Back to bathroom remodel contractors
Renovation Realty Northern California
- Based in
- Emeryville
- On San Francisco permits
- Apr 2015 to Mar 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2016 | Completed final sign-off Mar 2017 | 524 Gates St | remove & replace an existing kitchen and bathroom fixtures on 2nd and 3rd floor, install recessed can light at 2/f kitchen, replace windows and door, same size and same location.Details
remove & replace an existing kitchen and bathroom fixtures on 2nd and 3rd floor, install recessed can light at 2/f kitchen, replace windows and door, same size and same location. | $18,000 |
| May 12, 2015 | Completed final sign-off Jul 2015 | 250 De Long St | top fl, kitchen and bath remodel. no change in wall and opening layout. new cabinets,sink countertop, recessed lighting,tub, vainty tile. high eff 1 light bath, others man, high eff, or sensor. kitch min 50% high effDetails
top fl, kitchen and bath remodel. no change in wall and opening layout. new cabinets,sink countertop, recessed lighting,tub, vainty tile. high eff 1 light bath, others man, high eff, or sensor. kitch min 50% high eff | $30,000 |
| Apr 1, 2015 | Completed final sign-off Jun 2015 | 640 Clarendon Av | comply with #201532441 - remodel 2-1/2 bathrooms: new toilets, bathtub, shower surrouding, tile, vanities, plumbing fixtures, electrical.Details
comply with #201532441 - remodel 2-1/2 bathrooms: new toilets, bathtub, shower surrouding, tile, vanities, plumbing fixtures, electrical. | $23,000 |