Renova Builders
- Based in
- Orinda
- On San Francisco permits
- Apr 2021 to Jun 2026
- Last 24 months
- 1 permit filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 never finaled, 1 expired or cancelled. Typically 280 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2024 | Expired or cancelled expired Jul 2026 | 15 Bishop St | to enlarge (e) upper deck @ the same height, to replace (e) lower deck of same size with stair reconfiguration. to install new hot tub outside.Details
to enlarge (e) upper deck @ the same height, to replace (e) lower deck of same size with stair reconfiguration. to install new hot tub outside. | $85,000 |
| Apr 27, 2021 | Never finaled issued Jun 2022, no final | 95 Anzavista Av | to build two new decks. to legalize existing railing on two existing balconies. to build a fire wall next to the property line along the new stairsDetails
to build two new decks. to legalize existing railing on two existing balconies. to build a fire wall next to the property line along the new stairs | $25,000 |