Back to bathroom remodel contractors
Regional Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Jun 2026
- Last 24 months
- 4 permits filed
65 permits since 2000: 54 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 26 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 1571 Sanchez St | bathroom remodel in kind, tub to shower, new shower pan, sink, toilet, tiles on 2/f bathroom. no moving walls, approx 35 sqft.Details
bathroom remodel in kind, tub to shower, new shower pan, sink, toilet, tiles on 2/f bathroom. no moving walls, approx 35 sqft. | $25,000 |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 2756 35th Av | convert g/f e) family rm space to new bath, relocate g/f e) laundry to g/f e) closet. replace rear windowDetails
convert g/f e) family rm space to new bath, relocate g/f e) laundry to g/f e) closet. replace rear window | $35,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2025 | 1160 Prague St | remodel (e) full bathroom, replace tub, toilet, shower pan, tile floor & walls. install new exhaust fan through roof. install 4 new recessed lights and gfci receptacle.Details
remodel (e) full bathroom, replace tub, toilet, shower pan, tile floor & walls. install new exhaust fan through roof. install 4 new recessed lights and gfci receptacle. | $18,000 |
| May 31, 2024 | Completed final sign-off Sep 2024 | 882 35th Av | remodel existing 3rd fl bathroom with new soaktub, shower, and vanity. tile floor and shower walls., new exhaust fan to outside, gfi outlet plug, new recess lights (3) plus vanity lihgts.Details
remodel existing 3rd fl bathroom with new soaktub, shower, and vanity. tile floor and shower walls., new exhaust fan to outside, gfi outlet plug, new recess lights (3) plus vanity lihgts. | $12,000 |
| Aug 20, 2021 | Completed final sign-off May 2022 | 1627 46th Av | remodel (e) kitchen: replace cabinets, counter, lights, stove, g/d, d/w, floor tile, upgrade plugs.remodel (e) bathroom: new shower,t ilet, sink, new fixtures, new tile ad recessed lights.Details
remodel (e) kitchen: replace cabinets, counter, lights, stove, g/d, d/w, floor tile, upgrade plugs.remodel (e) bathroom: new shower,t ilet, sink, new fixtures, new tile ad recessed lights. | $35,000 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 2345 Laguna St | remodel (e) kitchen: install new cabinets, outlets, recess lights, hood, sink and new countertop, d/w & g/d. remodel (e) full & half-bath with new tub, shower, sink, and tile, olus, new faucets. remodel in-kind.Details
remodel (e) kitchen: install new cabinets, outlets, recess lights, hood, sink and new countertop, d/w & g/d. remodel (e) full & half-bath with new tub, shower, sink, and tile, olus, new faucets. remodel in-kind. | $55,000 |
| Oct 2, 2020 | Completed final sign-off Mar 2021 | 1672 Bay St | remodel (e) kitchen, install new kitchen cabinets, counter, stove, garbage disposal, dish washer, sink, faucent, recess light & plugs. remodel (e) bathroom, install shower pan, tub, toilet, tile, exhaust fan, lights, new faucentsDetails
remodel (e) kitchen, install new kitchen cabinets, counter, stove, garbage disposal, dish washer, sink, faucent, recess light & plugs. remodel (e) bathroom, install shower pan, tub, toilet, tile, exhaust fan, lights, new faucents | $25,000 |
| Dec 24, 2018 | Completed final sign-off Jun 2019 | 245 Bemis St | remodel (e) kitchen & bathroom, convert (e) storage to new bathDetails
remodel (e) kitchen & bathroom, convert (e) storage to new bath | $40,000 |
| Jul 31, 2018 | Completed final sign-off Dec 2018 | 1691 20th Av | remodel (e) kitchen & bathroom. bath: replace shower fixture, pan, toilet, tub, sink, tile and exhaust fan. kitchen: replace kitchen cabinets, sink, garbage disposal, counter top & appliances.Details
remodel (e) kitchen & bathroom. bath: replace shower fixture, pan, toilet, tub, sink, tile and exhaust fan. kitchen: replace kitchen cabinets, sink, garbage disposal, counter top & appliances. | $15,000 |
| Aug 28, 2017 | Completed final sign-off Dec 2017 | 60 Hazelwood Av | remodel (e) bathroom, install new shower, toilet, sink, tile floor, wall. same location, no walls/doors or windows moved/relocated.Details
remodel (e) bathroom, install new shower, toilet, sink, tile floor, wall. same location, no walls/doors or windows moved/relocated. | $8,500 |
| Dec 1, 2015 | Completed final sign-off Feb 2016 | 1693 20th Av | remodel existing ktichen & bathrom - kitchen: upgrade electrical works, new cabinets, apliances, sink, dishwasher, stove, garbage disposal. bathroom: new tile work, tub, sink, & new shower.Details
remodel existing ktichen & bathrom - kitchen: upgrade electrical works, new cabinets, apliances, sink, dishwasher, stove, garbage disposal. bathroom: new tile work, tub, sink, & new shower. | $20,000 |
| Jul 7, 2014 | Completed final sign-off Dec 2014 | 1890 31st Av | remodel (e) bath & kitchen on upper level, no change in wall & opening, layout: install new tile, shower pan, tub, toilet & sink, install new kitchen cabinets, granite top, all appliance & upgrade elec works. bathrm lighting high efficacy or controlled by manual on sensor,kit 50% lighting wattageDetails
remodel (e) bath & kitchen on upper level, no change in wall & opening, layout: install new tile, shower pan, tub, toilet & sink, install new kitchen cabinets, granite top, all appliance & upgrade elec works. bathrm lighting high efficacy or controlled by manual on sensor,kit 50% lighting wattage | $15,000 |
| Jul 19, 2013 | Completed final sign-off Dec 2013 | 136 Westwood Dr | alteration to convert existing study to new master bath.Details
alteration to convert existing study to new master bath. | $10,000 |
| Aug 20, 2012 | Completed final sign-off Mar 2013 | 690 Miramar Av | gr floor remodel. add new 2 bedroom, office, 2 bathrooms at garage level, build new staircase from second level to groundlevel. remove all (e) lath & plaster in 2nd floor and install new lighting & outlets.Details
gr floor remodel. add new 2 bedroom, office, 2 bathrooms at garage level, build new staircase from second level to groundlevel. remove all (e) lath & plaster in 2nd floor and install new lighting & outlets. | $60,000 |
| Jun 11, 2012 | Never finaled issued Jun 2012, no final | 690 Miramar Av | remodel bathroom&kitchen on 2/fl. install new tub,toilet,vanity&shower stall &new tiles w/ new plumbing fixtures in exist bathroom. replace new counter tops, dishwasher, stove&sink in exist kitchen w/ tile flooring.installnew garage door w/ opener.Details
remodel bathroom&kitchen on 2/fl. install new tub,toilet,vanity&shower stall &new tiles w/ new plumbing fixtures in exist bathroom. replace new counter tops, dishwasher, stove&sink in exist kitchen w/ tile flooring.installnew garage door w/ opener. | $15,000 |
| Nov 1, 2011 | Completed final sign-off Jul 2012 | 1347 Jackson St | unit #404-remodel apt w/energy upgrades includes repl kitchen cabinets, convert shower th 2nd bathroom, repl plumbing fixtures w/low water usage unbits. add batt insulation to ceiling, exterior walls, common walls. repl windows w/dual glazed, repl heating system w/h.e gas unit. repl lightingDetails
unit #404-remodel apt w/energy upgrades includes repl kitchen cabinets, convert shower th 2nd bathroom, repl plumbing fixtures w/low water usage unbits. add batt insulation to ceiling, exterior walls, common walls. repl windows w/dual glazed, repl heating system w/h.e gas unit. repl lighting | $38,000 |
| May 6, 2011 | Completed final sign-off Apr 2012 | 2500 47th Av | add new bath and bedroom at garage level. relocate laundry and central furnaceDetails
add new bath and bedroom at garage level. relocate laundry and central furnace | $15,000 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 1167 Guerrero St | alter basement storage space to home office/den. add bathroom, replace concrete floor w/same, replace wood ladder stair w/new spiral stair and landingDetails
alter basement storage space to home office/den. add bathroom, replace concrete floor w/same, replace wood ladder stair w/new spiral stair and landing | $35,000 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 218 29th St | revision to permit #200905128255 & 200907031958. revise m. bath layout, relocate laundry, provide maintenance access stair to roof deck, add railing to (e) rear stair.Details
revision to permit #200905128255 & 200907031958. revise m. bath layout, relocate laundry, provide maintenance access stair to roof deck, add railing to (e) rear stair. | $3,000 |
| May 12, 2009 | Completed final sign-off Jul 2010 | 218 29th St | master suite in garage/ground floor. retrofit heating to radiant heat floors. full bath & laundry & circular staircase to connect second floor with ground floor.Details
master suite in garage/ground floor. retrofit heating to radiant heat floors. full bath & laundry & circular staircase to connect second floor with ground floor. | $50,000 |
| Nov 13, 2007 | Completed final sign-off May 2008 | 34 Caine Av | stair replacement, (dry rot termites) to conforming stairway. add bathroom to ground floor, laundry room. remodel kitchen w/ new cabinets lighting & flooring, on 2nd floor.Details
stair replacement, (dry rot termites) to conforming stairway. add bathroom to ground floor, laundry room. remodel kitchen w/ new cabinets lighting & flooring, on 2nd floor. | $25,000 |
| Jul 31, 2006 | Expired or cancelled expired Jul 2007 | 640 Teresita Bl | remodel (e) top floor bathroom. install new tub sink, toilet, tile and faucets flourescent lighting.Details
remodel (e) top floor bathroom. install new tub sink, toilet, tile and faucets flourescent lighting. | $7,000 |
| Jun 5, 2006 | Completed final sign-off Aug 2006 | 1859 29th Av | remodel (e) top bathroom, replace tub, sink, toilet and install new tiles for walls and floor. no structural work.Details
remodel (e) top bathroom, replace tub, sink, toilet and install new tiles for walls and floor. no structural work. | $7,000 |
| May 31, 2006 | Completed final sign-off Jun 2006 | 731 Cayuga Av | revise plan for ground level remodel at ground level, relocate bathroom to 2nd bedroom. enlarge 1st bedroom. rev. to pa#2004/08/09/1039Details
revise plan for ground level remodel at ground level, relocate bathroom to 2nd bedroom. enlarge 1st bedroom. rev. to pa#2004/08/09/1039 | |
| Jun 27, 2005 | Expired or cancelled expired Mar 2008 | 763 38th Av | remodel (e) kitchen and bath, replace cabinets, counters, florings, recess lighting, faucetsDetails
remodel (e) kitchen and bath, replace cabinets, counters, florings, recess lighting, faucets | $25,000 |
| May 17, 2004 | Completed final sign-off Jul 2004 | 1867 29th Av | remodel (e) bath-replace tub, plumbing fixtures, sink toilet, tile and install new lighting. (no strDetails
remodel (e) bath-replace tub, plumbing fixtures, sink toilet, tile and install new lighting. (no str | $6,500 |
| Mar 19, 2003 | Expired or cancelled expired Nov 2006 | 688 South Van Ness Av | remodel existing bath & kitchen.bath area replace tub,faucet,sink,toilet & install new outlets &Details
remodel existing bath & kitchen.bath area replace tub,faucet,sink,toilet & install new outlets & | $12,000 |
| Jan 2, 2003 | Completed final sign-off Mar 2003 | 201 Eureka St | remodel existing kitchen & bath: kitchen, replace all cabinets. install recessio lighting, outlets,Details
remodel existing kitchen & bath: kitchen, replace all cabinets. install recessio lighting, outlets, | $12,000 |
| Aug 30, 2001 | Completed final sign-off Oct 2001 | 3997 17th St | remodel kitchen and bath repair water pipes dry rot near bathtubDetails
remodel kitchen and bath repair water pipes dry rot near bathtub | $15,000 |
| Jan 22, 2001 | Completed final sign-off Apr 2001 | 2039 15th Av | remodel bath install new tile, tub, faucet, toilet & sink. no structural work.Details
remodel bath install new tile, tub, faucet, toilet & sink. no structural work. | $5,000 |