Back to bathroom remodel contractors
Rise Building
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2012 to May 2016
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2016 | Completed final sign-off Jan 2017 | 68 Hancock St | interior remodel, kitchen and baths, add one bathroomDetails
interior remodel, kitchen and baths, add one bathroom | $80,000 |
| Sep 19, 2014 | Completed final sign-off Feb 2015 | 97 Mirabel Av | remodel (2) existing bathrooms, kitchen, new can led lightsDetails
remodel (2) existing bathrooms, kitchen, new can led lights | $42,000 |
| Mar 26, 2014 | Completed final sign-off Mar 2017 | 121 Granville Wy | seismic upgrade an remodel house, includes reroofing, new baths, new kitchen and 3 dormers, (n) window openings, stucco repairs to match, roof repairs to match, (n) windows to match (e) style, new skylights, new garage door.Details
seismic upgrade an remodel house, includes reroofing, new baths, new kitchen and 3 dormers, (n) window openings, stucco repairs to match, roof repairs to match, (n) windows to match (e) style, new skylights, new garage door. | $175,000 |
| Jan 31, 2014 | Never finaled issued Jan 2014, no final | 121 Granville Wy | demo kitchen, 2 bathrooms, some sheetrock and electrical in kitchen and bathrooms, no structural workDetails
demo kitchen, 2 bathrooms, some sheetrock and electrical in kitchen and bathrooms, no structural work | $2,500 |
| Oct 18, 2013 | Completed final sign-off Apr 2014 | 97 Mirabel Av | renovate (2) bathrooms & kitchen, led in kitchen, existing lightin in bath, repair dry rot on (2) decks & bring ballasters to code, replace (2) windows with energy efficient at rear of house, replace (2) siding glass doors with max u factor 0.40, existing exhaust,Details
renovate (2) bathrooms & kitchen, led in kitchen, existing lightin in bath, repair dry rot on (2) decks & bring ballasters to code, replace (2) windows with energy efficient at rear of house, replace (2) siding glass doors with max u factor 0.40, existing exhaust, | $34,000 |