Back to bathroom remodel contractors
Rms Maintenance Serv Inc
- Based in
- Oakland
- On San Francisco permits
- May 2009 to Jun 2017
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 2662 24th Av | bathroom remodel - upgrade all plumbing and electrical to current code, add exhaust fan, no change to floor plan.Details
bathroom remodel - upgrade all plumbing and electrical to current code, add exhaust fan, no change to floor plan. | $24,000 |
| Jun 11, 2015 | Completed final sign-off Jun 2015 | 845 Montgomery St | building inspector asked for work to be reevaluated from $18,074 to $70,000. kitchen & bathrooms remodel. revision to permit application #201410068211.Details
building inspector asked for work to be reevaluated from $18,074 to $70,000. kitchen & bathrooms remodel. revision to permit application #201410068211. | $18,074 |
| Oct 6, 2014 | Completed final sign-off Jun 2015 | 845 Montgomery St | kitchen and bath remodel - new appliances, countertops, cabinets, move (e) toilet 18", relocate faucet sets into wall. re-use (e) exhaust fans. pull new electricalcircuits for kitchen appliances.Details
kitchen and bath remodel - new appliances, countertops, cabinets, move (e) toilet 18", relocate faucet sets into wall. re-use (e) exhaust fans. pull new electricalcircuits for kitchen appliances. | $18,074 |
| Sep 12, 2014 | Completed final sign-off Jan 2015 | 2459 Pacific Av | bathroom remodel. change (e) tub/shower into shower stall. re-use (e) shower fan. remodel will follow all (e) current building codes. no structural change.Details
bathroom remodel. change (e) tub/shower into shower stall. re-use (e) shower fan. remodel will follow all (e) current building codes. no structural change. | $17,268 |
| Jun 6, 2014 | Completed final sign-off Oct 2014 | 1958 Vallejo St | existing bathroom remodel will comform to new plumbing and electrical codes. will not alter plan configurationDetails
existing bathroom remodel will comform to new plumbing and electrical codes. will not alter plan configuration | $12,677 |
| May 16, 2013 | Completed final sign-off Oct 2013 | 280 30th Av | demo extg baths (2) move plmbg and electrical, add new exhaust fan units, add insulation, new tile and bathtub as per plans.Details
demo extg baths (2) move plmbg and electrical, add new exhaust fan units, add insulation, new tile and bathtub as per plans. | $50,000 |
| Feb 10, 2012 | Completed final sign-off May 2012 | 236 Ritch St | bathroom - tear out existing bathroom to studs and sub flooring, move plumbing in tub/shower toopposite wall, add new down lighting, new stone and tile surfaces, add new plumbing fixtures & bath vanity, use existing exhaust fan & high efficency lighting.Details
bathroom - tear out existing bathroom to studs and sub flooring, move plumbing in tub/shower toopposite wall, add new down lighting, new stone and tile surfaces, add new plumbing fixtures & bath vanity, use existing exhaust fan & high efficency lighting. | $60,000 |
| Jan 14, 2011 | Completed final sign-off Oct 2011 | 2450 Steiner St | remove and replace tile floor, remove tile main scott, provide h.e. lgihts or o.s. repl with wood, remove (e) built-in tub, repl with free standing claw foot, repl (e) drywall, 3rd flr bath, install french doors on existing window header @front of the not visible from front of building/street, buildDetails
remove and replace tile floor, remove tile main scott, provide h.e. lgihts or o.s. repl with wood, remove (e) built-in tub, repl with free standing claw foot, repl (e) drywall, 3rd flr bath, install french doors on existing window header @front of the not visible from front of building/street, build | $24,000 |