Back to bathroom remodel contractors
Rhino Builders Inc
- Based in
- Lafayette
- On San Francisco permits
- Jun 2015 to Dec 2024
- Last 24 months
- 2 permits filed
94 permits since 2000: 52 completed, 3 in progress, 33 never finaled, 6 expired or cancelled.
Of the 33 never-finaled permits, 4 are 3 to 5 years old, 19 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 12 completed, 8 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2023 | Completed final sign-off May 2025 | 3525 Cabrillo St | 1/f interior reconfigure (e)stair, convert 758 sq. ft garage space to living space, install new bedrooms, new bathroom, new laundry, seismic upgrade @1/fDetails
1/f interior reconfigure (e)stair, convert 758 sq. ft garage space to living space, install new bedrooms, new bathroom, new laundry, seismic upgrade @1/f | $87,000 |
| May 2, 2023 | Completed final sign-off Sep 2025 | 1099 23rd St | for unit 12; bathroom remodeling in kind. add 4 recessed lights. no structural or no wall changesDetails
for unit 12; bathroom remodeling in kind. add 4 recessed lights. no structural or no wall changes | $28,000 |
| Dec 16, 2022 | Completed final sign-off Mar 2024 | 1347 33rd Av | 1st fl garage conversion - part of the garage will be changed to a living space, install new master bedroom downstairs, relocate office space, new bathroom downstairs, new bathroom downstairsDetails
1st fl garage conversion - part of the garage will be changed to a living space, install new master bedroom downstairs, relocate office space, new bathroom downstairs, new bathroom downstairs | $60,000 |
| Oct 11, 2022 | Never finaled issued Nov 2022, no final | 2151 Funston Av | legalization of office @ 2nd fl; legalization of family rm & bath @ basement; dry rot repair of rear wall @ basement & 1st floor 100%; strengthening basement floor with (n) girder & foundation; temporary shoring of beadsmen & 1st fl to replace rear wallDetails
legalization of office @ 2nd fl; legalization of family rm & bath @ basement; dry rot repair of rear wall @ basement & 1st floor 100%; strengthening basement floor with (n) girder & foundation; temporary shoring of beadsmen & 1st fl to replace rear wall | $60,000 |
| Nov 28, 2018 | Completed final sign-off Feb 2019 | 1719 10th Av | bathroom remodeling upgrade plumbing, electric & windows. 35 st. same to same. 1st flDetails
bathroom remodeling upgrade plumbing, electric & windows. 35 st. same to same. 1st fl | $18,218 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 100 Molimo Dr | bathroom remodeling. replace toilet, vanity, mirror, shower, install new tile. no change of (e) floor plan.Details
bathroom remodeling. replace toilet, vanity, mirror, shower, install new tile. no change of (e) floor plan. | $19,980 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 1031 Treat Av | bathroom remodelDetails
bathroom remodel | $3,000 |
| Feb 21, 2018 | Completed final sign-off Jun 2019 | 1118 Geneva Av | replace tile on bathroom walls and floor walls will be tiled 5 ft high, 3 walls only. replace the vanity and sink. replace ceiling sheetrock. no wall alterationDetails
replace tile on bathroom walls and floor walls will be tiled 5 ft high, 3 walls only. replace the vanity and sink. replace ceiling sheetrock. no wall alteration | $750 |
| Feb 7, 2018 | Completed final sign-off Apr 2018 | 354 Holyoke St | (1) bathroom remodel, upgrading plumbing and electrical, all layout stays the same. one recessed light added above shower pan, replacing tub to shower pan.Details
(1) bathroom remodel, upgrading plumbing and electrical, all layout stays the same. one recessed light added above shower pan, replacing tub to shower pan. | $20,000 |
| Jul 14, 2017 | Completed final sign-off Sep 2018 | 557 Wildwood Wy | 2 story residential building. alteration interior work rooms down. 1st floor: office, family rm, full bath. 2nd floor: skylight, new stairs to 2nd floor (interior).Details
2 story residential building. alteration interior work rooms down. 1st floor: office, family rm, full bath. 2nd floor: skylight, new stairs to 2nd floor (interior). | $120,000 |
| Jul 14, 2017 | Expired or cancelled withdrawn Feb 2018 | 86 Homestead St | remove walls and stairs. place new footing, new posts and beam. electrical works. legalize ground floor full bath/storage room.Details
remove walls and stairs. place new footing, new posts and beam. electrical works. legalize ground floor full bath/storage room. | $20,000 |
| May 5, 2017 | Completed final sign-off Sep 2017 | 2236 Cayuga Av | bathroom remodel: changing lighting and plumbingDetails
bathroom remodel: changing lighting and plumbing | $18,000 |
| Jan 25, 2017 | Completed final sign-off Nov 2017 | 944 Minnesota St | install bathrooms (2) in 944 & 946 minnesota street in rooms presently used for storageDetails
install bathrooms (2) in 944 & 946 minnesota street in rooms presently used for storage | $32,000 |
| Jan 20, 2017 | Never finaled filed Jan 2017, never issued | 335 Chester Av | 2 story building addition. total 5 bedrooms & 4 bathrooms, 2 living rooms, deck, garage, 1 kitchen.Details
2 story building addition. total 5 bedrooms & 4 bathrooms, 2 living rooms, deck, garage, 1 kitchen. | $170,000 |
| Sep 2, 2016 | Never finaled issued Sep 2016, no final | 116 Majestic Av | replacing wall insulation in the garage (r-19 and walls to between habitable space, replacing a toilet in-kind in bathroom.n upper level. installing 18 lights in the garage with high efficacy and vacancy sensor. rev. to permit #201608195566.Details
replacing wall insulation in the garage (r-19 and walls to between habitable space, replacing a toilet in-kind in bathroom.n upper level. installing 18 lights in the garage with high efficacy and vacancy sensor. rev. to permit #201608195566. | $3,900 |
| Aug 29, 2016 | Never finaled issued Aug 2016, no final | 2579 41st Av | bathroom remodel/replacing toilet, shower & floor tiles all in kind. upgrade electrical as needed. no change on wall.Details
bathroom remodel/replacing toilet, shower & floor tiles all in kind. upgrade electrical as needed. no change on wall. | $10,000 |
| Jul 19, 2016 | Expired or cancelled cancelled Apr 2020 | 4324 20th St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $138,718 |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 240 Duncan St | bathroom remodel in-kind on lower level. replacing tub sink, toilet, tiles, floor, upgrade to gfi. lighting shall be h.e. or controlled by manual on sensor with h.e. main light.Details
bathroom remodel in-kind on lower level. replacing tub sink, toilet, tiles, floor, upgrade to gfi. lighting shall be h.e. or controlled by manual on sensor with h.e. main light. | $13,000 |
| Feb 8, 2016 | Completed final sign-off Mar 2016 | 1378 38th Av | bathroom remodel: replacew shower head, shower pan, toilet and floors.Details
bathroom remodel: replacew shower head, shower pan, toilet and floors. | $7,000 |
| Sep 21, 2015 | Completed final sign-off Aug 2016 | 1327 California St | kitchen & bathroom remodel. move washer & dryer to ground floor. n/a for maher.Details
kitchen & bathroom remodel. move washer & dryer to ground floor. n/a for maher. | $10,000 |
| Sep 9, 2015 | Never finaled issued Sep 2015, no final | 744 Faxon Av | 1 bathroom remodel - tile replacement on walls, tub replacement, sink replacement, toilet replacementDetails
1 bathroom remodel - tile replacement on walls, tub replacement, sink replacement, toilet replacement | $7,500 |
| Jun 15, 2015 | Completed final sign-off Jul 2015 | 2620 Sutter St | unit 2620:one full bathroom remodeling, plumbing, electrical, tile. one bathroom remodel. just install toilet, sink, shower faucet. (no re-tile). kitchen remodeling - install cabinets, counter tops, sink, faucet, install light switch in hallway. 2620a: tow full bathroom remodel. electrical,Details
unit 2620:one full bathroom remodeling, plumbing, electrical, tile. one bathroom remodel. just install toilet, sink, shower faucet. (no re-tile). kitchen remodeling - install cabinets, counter tops, sink, faucet, install light switch in hallway. 2620a: tow full bathroom remodel. electrical, | $68,000 |