Rivera Construction & Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Aug 2025 to Aug 2026
- Last 24 months
- 13 permits filed
13 permits since 2000: 6 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 1921 08th Av | remove handrails and bricks to repair damages membrene and install new water proofing liquid membrane for exterior stair repairs. install and repair new risers, re install new metal hand rails and guard rails. front of bldg less than 50 % repairs.Details
remove handrails and bricks to repair damages membrene and install new water proofing liquid membrane for exterior stair repairs. install and repair new risers, re install new metal hand rails and guard rails. front of bldg less than 50 % repairs. | $12,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 4722 Balboa St | sheathing repair: repair damaged plywood, replace new 4x8x5/8 cdx as roof sheathing, install new waterproofimg 30# felt paper and install new asphalt shingles gutter, downspots. area is 22'x22'. no structual work. roofing pa 202607155107Details
sheathing repair: repair damaged plywood, replace new 4x8x5/8 cdx as roof sheathing, install new waterproofimg 30# felt paper and install new asphalt shingles gutter, downspots. area is 22'x22'. no structual work. roofing pa 202607155107 | $4,500 |
| Jul 15, 2026 | In progress issued Jul 2026 | 4722 Balboa St | re-roofing remove existing asphalt shingles and replace as per kind in area os 'x22'install new water proofing. no hot works. ref pa 202607155104Details
re-roofing remove existing asphalt shingles and replace as per kind in area os 'x22'install new water proofing. no hot works. ref pa 202607155104 | $1,500 |
| Dec 11, 2025 | In progress issued Dec 2025 | 1300 12th Av | reroofing: remove existing asphalt shingles and replace inkind, tear-off only, not hot works. roof is street visible. ref #202512111559Details
reroofing: remove existing asphalt shingles and replace inkind, tear-off only, not hot works. roof is street visible. ref #202512111559 | $10,000 |
| Dec 11, 2025 | In progress issued Dec 2025 | 1300 12th Av | on the roof -replace damage plywood in area of leaking, approx 3 squares.Details
on the roof -replace damage plywood in area of leaking, approx 3 squares. | $1,800 |
| Dec 5, 2025 | In progress issued Aug 2026 | 1073 Hampshire St | remodel a unit in second floor. relocate kitchen to bedroom area , and move bedroom to kitchen area. rehabilitate bathroom and relocate sink.Details
remodel a unit in second floor. relocate kitchen to bedroom area , and move bedroom to kitchen area. rehabilitate bathroom and relocate sink. | $85,000 |
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 318 31st Av | reroofing: remove (e) subroof. install 3 layers of modified bitumen torchdown and (n) shingles front of home 30 years duration: ref 202511200077.Details
reroofing: remove (e) subroof. install 3 layers of modified bitumen torchdown and (n) shingles front of home 30 years duration: ref 202511200077. | $13,000 |
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 318 31st Av | replace damaged wood in area of leak +/- 4x8x5/8 cdw plywood sheets.Details
replace damaged wood in area of leak +/- 4x8x5/8 cdw plywood sheets. | $1,500 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 913 Florida St | repair damaged wood in area of leaking at roof. replace with wood same sizes, only in dry-rot section.Details
repair damaged wood in area of leaking at roof. replace with wood same sizes, only in dry-rot section. | $7,000 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 913 Florida St | re-roofing with hot worksDetails
re-roofing with hot works | $7,000 |
| Sep 29, 2025 | Completed final sign-off Oct 2025 | 430 Connecticut St | reroofing: remove (e) roofing cover finish, flat roof. cover new roof w/same material in-kind. torch down. ref #202509296295.Details
reroofing: remove (e) roofing cover finish, flat roof. cover new roof w/same material in-kind. torch down. ref #202509296295. | $5,000 |
| Sep 29, 2025 | Completed final sign-off Oct 2025 | 430 Connecticut St | repair damaged wood in area of leaking on the roof. wood to be replaced with same lumber sizes; only in dry rot area. ref #202509296293.Details
repair damaged wood in area of leaking on the roof. wood to be replaced with same lumber sizes; only in dry rot area. ref #202509296293. | $15,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 1119 Fillmore St | change of use from vacant laundromat to new hair salon, no construction required, improvements consist of connection of (3) movable hair-washing chair/bowls to water and plumbing drain lines, installation of (3) movable, hair-cutting chairs, installation of wall-mounted mirrors and drawers.Details
change of use from vacant laundromat to new hair salon, no construction required, improvements consist of connection of (3) movable hair-washing chair/bowls to water and plumbing drain lines, installation of (3) movable, hair-cutting chairs, installation of wall-mounted mirrors and drawers. | $10,000 |