Back to bathroom remodel contractors
Richard Kolby
- Based in
- Redwood City
- On San Francisco permits
- Jul 2005 to Aug 2016
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 1 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2016 | Completed final sign-off Sep 2016 | 67 Diamond St | remodel bath, install new tile, flooring, weinscot, tub surround; replace tub/shower valve & tub; install new 6 foot recepticle, switch, j box & romex for new vanity light; replace light.Details
remodel bath, install new tile, flooring, weinscot, tub surround; replace tub/shower valve & tub; install new 6 foot recepticle, switch, j box & romex for new vanity light; replace light. | $16,800 |
| Jun 17, 2014 | Completed final sign-off Jan 2015 | 150 Thrift St | construct 2 bedroom & full bathroom, all work at ground floor.Details
construct 2 bedroom & full bathroom, all work at ground floor. | $28,000 |
| Jun 30, 2011 | Completed final sign-off Dec 2011 | 740 Castro St | kitchen, power room, pantry remodel. remove (e) kitchen, bathroom, install new electrical, plumbing, insulation, sheetrock, cabinets & appliances. frame in new closets, lower ceiling, install new framing in bathroom & foundationDetails
kitchen, power room, pantry remodel. remove (e) kitchen, bathroom, install new electrical, plumbing, insulation, sheetrock, cabinets & appliances. frame in new closets, lower ceiling, install new framing in bathroom & foundation | $60,000 |
| May 6, 2008 | Completed final sign-off Dec 2008 | 8 Winfield St | 1st flr-remodel (e) bath w/new fixtures & finishes, remodel entry door (remove defunct constr), remodel open plan to create bedroom. general-replace (e) single gl windows with new dual gl windows in (e) openings, add voluntary shear walls, relocate attic access & pull down ladder, remodel (e) stair,Details
1st flr-remodel (e) bath w/new fixtures & finishes, remodel entry door (remove defunct constr), remodel open plan to create bedroom. general-replace (e) single gl windows with new dual gl windows in (e) openings, add voluntary shear walls, relocate attic access & pull down ladder, remodel (e) stair, | $100,000 |
| Sep 21, 2007 | Completed final sign-off Jan 2008 | 273 Dalewood Wy | remodel hall bathroom, demo wall & tub. install new plumbing for sink & tub, new gfi & lights, gfi for whirlpool tub. lighting to be fluore3scant or on occupant sensor.Details
remodel hall bathroom, demo wall & tub. install new plumbing for sink & tub, new gfi & lights, gfi for whirlpool tub. lighting to be fluore3scant or on occupant sensor. | $7,500 |
| Sep 7, 2007 | Completed final sign-off Jan 2008 | 273 Dalewood Wy | remodel bathroom in master bedroom. demo shower & install new control & tile. change vanity & bath light. install gfi.Details
remodel bathroom in master bedroom. demo shower & install new control & tile. change vanity & bath light. install gfi. | $7,500 |
| Jul 28, 2005 | Never finaled issued May 2006, no final | 7 Aztec St | work consists of interior remodel of an (e) kitchen & bath to create a new kitchen & bath within the (e) bldg footprint. (e) mono pitched roof to be replaced with a "flat" roof above portions of the remodeled kitchen.existing deck at front shall be removed to restore 1 off-street parking space.Details
work consists of interior remodel of an (e) kitchen & bath to create a new kitchen & bath within the (e) bldg footprint. (e) mono pitched roof to be replaced with a "flat" roof above portions of the remodeled kitchen.existing deck at front shall be removed to restore 1 off-street parking space. | $50,000 |