Back to bathroom remodel contractors
Richard De Nola
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 10 permits filed
84 permits since 2000: 68 completed, 2 in progress, 2 never finaled, 12 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 27 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 241 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2026 | Completed final sign-off Jun 2026 | 29 Sunview Dr | remodel bathroom in kind, tub to shower conversion, replace toilet and vanity, no structural changes.Details
remodel bathroom in kind, tub to shower conversion, replace toilet and vanity, no structural changes. | $32,000 |
| Oct 20, 2025 | Completed final sign-off Sep 2026 | 111 14th Av | remodel kitchen, laundry room and two bathrooms. no structural changes. remodel in kind. no alteration of wall, window or door.Details
remodel kitchen, laundry room and two bathrooms. no structural changes. remodel in kind. no alteration of wall, window or door. | $120,000 |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 624 11th Av | remodel 2 existing bathrooms. no strutural changes.Details
remodel 2 existing bathrooms. no strutural changes. | $60,000 |
| Sep 11, 2024 | Completed final sign-off Feb 2025 | 3 Boynton Ct | bathroom remodel. no structural changes.Details
bathroom remodel. no structural changes. | $30,000 |
| Mar 12, 2024 | Completed final sign-off Feb 2025 | 147 Vienna St | remodel kitchen and bathroom. insulate perimeter walls with r 15. upgrade all electrical wiring . service upgrade to 200amp. replace 2 rear bedroom windows.Details
remodel kitchen and bathroom. insulate perimeter walls with r 15. upgrade all electrical wiring . service upgrade to 200amp. replace 2 rear bedroom windows. | $120,000 |
| Jun 16, 2023 | Completed final sign-off Aug 2023 | 1470 Golden Gate Av | remodel 10'x8' kitchen, upgrade vanity in 2 bathrooms. upgrade tub and shower with new fixtures and wall finishes. mantain fire separation w/ 5/8" type x sheetrock.Details
remodel 10'x8' kitchen, upgrade vanity in 2 bathrooms. upgrade tub and shower with new fixtures and wall finishes. mantain fire separation w/ 5/8" type x sheetrock. | $40,000 |
| Mar 22, 2022 | Completed final sign-off May 2023 | 2122 35th Av | kitchen & bathroom remodel at 2nd fl with reconfiguration. additional bath, laundry, closet & bedroom at 1st fl.Details
kitchen & bathroom remodel at 2nd fl with reconfiguration. additional bath, laundry, closet & bedroom at 1st fl. | $53,000 |
| Oct 6, 2021 | Never finaled issued Oct 2021, no final | 1843 35th Av | remodel kitchen and bath no structural changesDetails
remodel kitchen and bath no structural changes | $35,000 |
| Apr 5, 2021 | Completed final sign-off Aug 2022 | 1843 35th Av | main level: kitchen and bath remodel. close roof over staircase. ground level: finish interiors with new bath, bedroom and family room, laundry closet. replace forced air heating system with new one.Details
main level: kitchen and bath remodel. close roof over staircase. ground level: finish interiors with new bath, bedroom and family room, laundry closet. replace forced air heating system with new one. | $175,000 |
| Feb 22, 2021 | Completed final sign-off Apr 2021 | 4019 25th St | remodel powder room and bathroom. no structual changes; replace both window, facing rearDetails
remodel powder room and bathroom. no structual changes; replace both window, facing rear | $4,000 |
| Dec 3, 2020 | Completed final sign-off Nov 2022 | 671 Ulloa St | remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work.Details
remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work. | $40,000 |
| Feb 11, 2020 | Completed final sign-off Sep 2020 | 3 Boynton Ct | remodel kitchen & bathroom (1 bathroom). no structural changes.Details
remodel kitchen & bathroom (1 bathroom). no structural changes. | $35,000 |
| Sep 26, 2018 | Completed final sign-off Jun 2019 | 430 Marietta Dr | interior renovation of (e) kitchen add new bathroom replace sliding door with new french door at rear, add skylights and relocate front door. add wet bar adjacent to kitchen.Details
interior renovation of (e) kitchen add new bathroom replace sliding door with new french door at rear, add skylights and relocate front door. add wet bar adjacent to kitchen. | $100,000 |
| Dec 27, 2016 | Completed final sign-off Oct 2017 | 101 Santa Marina St | interior renovation at existing 1st floor with new bedroom, study and bathroom, and enlarge existing garage door. add new doors & windowDetails
interior renovation at existing 1st floor with new bedroom, study and bathroom, and enlarge existing garage door. add new doors & window | $75,000 |
| Sep 3, 2014 | Expired or cancelled expired Feb 2025 | 540 Laidley St | new 2 story addition at rear of (e) dwelling including remodel of 2 bathrooms & 1 additional bathroom @ lower floor. kitchen remodel @ addition on main floor.Details
new 2 story addition at rear of (e) dwelling including remodel of 2 bathrooms & 1 additional bathroom @ lower floor. kitchen remodel @ addition on main floor. | $200,000 |
| Aug 13, 2014 | Completed final sign-off Jun 2015 | 573 Banks St | front building- add 2 new dormers 64 sq ft. each. remodel existing bathroom in lower floor. add new bathroom in top floor. all work in front building.Details
front building- add 2 new dormers 64 sq ft. each. remodel existing bathroom in lower floor. add new bathroom in top floor. all work in front building. | $75,000 |
| Sep 23, 2013 | Completed final sign-off Jan 2014 | 431 18th Av | remodel 2 kitchens, 2 laundry/pantries, 1 bathroom. replace rear windows, not visible from the street. add 60 ft of plywood to basement walls. max glazing u factor not exceeding 0.40Details
remodel 2 kitchens, 2 laundry/pantries, 1 bathroom. replace rear windows, not visible from the street. add 60 ft of plywood to basement walls. max glazing u factor not exceeding 0.40 | $70,000 |
| Jul 3, 2013 | Completed final sign-off Nov 2013 | 207 Nevada St | interior renovation. add 180 sq ft to extg bedroom and add half bath at ground floor. no other work.Details
interior renovation. add 180 sq ft to extg bedroom and add half bath at ground floor. no other work. | $25,000 |
| Jun 28, 2012 | Completed final sign-off Sep 2013 | 2435 47th Av | add 300 sq feet to rear of existing dwelling for a bedroom & bathroom. no other work.Details
add 300 sq feet to rear of existing dwelling for a bedroom & bathroom. no other work. | $60,000 |
| Apr 6, 2012 | Completed final sign-off Nov 2012 | 280 Gellert Dr | kitchen and bathrom remodel (kit: 10'x15). no structural changes. bath: 8'x14') lighting must comply with cec 150(k)Details
kitchen and bathrom remodel (kit: 10'x15). no structural changes. bath: 8'x14') lighting must comply with cec 150(k) | $24,000 |
| Jan 9, 2012 | Completed final sign-off Apr 2012 | 566 11th Av | kitchen and bathroom remodel. no structural changes. lighting needs to comply with cec 150(k) 8for kitchen & cec 150(k) 10 for bathroomDetails
kitchen and bathroom remodel. no structural changes. lighting needs to comply with cec 150(k) 8for kitchen & cec 150(k) 10 for bathroom | $24,000 |
| Dec 30, 2010 | Completed final sign-off Oct 2011 | 1472 06th Av | add stairs from family room to dining room. straighten wall at bay window at rear of dwelling & replace (e) windows at rear. no other work. removing (e) kitchen & legalize (e) habitable space (family room & bathroom) @ ground floor.Details
add stairs from family room to dining room. straighten wall at bay window at rear of dwelling & replace (e) windows at rear. no other work. removing (e) kitchen & legalize (e) habitable space (family room & bathroom) @ ground floor. | $30,000 |
| Jul 27, 2009 | Completed final sign-off Jul 2016 | 148 06th Av | bathroom remodel: revision to application #2009/0312/4031. adding (1) bathroom, relocating two baths.Details
bathroom remodel: revision to application #2009/0312/4031. adding (1) bathroom, relocating two baths. | $60,000 |
| Mar 12, 2009 | Completed final sign-off Dec 2010 | 148 06th Av | replace rear siding and 3 patio doors from single pane to dual, in some locations. repair roofing above dining rm, 12 x 12 not visible from the street. remodel 3 baths, fixtures and tile. no structural. ufactor 0.67 maxDetails
replace rear siding and 3 patio doors from single pane to dual, in some locations. repair roofing above dining rm, 12 x 12 not visible from the street. remodel 3 baths, fixtures and tile. no structural. ufactor 0.67 max | $30,000 |
| May 14, 2007 | Completed final sign-off Feb 2008 | 2819 Buchanan St | kitchen & 1/2 bath renovation, cosmetic, elect and plumbing. bathroom fluorescent lighting or controlled by motion sensor.Details
kitchen & 1/2 bath renovation, cosmetic, elect and plumbing. bathroom fluorescent lighting or controlled by motion sensor. | $37,000 |
| Feb 13, 2004 | Completed final sign-off Feb 2005 | 135 Charles St | remodel existing units, replace e kitchens and baths, replace e fndtn, e windows, add windows. newDetails
remodel existing units, replace e kitchens and baths, replace e fndtn, e windows, add windows. new | $175,000 |
| Jan 15, 2004 | Completed final sign-off Feb 2005 | 135 Charles St | remodel kitchen & bathroom, no structural work (rear building)Details
remodel kitchen & bathroom, no structural work (rear building) | $30,000 |
| Jun 21, 2002 | Completed final sign-off Jun 2003 | 870 31st Av | remodel back of basement to add room & 1/2 bathDetails
remodel back of basement to add room & 1/2 bath | $30,000 |
| Dec 4, 2000 | Expired or cancelled expired Dec 2002 | 1750 Taylor St | non-structural remodel, kitchen,bath, bedrooms, study and new floorsDetails
non-structural remodel, kitchen,bath, bedrooms, study and new floors | $200,000 |
| Nov 1, 2000 | Expired or cancelled expired May 2001 | 2574 Union St | remodel (2) bathroomsDetails
remodel (2) bathrooms | $25,000 |
| Mar 17, 2000 | Completed final sign-off Aug 2000 | 631 Greenwich St | remodel kitchen & bath,new cabients,counters,fixture,update lighting & outletsDetails
remodel kitchen & bath,new cabients,counters,fixture,update lighting & outlets |