Back to bathroom remodel contractors
Rick Bertolina General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Nov 2025
- Last 24 months
- 2 permits filed
13 permits since 2000: 12 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2025 | Completed final sign-off Aug 2025 | 70 Idora Av | 1/f: remodel bathroom and build walls closing off garage per plan.Details
1/f: remodel bathroom and build walls closing off garage per plan. | $29,500 |
| Jan 27, 2023 | Completed final sign-off May 2023 | 1 Mono St | remodel one and a half bathrooms. no footprint change/all work in interior. relocate toilet/shower/vanity in master bathroom. site built shower pan. new tile and finishes. adjacent to foyer. no wall construction or demoliton. 15' x 10'Details
remodel one and a half bathrooms. no footprint change/all work in interior. relocate toilet/shower/vanity in master bathroom. site built shower pan. new tile and finishes. adjacent to foyer. no wall construction or demoliton. 15' x 10' | $34,000 |
| Sep 19, 2022 | Completed final sign-off Dec 2022 | 70 Idora Av | remodel one full bath, half bath and add non-bearning partiton walls and 2nd fl.Details
remodel one full bath, half bath and add non-bearning partiton walls and 2nd fl. | $27,000 |
| Apr 24, 2019 | Completed final sign-off Mar 2023 | 4735 19th St | horizontal & vertical addition to existing 1 story over garage. work includes reconfiguring ground floor and moving kitchen to ground floor. 3rd floor addition includes adding a master bedroom, bathroom, and office spaces.Details
horizontal & vertical addition to existing 1 story over garage. work includes reconfiguring ground floor and moving kitchen to ground floor. 3rd floor addition includes adding a master bedroom, bathroom, and office spaces. | $480,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2019 | 995 Carolina St | cosmetic upgrades to existing master bath. new plumbing fixtures in existing locations. new water heater in existing location new electrical lighting fixtures in existing location. new finishes.Details
cosmetic upgrades to existing master bath. new plumbing fixtures in existing locations. new water heater in existing location new electrical lighting fixtures in existing location. new finishes. | $25,000 |