Renaissance Renovations
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to May 2006
- Last 24 months
- 0 permits filed
27 permits since 2000: 21 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2006 | Completed final sign-off Apr 2006 | 85 Turquoise Wy | replace siding glass doors to deck with new. in kin, no change to opening sizes. rpair termite damage around doors and deck . less than 50% repair of deck. replace existing only. no new openingDetails
replace siding glass doors to deck with new. in kin, no change to opening sizes. rpair termite damage around doors and deck . less than 50% repair of deck. replace existing only. no new opening | $5,000 |
| Aug 8, 2002 | Completed final sign-off Oct 2002 | 2666 Hyde St | remove rotted deck&replace with new.replace framing below as required & 2 footings.Details
remove rotted deck&replace with new.replace framing below as required & 2 footings. | $17,040 |