Back to bathroom remodel contractors
Richard Anderson Elliott Construction
- Based in
- Berkeley
- On San Francisco permits
- Dec 2025 to Feb 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 3 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Feb 2026 | 77 Crestmont Dr | interior alteration: remodel 2 existing bathrooms like for like, tile, waterproofing, finishes, and fixtures. extend shower by reconfiguring existing broom closet area (non structural) patch paint at effected areas; seperate plumbing and electrical permit as required.Details
interior alteration: remodel 2 existing bathrooms like for like, tile, waterproofing, finishes, and fixtures. extend shower by reconfiguring existing broom closet area (non structural) patch paint at effected areas; seperate plumbing and electrical permit as required. | $36,765 |