-new shower, tile, vanity to remain, new glass enclosure and valves, add track lighting in master bedroom, living and guestroom. new cork flooring, no new bath lighting | $35,000 |
| Oct 22, 2007 | Completed final sign-off Apr 2008 | 1719 Webster St | single family-remove chimmey on 1st flr. install new windows sash only -same in kind on 2nd & 3rd floors.(visable from street). upgrade electrical on 3rd level. install hvac in attic for third flr. add master bath third floor. cosmetic improvements to floors and walls throughout.Details
single family-remove chimmey on 1st flr. install new windows sash only -same in kind on 2nd & 3rd floors.(visable from street). upgrade electrical on 3rd level. install hvac in attic for third flr. add master bath third floor. cosmetic improvements to floors and walls throughout. | $75,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 49 Florence St | fixture & finish replacement 2 bathroom, 1 kitchen cabinet & fixture replacement. new electrical lighting. no structural work.Details
fixture & finish replacement 2 bathroom, 1 kitchen cabinet & fixture replacement. new electrical lighting. no structural work. | $93,500 |
| Aug 9, 2006 | Completed final sign-off Jan 2007 | 241 Telegraph Hill Bl | kitchen cabinet and fixture replacement. master bath tile and fixture replacement. guest bath tile and fixture replacement. new lighting (recessed) all work in unit #4. no structural work.Details
kitchen cabinet and fixture replacement. master bath tile and fixture replacement. guest bath tile and fixture replacement. new lighting (recessed) all work in unit #4. no structural work. | $77,000 |
| Jul 12, 2005 | Expired or cancelled expired Mar 2007 | 5060 Diamond Heights Bl | kitchen cabinet; appliance & top replacement bathroom remodel, new hardwood floor; like in kindDetails
kitchen cabinet; appliance & top replacement bathroom remodel, new hardwood floor; like in kind | $35,000 |
| Apr 7, 2005 | Completed final sign-off Sep 2005 | 2640 Lyon St | installation of ground fl. bedroom & bathroom.Details
installation of ground fl. bedroom & bathroom. | $21,000 |
| Apr 6, 2005 | Completed final sign-off Sep 2005 | 2640 Lyon St | fixture and finish replacement of kitchen, cabinets/cntrtp, fixt/finish replacement 2- 1/2 baths, 2Details
fixture and finish replacement of kitchen, cabinets/cntrtp, fixt/finish replacement 2- 1/2 baths, 2 | $75,000 |
| Nov 5, 2004 | Expired or cancelled expired Jan 2009 | 17 West Clay St | fixture & finish repl in (1) master bathDetails
fixture & finish repl in (1) master bath | $45,000 |
| Aug 28, 2003 | Never finaled issued Aug 2003, no final | 3739 16th St | unit 2-remodel bathroom-remove interior plaster finish&trim.insulate&drywall.no structural work.Details
unit 2-remodel bathroom-remove interior plaster finish&trim.insulate&drywall.no structural work. | $35,000 |
| Jul 7, 2003 | Completed final sign-off Oct 2003 | 1201 California St | remodel master bathroom in unit 1302.Details
remodel master bathroom in unit 1302. | $15,000 |
| May 28, 2003 | Never finaled issued May 2003, no final | 1075 California St | remodel #10 bathrooms on 9th, 10th & 11th floors.Details
remodel #10 bathrooms on 9th, 10th & 11th floors. | $36,000 |
| Apr 4, 2003 | Completed final sign-off Sep 2003 | 1075 California St | #408 & 308- remodel bathroom in guest roomsDetails
#408 & 308- remodel bathroom in guest rooms | $24,000 |
| Apr 4, 2003 | Never finaled issued Apr 2003, no final | 1075 California St | #1111 & 1011- remodel guest room bathroomDetails
#1111 & 1011- remodel guest room bathroom | $24,000 |
| Jan 22, 2003 | Completed final sign-off Oct 2003 | 1201 California St | bathroom remodel (finishes/fixture only) replace doors/trim in entry. built in cabinetry installatioDetails
bathroom remodel (finishes/fixture only) replace doors/trim in entry. built in cabinetry installatio | $35,000 |
| Aug 30, 2002 | Completed final sign-off Oct 2003 | 271 Missouri St | creat 2 bedrms & 1 bath in (e)space on lower levelDetails
creat 2 bedrms & 1 bath in (e)space on lower level | $28,500 |
| Aug 30, 2002 | Never finaled issued Aug 2002, no final | 880 Castro St | tile & fixture replacement in 2 bath & kitchen remodel ;no change in wall locationsDetails
tile & fixture replacement in 2 bath & kitchen remodel ;no change in wall locations | $33,500 |
| Jul 10, 2002 | Completed final sign-off Mar 2003 | 271 Missouri St | kichen & bath remodel: replace fixtures, appliances, electrical, plumbing,new wall finishesDetails
kichen & bath remodel: replace fixtures, appliances, electrical, plumbing,new wall finishes | $35,000 |