Back to bathroom remodel contractors
Remy's Quality Construction Inc.
- Based in
- San Mateo
- On San Francisco permits
- Dec 2001 to Jul 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 22 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2025 | In progress issued Jul 2025 | 1000 North Point St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $40,000 |
| Aug 2, 2019 | Completed final sign-off Dec 2019 | 80 Lomita Av | bath remodel, remove and replace fixtures in same location. replace flooring and tub tile surround. replace electrical fixturesDetails
bath remodel, remove and replace fixtures in same location. replace flooring and tub tile surround. replace electrical fixtures | $14,000 |
| Nov 27, 2013 | Completed final sign-off May 2019 | 220 Gates St | conversion into (e) lower floor living area to become living room, utility and bath, enlarge main floor to create nook area, add upper floor area to include bath and enlarge bedroom 2 and the closet add upper floor rear deckDetails
conversion into (e) lower floor living area to become living room, utility and bath, enlarge main floor to create nook area, add upper floor area to include bath and enlarge bedroom 2 and the closet add upper floor rear deck | $178,000 |
| Feb 11, 2008 | Completed final sign-off Jul 2008 | 27 San Benito Wy | bathroom remodeling, extend bathroom into current closet & construct similar size closet in bedroom.Details
bathroom remodeling, extend bathroom into current closet & construct similar size closet in bedroom. | $18,000 |
| Sep 11, 2007 | Completed final sign-off Jan 2008 | 2455 30th Av | increase bathroom by 1' into lightwell & remodel bathroom in upper floor. letter of approval from neighbor included.Details
increase bathroom by 1' into lightwell & remodel bathroom in upper floor. letter of approval from neighbor included. | $11,700 |
| Apr 17, 2006 | Expired or cancelled expired Apr 2007 | 715 Monterey Bl | addition power outlets, remodeling bathroom & kitchen, replacing old water pipes with new ones. adding telephone line, alarm, replace windows (22 windows total). install insolation on (second floor dinning and bedroom.)Details
addition power outlets, remodeling bathroom & kitchen, replacing old water pipes with new ones. adding telephone line, alarm, replace windows (22 windows total). install insolation on (second floor dinning and bedroom.) | $14,900 |
| Mar 1, 2004 | Completed final sign-off Jun 2004 | 3674 Fillmore St | renew expired pa 200212123370- (kitchen & bathroom remodel)for finalDetails
renew expired pa 200212123370- (kitchen & bathroom remodel)for final | |
| Jun 11, 2003 | Completed final sign-off Apr 2004 | 276 Miramar Av | remove/replace dryrot, termite damaged joists/studs in downstairs kitchen/laundry room/bath/bedrm#2Details
remove/replace dryrot, termite damaged joists/studs in downstairs kitchen/laundry room/bath/bedrm#2 | $20,000 |
| Apr 10, 2003 | Completed final sign-off Apr 2004 | 276 Miramar Av | remodel 2 bathrooms, kitchen, replace windows, repair dryrotDetails
remodel 2 bathrooms, kitchen, replace windows, repair dryrot | $34,000 |