Reid Construction & Maintenance
- Based in
- Fairfield
- On San Francisco permits
- Jan 2018 to Jul 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 219 Cumberland St | no exterior alterations. interior remodel of kitchen: minor movement of sink, vent, upgrade circuits to code, replace cabinets, counters, floors and finishesDetails
no exterior alterations. interior remodel of kitchen: minor movement of sink, vent, upgrade circuits to code, replace cabinets, counters, floors and finishes | $26,825 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 2002 03rd St | unit 203 - construction of 2 partition walls & 2 lights, switched on existing circuits. 4 interior windows & replacement of entry floor. create office on 3rd floor. no work in common areas/all work in unit. no change to egress or fire systemDetails
unit 203 - construction of 2 partition walls & 2 lights, switched on existing circuits. 4 interior windows & replacement of entry floor. create office on 3rd floor. no work in common areas/all work in unit. no change to egress or fire system | $17,000 |