Back to bathroom remodel contractors
Regency General Contractors Inc
- Based in
- Fremont
- On San Francisco permits
- Aug 2006 to Sep 2026
- Last 24 months
- 177 permits filed
1,076 permits since 2000: 914 completed, 53 in progress, 93 never finaled, 16 expired or cancelled.
Of the 93 never-finaled permits, 7 are 3 to 5 years old, 79 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
870 bathroom remodel permits: 764 completed, 8 in progress, 88 never finaled, 10 expired or cancelled. Typically 0 days from filing to permit and 48 days from permit to final inspection.
Showing the 100 most recent of 870.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2025 | In progress issued Aug 2025 | 5 Commer Ct | unit 2: exterior and interior repairs in units, bathroom and kitchen remodel. exterior repairs to fire escape for unit (less than 50%).Details
unit 2: exterior and interior repairs in units, bathroom and kitchen remodel. exterior repairs to fire escape for unit (less than 50%). | $50,000 |
| May 29, 2025 | Completed final sign-off Jul 2026 | 32 Navy Rd | revision pa# 202502120206: reconfigure bathroom layout.Details
revision pa# 202502120206: reconfigure bathroom layout. | |
| May 29, 2025 | Completed final sign-off Jul 2026 | 76 Navy Rd | revision to pa# 202502120212: reconfigure bathroom layout.Details
revision to pa# 202502120212: reconfigure bathroom layout. | |
| May 29, 2025 | Completed final sign-off Aug 2026 | 1172 Oakdale Av | revision to pa 202502210793 reconfigure bathroom layout. no change to fixture countDetails
revision to pa 202502210793 reconfigure bathroom layout. no change to fixture count | |
| May 29, 2025 | In progress issued Jun 2025 | 1140 Oakdale Av | revision to pa 202502210792 reconfigure bathroom layout. no change to fixture countDetails
revision to pa 202502210792 reconfigure bathroom layout. no change to fixture count | |
| May 29, 2025 | In progress issued Jun 2025 | 1112 Oakdale Av | revision to pa 202502210791 reconfigure bathroom layout. no change to fixture countDetails
revision to pa 202502210791 reconfigure bathroom layout. no change to fixture count | |
| May 29, 2025 | Completed final sign-off Jul 2026 | 1054 Oakdale Av | revision to pa 202502210784 reconfigure bathroom layout. no change to fixture countDetails
revision to pa 202502210784 reconfigure bathroom layout. no change to fixture count | |
| May 29, 2025 | Completed final sign-off Jul 2026 | 12 Navy Rd | revision to pa# 202502120203: reconfigure bathroom layout.Details
revision to pa# 202502120203: reconfigure bathroom layout. | |
| May 29, 2025 | Completed final sign-off Jul 2026 | 1086 Oakdale Av | revision to pa 202502210780 reconfigure bathroom layout. no change to fixture countDetails
revision to pa 202502210780 reconfigure bathroom layout. no change to fixture count | |
| Feb 12, 2025 | Completed final sign-off Dec 2025 | 63 Navy Rd | unit 63 & 65 - interior & exterior remodel, in-kind throughout (2 bath, 2 kitchen), exterior repairs to landings, deck & balconies; 6 baldwin includes renovation to common bulding to include laundry area. community room and restrooms (for ada)Details
unit 63 & 65 - interior & exterior remodel, in-kind throughout (2 bath, 2 kitchen), exterior repairs to landings, deck & balconies; 6 baldwin includes renovation to common bulding to include laundry area. community room and restrooms (for ada) | $325,000 |
| Feb 6, 2025 | In progress filed Feb 2025, not yet issued | 1247 Ingalls St | kitchen & bathroom remodel in kind. 2 kitchen and 2 bathroomsDetails
kitchen & bathroom remodel in kind. 2 kitchen and 2 bathrooms | $125,000 |
| Jan 10, 2025 | Completed final sign-off Nov 2025 | 1245 Ingalls St | three interior units remodel: including 1 kitchen & 1 bath, and floor finishes throughout in each unit. no new wall and no existing wall relocation. no changes in plumbing fixture counts. new lighting shall comply with cec 150.0(k)3 and (k)5. no change to use, occuypancy, sqft and wall layout.Details
three interior units remodel: including 1 kitchen & 1 bath, and floor finishes throughout in each unit. no new wall and no existing wall relocation. no changes in plumbing fixture counts. new lighting shall comply with cec 150.0(k)3 and (k)5. no change to use, occuypancy, sqft and wall layout. | $195,000 |
| Jan 9, 2025 | Completed final sign-off Jun 2025 | 17 Matthew Ct | 17-25 matthew ct (total 5 units:17,19,21,23,25- 1 kitchen & 1.5 bath at each unit) interior renovation. kitchen & bathroom finishes thru out. no change to use/occupacny/wall layoutsDetails
17-25 matthew ct (total 5 units:17,19,21,23,25- 1 kitchen & 1.5 bath at each unit) interior renovation. kitchen & bathroom finishes thru out. no change to use/occupacny/wall layouts | $325,000 |
| Jan 9, 2025 | Completed final sign-off Nov 2025 | 1176 Oakdale Av | 1172-1176 oakdale (total 2 units, 1 kitchen & 1 bath at each unit) interior renovation. new kitchen cabinets, countertios, applicances, fixtures. replace bathroom fixtures, exhaust fan, radioation damper, p-trap, tub/shower & valves. no change to use/occupacny/wall layoutsDetails
1172-1176 oakdale (total 2 units, 1 kitchen & 1 bath at each unit) interior renovation. new kitchen cabinets, countertios, applicances, fixtures. replace bathroom fixtures, exhaust fan, radioation damper, p-trap, tub/shower & valves. no change to use/occupacny/wall layouts | $192,000 |
| Jan 9, 2025 | Completed final sign-off Jun 2025 | 6 Matthew Ct | units # 6,10,14,18,& 22 matthew court: interior unit remodel to include kitchen & bath, and finishes throughout. no change to use, occupancy, sqft or wall layout.Details
units # 6,10,14,18,& 22 matthew court: interior unit remodel to include kitchen & bath, and finishes throughout. no change to use, occupancy, sqft or wall layout. | $325,000 |
| Jan 9, 2025 | Completed final sign-off Nov 2025 | 1108 Oakdale Av | interior unit renovation to include nw kitchen cabinets, countertops, applnc, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower. p trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall locat.Details
interior unit renovation to include nw kitchen cabinets, countertops, applnc, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower. p trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall locat. | $192,000 |
| Jan 9, 2025 | Completed final sign-off Nov 2025 | 1148 Oakdale Av | interior unit renovation to include nw kitchen cabinets, countertops, applnc, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower. p trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall locat.Details
interior unit renovation to include nw kitchen cabinets, countertops, applnc, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower. p trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall locat. | $100,000 |
| Jan 9, 2025 | Completed final sign-off Jun 2025 | 5 Matthew Ct | units # 5,7,9,11,& 15 matthew court: interior unit remodel to include kitchen & bath, and finishes throughout. no change to use, occupancy, sqft or wall layout. non structural work.Details
units # 5,7,9,11,& 15 matthew court: interior unit remodel to include kitchen & bath, and finishes throughout. no change to use, occupancy, sqft or wall layout. non structural work. | $325,000 |
| Sep 13, 2024 | Completed final sign-off Oct 2024 | 31 Beatrice Ln | unit 3: interior upgrade to include kitchen remodel in kind- new kitchen cabinets/ countertops, appliances, and fixtures. bathroom remodel in kind - replace bathroom fixtures, exhaust fan, radiation damper. tub/ shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors/Details
unit 3: interior upgrade to include kitchen remodel in kind- new kitchen cabinets/ countertops, appliances, and fixtures. bathroom remodel in kind - replace bathroom fixtures, exhaust fan, radiation damper. tub/ shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors/ | |
| Sep 13, 2024 | Completed final sign-off Oct 2024 | 31 Beatrice Ln | unit 4: interior upgrade to include kitchen remodel in kind-new kitchen cabinets/ countertops, appliances, and fixtures. bathroom remodel in kind-replace bathroom fixtures, exhaust fan, radiation damper. tub/ shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors/hardwDetails
unit 4: interior upgrade to include kitchen remodel in kind-new kitchen cabinets/ countertops, appliances, and fixtures. bathroom remodel in kind-replace bathroom fixtures, exhaust fan, radiation damper. tub/ shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors/hardw | |
| Aug 6, 2024 | Completed final sign-off Aug 2024 | 3 Bayside Village Pl | bldg 8 unit #322: like for like; remove and replace; (1) kitchen cabinets, countertops, sink, faucet; (2) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls.Details
bldg 8 unit #322: like for like; remove and replace; (1) kitchen cabinets, countertops, sink, faucet; (2) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls. | $85,000 |
| Aug 6, 2024 | Completed final sign-off Aug 2024 | 501 Delancey St | bldg 9 unit #206: like for like; remove and replace; (1) kitchen cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls.Details
bldg 9 unit #206: like for like; remove and replace; (1) kitchen cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls. | $60,000 |
| Jul 17, 2024 | Completed final sign-off Apr 2025 | 1100 Oakdale Av | unit 1100 and 1104- interior remodel for kithcen cabinert/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall , as needed. replace flooring, interior doors/hardware. no change to use, occupancy sf, or wall layoutDetails
unit 1100 and 1104- interior remodel for kithcen cabinert/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall , as needed. replace flooring, interior doors/hardware. no change to use, occupancy sf, or wall layout | $128,000 |
| Jul 17, 2024 | In progress issued Jul 2024 | 45 Commer Ct | interior remodel for kithcen cabinert/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall , as needed. replace flooring, interior doors/hardware. no change to use, occupancy sf, or wall layout. all unitsDetails
interior remodel for kithcen cabinert/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall , as needed. replace flooring, interior doors/hardware. no change to use, occupancy sf, or wall layout. all units | $100,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2025 | 3 Osceola Ln | interior unit upgrades to include new kitchen cabinets/countertops,appliances&fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware.all units no change to use or occupancy or sq ft or wallDetails
interior unit upgrades to include new kitchen cabinets/countertops,appliances&fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware.all units no change to use or occupancy or sq ft or wall | $425,000 |
| Jul 16, 2024 | Completed final sign-off Jun 2026 | 2 George Ct | interior unit upgrades to include new kitchen cabinets/countertops, applicances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy/sqft/wall layouts...Details
interior unit upgrades to include new kitchen cabinets/countertops, applicances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy/sqft/wall layouts... | $475,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2025 | 65 Osceola Ln | interior unit upgrades to include new kitchen cabinets/countertops,appliances&fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware.to comply with nov 201894012,item 2 all unitsDetails
interior unit upgrades to include new kitchen cabinets/countertops,appliances&fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware.to comply with nov 201894012,item 2 all units | $425,000 |
| Jul 15, 2024 | Completed final sign-off Oct 2025 | 1455 La Salle Av | unit 118,218,318,117,217,317- interior unit upgrades to include (n) kithcen cabinets, countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan radiation damper, tub/shower, ptrap and valves, patch drywall, replace flooring, and interior doors/hardware. no change to use or occupancyDetails
unit 118,218,318,117,217,317- interior unit upgrades to include (n) kithcen cabinets, countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan radiation damper, tub/shower, ptrap and valves, patch drywall, replace flooring, and interior doors/hardware. no change to use or occupancy | $150,000 |
| Jul 15, 2024 | In progress issued Jul 2024 | 20 Whitfield Ct | interior unit upgrades to include new kitchen cabinets/countertops. appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper,tub shower. p-trap&valves. patch drywall, as needed. all units. no change to use of occupancy or sq ft or wall layouts. all unitsDetails
interior unit upgrades to include new kitchen cabinets/countertops. appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper,tub shower. p-trap&valves. patch drywall, as needed. all units. no change to use of occupancy or sq ft or wall layouts. all units | $500,000 |
| Jul 15, 2024 | Completed final sign-off Aug 2025 | 5 George Ct | unit 5,7,9,11,15,17,19-interior unit upgrades to include (n) kithcen cabinets, countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan radiation damper, tub/shower, ptrap and valves, patch drywall, replace flooring, and interior doors/hardware. no change to use or occupancyDetails
unit 5,7,9,11,15,17,19-interior unit upgrades to include (n) kithcen cabinets, countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan radiation damper, tub/shower, ptrap and valves, patch drywall, replace flooring, and interior doors/hardware. no change to use or occupancy | $175,000 |
| Jul 15, 2024 | Completed final sign-off Aug 2025 | 1 Whitfield Ct | interior unit upgrades to include new kitchen cabinets/countertops. appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper,tub shower. p-trap&valves. all units. no change to use of occupancy or sq ft or wall layouts.Details
interior unit upgrades to include new kitchen cabinets/countertops. appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper,tub shower. p-trap&valves. all units. no change to use of occupancy or sq ft or wall layouts. | $425,000 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 500 Beale St | building 5 unit# 301: like for like, remove and replace: (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications, no removing wallDetails
building 5 unit# 301: like for like, remove and replace: (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications, no removing wall | $85,000 |
| Jun 12, 2024 | Completed final sign-off Jul 2024 | 160 Brannan St | building 3 unit# 408: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modificaitons; no removing walls.Details
building 3 unit# 408: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modificaitons; no removing walls. | $60,000 |
| Jun 11, 2024 | Completed final sign-off Jul 2024 | 570 Beale St | bldg 4 unit #317: like for like; remove and replace; (1) kitchen, cabinets, counter tops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls.Details
bldg 4 unit #317: like for like; remove and replace; (1) kitchen, cabinets, counter tops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls. | $60,000 |
| Jun 11, 2024 | Completed final sign-off Jul 2024 | 570 Beale St | bldg 4 unit #231: like for like; remove and replace; (1) kitchen, cabinets, counter tops, sink, faucet; (2) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls.Details
bldg 4 unit #231: like for like; remove and replace; (1) kitchen, cabinets, counter tops, sink, faucet; (2) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls. | $85,000 |
| Jun 7, 2024 | Completed final sign-off Jul 2024 | 3 Bayside Village Pl | bldg 8 unit #419:like for like; remove and replace; (1) kitchen, cabinets, countertops, sink. faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers;no fire sprinkler/alarm modifications; no removing walls.Details
bldg 8 unit #419:like for like; remove and replace; (1) kitchen, cabinets, countertops, sink. faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers;no fire sprinkler/alarm modifications; no removing walls. | $85,000 |
| Jun 7, 2024 | Completed final sign-off Jul 2024 | 3 Bayside Village Pl | bldg 8 unit #114 :like for like; remove and replace; (1) kitchen, cabinets, countertops, sink. faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers;no fire sprinkler/alarm modifications; no removing walls.Details
bldg 8 unit #114 :like for like; remove and replace; (1) kitchen, cabinets, countertops, sink. faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers;no fire sprinkler/alarm modifications; no removing walls. | $60,000 |
| May 30, 2024 | Completed final sign-off Jul 2024 | 3 Bayside Village Pl | building 8 unit# 112: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms; vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing wallDetails
building 8 unit# 112: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms; vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures; outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing wall | $85,000 |
| May 23, 2024 | Completed final sign-off Jun 2024 | 501 Delancey St | building 9, unit# 401: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, facuet, toilet. vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls.Details
building 9, unit# 401: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (1) bathroom, vanity sink, facuet, toilet. vacancy sensor; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications; no removing walls. | $60,000 |
| May 23, 2024 | Completed final sign-off Jun 2024 | 160 Brannan St | building 3 unit #314: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications;no removing wallsDetails
building 3 unit #314: like for like; remove and replace; (1) kitchen, cabinets, countertops, sink, faucet; (2) bathrooms, vanity sinks, faucets, toilets, vacancy sensors; exhaust fan to remain; he lighting fixtures, outlets, switches w/ covers; no fire sprinkler/alarm modifications;no removing walls | $85,000 |
| May 21, 2024 | Completed final sign-off Oct 2025 | 1200 Oakdale Av | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202293492 items #2 &3 no change to use.Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202293492 items #2 &3 no change to use. | $275,000 |
| May 17, 2024 | Completed final sign-off Jul 2024 | 180 Brannan St | building 1: unit 107: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls.Details
building 1: unit 107: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls. | $60,000 |
| May 17, 2024 | Completed final sign-off Jun 2024 | 4 Bayside Village Pl | building 6: unit 413: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet: (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls.Details
building 6: unit 413: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet: (1) bathroom, vanity sink, faucet, toilet, vacancy sensor; exhaust fan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls. | $60,000 |
| May 10, 2024 | Completed final sign-off Oct 2025 | 62 Navy Rd | interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or..Details
interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or.. | $50,000 |
| May 10, 2024 | Completed final sign-off Oct 2025 | 44 Navy Rd | interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or..Details
interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or.. | $50,000 |
| May 10, 2024 | Completed final sign-off Oct 2025 | 74 Navy Rd | interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaustfan, radiation damper, tub/shower,p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardward. no change to use or occupancy/sqft/wall location.Details
interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaustfan, radiation damper, tub/shower,p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardward. no change to use or occupancy/sqft/wall location. | $99,000 |
| May 10, 2024 | Completed final sign-off Oct 2025 | 84 Navy Rd | interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or..Details
interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or.. | $50,000 |
| May 10, 2024 | Completed final sign-off Oct 2025 | 68 Navy Rd | interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or..Details
interior unit renovations to include new kitchen, cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use, or occupancy or sq ft or.. | $50,000 |
| May 9, 2024 | Completed final sign-off Oct 2025 | 2 Navy Rd | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardwareDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware | $50,000 |
| May 9, 2024 | Completed final sign-off Oct 2025 | 52 Navy Rd | all 4 units: interior unit renovations to include new kitchen cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall as needed. replace flooring, int. doors/hardware. no change to use or occupancy.Details
all 4 units: interior unit renovations to include new kitchen cabinets/countertops, appliances, and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall as needed. replace flooring, int. doors/hardware. no change to use or occupancy. | $100,000 |
| May 9, 2024 | Completed final sign-off Oct 2025 | 18 Navy Rd | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware. replace in kind all units. no change to occpancy...Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware. replace in kind all units. no change to occpancy... | $50,000 |
| May 9, 2024 | Completed final sign-off Oct 2025 | 30 Navy Rd | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardwareDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware | $75,000 |
| May 9, 2024 | Completed final sign-off Nov 2024 | 24 Navy Rd | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware. replace in kind all units. no change to use or....Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures,replace bathroom fixturees, exhaust fan, radiation damper, tub/shower, r trap & valves, patch drywall as needed, replace flooring, interior doors/hardware. replace in kind all units. no change to use or.... | $50,000 |
| May 6, 2024 | Completed final sign-off Jun 2024 | 3 Bayside Village Pl | unit# 306: like for like: remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (1) bathroom , vanity sink, faucet, toilet, vacancy sensor, exhauset fan to remain, he lighting fixtures, outlets, switches w/ covers, no fire sprinkler/alarm modifications, no removing wallsDetails
unit# 306: like for like: remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (1) bathroom , vanity sink, faucet, toilet, vacancy sensor, exhauset fan to remain, he lighting fixtures, outlets, switches w/ covers, no fire sprinkler/alarm modifications, no removing walls | $60,000 |
| May 6, 2024 | Completed final sign-off Jun 2024 | 180 Brannan St | unit# 405: like for like: remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (1) bathroom , vanity sink, faucet, toilet, vacancy sensor, exhauset fan to remain, he lighting fixtures, outlets, switches w/ covers, no fire sprinkler/alarm modifications, no removing wallsDetails
unit# 405: like for like: remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (1) bathroom , vanity sink, faucet, toilet, vacancy sensor, exhauset fan to remain, he lighting fixtures, outlets, switches w/ covers, no fire sprinkler/alarm modifications, no removing walls | $60,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 15 Rosie Lee Ln | all units- interior unit upgrade to include new kitchen cabinets/countertops, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy of sq ftDetails
all units- interior unit upgrade to include new kitchen cabinets/countertops, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy of sq ft | $400,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 15 Lillian St | alls unit- upgrades to include new kitchen cabinets/countertops, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply with nov#202418809 and 202317344, and....Details
alls unit- upgrades to include new kitchen cabinets/countertops, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply with nov#202418809 and 202317344, and.... | $200,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 20 Beatrice Ln | all units: upgrades to inlucde new kitchen cabinet/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layouts.Details
all units: upgrades to inlucde new kitchen cabinet/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layouts. | $1,024,000 |
| May 2, 2024 | In progress issued Jul 2024 | 10 Espanola St | all units: upgrades to inlucde new kitchen cabinet/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layouts.Details
all units: upgrades to inlucde new kitchen cabinet/countertops, appliances, fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layouts. | $89,600 |
| Apr 30, 2024 | Completed final sign-off May 2024 | 570 Beale St | bldg 4, unit 313: like for like(1) kitchen remodel (cabinets, sink, faucet). (1) bathroom remodel (vanity, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixture, outlets, switches w/covers. no f/a & f/s modification. no wall removalDetails
bldg 4, unit 313: like for like(1) kitchen remodel (cabinets, sink, faucet). (1) bathroom remodel (vanity, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixture, outlets, switches w/covers. no f/a & f/s modification. no wall removal | $60,000 |
| Apr 30, 2024 | Completed final sign-off Jun 2024 | 2 Bayside Village Pl | bldg 7, unit 114: like for like (1) kitchen remodel( cabinets, sink, faucet_). (1) bathroom remodel (vanity, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixture, outlets, switches w/covers. no f/a & f/s modification. no wall removalDetails
bldg 7, unit 114: like for like (1) kitchen remodel( cabinets, sink, faucet_). (1) bathroom remodel (vanity, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixture, outlets, switches w/covers. no f/a & f/s modification. no wall removal | $60,000 |
| Apr 29, 2024 | Completed final sign-off Sep 2025 | 1463 La Salle Av | units: 111,211,213,112,212,312,113,213,313,114,214,314,115,215,315,116,216, and 316: interior unit upgrades to include new kitchen countertops/cabinets, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiator damper, tub/showet, pt-traps and valves. patch drywall as neededDetails
units: 111,211,213,112,212,312,113,213,313,114,214,314,115,215,315,116,216, and 316: interior unit upgrades to include new kitchen countertops/cabinets, appliances and fixtures. replace bathroom fixtures, exhaust fan, radiator damper, tub/showet, pt-traps and valves. patch drywall as needed | $450,000 |
| Apr 25, 2024 | Completed final sign-off Dec 2025 | 1405 Mckinnon Av | interior unit upgrades to include kitchen cabinets, countertops, appliances and fixtures. replace bathroom fixtures, exaust fan,radiation damper, tub/shower, ptray and valves. patch drywall as needed. replace flooring, interior doors and hardware. work in kit and baths onlyDetails
interior unit upgrades to include kitchen cabinets, countertops, appliances and fixtures. replace bathroom fixtures, exaust fan,radiation damper, tub/shower, ptray and valves. patch drywall as needed. replace flooring, interior doors and hardware. work in kit and baths only | $300,000 |
| Apr 25, 2024 | Completed final sign-off Nov 2025 | 2 Garlington Ct | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layoutDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layout | $500,000 |
| Apr 25, 2024 | Completed final sign-off Apr 2026 | 19 Garlington Ct | interior unit upgrades to include new kitchen cabinets/countertops. appliances and fixtures. replacing bathroom fixtures. exhaust fan, rediation damper, tub shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to resolve nov#201899381. total 24 units remodeDetails
interior unit upgrades to include new kitchen cabinets/countertops. appliances and fixtures. replacing bathroom fixtures. exhaust fan, rediation damper, tub shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to resolve nov#201899381. total 24 units remode | $600,000 |
| Apr 25, 2024 | Completed final sign-off Sep 2025 | 1440 Mckinnon Av | interior unit upgrades to include kitchen cabinets, countertops, appliances and fixtures. replace bathroom fixtures, exaust fan,radiation damper, tub/shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors and hardware. work in kit and baths only.Details
interior unit upgrades to include kitchen cabinets, countertops, appliances and fixtures. replace bathroom fixtures, exaust fan,radiation damper, tub/shower, ptrap and valves. patch drywall as needed. replace flooring, interior doors and hardware. work in kit and baths only. | $375,000 |
| Apr 25, 2024 | In progress issued Jul 2024 | 15 Commer Ct | interior unit upgrades to include new kitchen cabinets/countertops. appliances and fixtures. replacing bathroom fixtures. exhaust fan, rediation damper, tub shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to resolve nov#202420746 & 201802671.Details
interior unit upgrades to include new kitchen cabinets/countertops. appliances and fixtures. replacing bathroom fixtures. exhaust fan, rediation damper, tub shower, p-trap and valves. patch drywall, as needed. replace flooring, interior doors/hardware. to resolve nov#202420746 & 201802671. | $550,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2025 | 1445 La Salle Av | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiotion damper, damper tub/shower, p-trap and valves. patch drywall as needed; replace flooring, interior doors/hardwood. no change in occupancy or sf or wall layouts.Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiotion damper, damper tub/shower, p-trap and valves. patch drywall as needed; replace flooring, interior doors/hardwood. no change in occupancy or sf or wall layouts. | $300,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2025 | 20 Commer Ct | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layoutDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures. exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use or occupancy or sq ft or wall layout | $400,000 |
| Apr 25, 2024 | Completed final sign-off Nov 2025 | 40 Garlington Ct | all unit interior upgrades: new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiotion damper, damper tub/shower, p-trap and valves. patch drywall as needed; replace flooring, interior doors/hardwood. no change in occupancy or sf or wall layouts.Details
all unit interior upgrades: new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiotion damper, damper tub/shower, p-trap and valves. patch drywall as needed; replace flooring, interior doors/hardwood. no change in occupancy or sf or wall layouts. | $150,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 15 Beatrice Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to useDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to use | $150,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 31 Beatrice Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to useDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to use | $150,000 |
| Apr 22, 2024 | Completed final sign-off Jun 2025 | 10 Osceola Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy or sqft or wall layouts.Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy or sqft or wall layouts. | $475,000 |
| Apr 22, 2024 | Completed final sign-off Jul 2025 | 50 Osceola Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy or sqft or wall layouts.Details
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/hardward. no change to use or occupancy or sqft or wall layouts. | $450,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 47 Beatrice Ln | to comply w/nov#202313615 & 202315052. interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to useDetails
to comply w/nov#202313615 & 202315052. interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. no change to use | $150,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 63 Beatrice Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to useDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring, interior doors/hardware. to comply w/nov#202313615 & 202315052. no change to use | $150,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 79 Beatrice Ln | to comply w/nov # 202313615 & 22315052 interior unit upgrades to include new kitchen cabinets, counter tops, appliances and fixtures replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves, patch drywall as needed, replace flooring, interior doors, hardware no change toDetails
to comply w/nov # 202313615 & 22315052 interior unit upgrades to include new kitchen cabinets, counter tops, appliances and fixtures replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves, patch drywall as needed, replace flooring, interior doors, hardware no change to | $150,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2025 | 95 Beatrice Ln | to comply w/nov # 202313615 & 22315052 interior unit upgrades to include new kitchen cabinets, counter tops, appliances and fixtures replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves, patch drywall as needed, replace flooring, interior doors, hardware no change toDetails
to comply w/nov # 202313615 & 22315052 interior unit upgrades to include new kitchen cabinets, counter tops, appliances and fixtures replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap & valves, patch drywall as needed, replace flooring, interior doors, hardware no change to | $150,000 |
| Apr 19, 2024 | Completed final sign-off May 2024 | 1 Bayside Village Pl | building 2, unit 409; like for like, remove and replace (1) kitchen, cabinets, counter tops, sink faucet, (1) bathroom, vanity sink, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixtures, outlets, switches with covers, no fire sprinker alarm modifications no removing wallsDetails
building 2, unit 409; like for like, remove and replace (1) kitchen, cabinets, counter tops, sink faucet, (1) bathroom, vanity sink, faucet, toilet, vacancy sensor, exhaust fan to remain he lighting fixtures, outlets, switches with covers, no fire sprinker alarm modifications no removing walls | $60,000 |
| Apr 19, 2024 | Completed final sign-off May 2024 | 570 Beale St | building 4 unit #105: like for like; remove and replace (1) kitchen, cabinets, counter tos, sink, faucet, (2) bathrooms, vanity sinks, faucets, toilets, vancy sensors, exhaust fan to remain , he lighting fixtures, outlets, switches with covers, no fire sprinkler alarm mofifications no removing wallsDetails
building 4 unit #105: like for like; remove and replace (1) kitchen, cabinets, counter tos, sink, faucet, (2) bathrooms, vanity sinks, faucets, toilets, vancy sensors, exhaust fan to remain , he lighting fixtures, outlets, switches with covers, no fire sprinkler alarm mofifications no removing walls | $85,000 |
| Apr 18, 2024 | Completed final sign-off Dec 2025 | 54 Rosie Lee Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layoutDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layout | $384,000 |
| Apr 18, 2024 | Completed final sign-off Dec 2025 | 35 Espanola St | interior all units upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layoutDetails
interior all units upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layout | $100,000 |
| Apr 18, 2024 | Completed final sign-off Dec 2025 | 36 Rosie Lee Ln | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layoutDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layout | $384,000 |
| Apr 18, 2024 | Completed final sign-off Dec 2025 | 25 Espanola St | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layoutDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures, replace bathroom fixtures exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use or occupancy or sq ft or layout | $256,000 |
| Apr 16, 2024 | Completed final sign-off May 2024 | 2 Bayside Village Pl | building 7 unit 218: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; bathrooms, vanity sink, faucet, toilet, vacancy sensor; exhaust ffan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls.Details
building 7 unit 218: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; bathrooms, vanity sink, faucet, toilet, vacancy sensor; exhaust ffan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls. | $60,000 |
| Apr 16, 2024 | Completed final sign-off Nov 2025 | 1301 Ingalls St | interior unit upgrades. remodel 1 kitchen + 1 bath at each unit. also, replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. comply with nov #202420357.Details
interior unit upgrades. remodel 1 kitchen + 1 bath at each unit. also, replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. comply with nov #202420357. | $500,000 |
| Apr 16, 2024 | Completed final sign-off Dec 2025 | 15 Espanola St | interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use, occupancy, sq ftDetails
interior unit upgrades to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p trap & valves. patch drywall as needed. replace flooring, interior doors/hardware. no change of use, occupancy, sq ft | $256,000 |
| Apr 16, 2024 | Completed final sign-off May 2024 | 180 Brannan St | building 1 unit 122: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; bathrooms, vanity sink, faucet, toilet, vacancy sensor; exhaust ffan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls.Details
building 1 unit 122: like for like: remove and replace: (1) kitchen cabinets, counteretops, sink, faucet; bathrooms, vanity sink, faucet, toilet, vacancy sensor; exhaust ffan to remain, he lighting fixtures, outlets, switches w/ covers; no fire sprinkler alarm modifications; no removing walls. | $60,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2025 | 1201 Ingalls St | to resolve nov# 202418399 interior unit renovations in 20 units. new kitchen cabinets, appliances, countertops & fixtures. replace bathroom fixtures, exhaust fans, radiation dampers, tub/shower, p-trap & valves. patch drywall. flooring, doors hardware. no change of use, occupanc. no wall relocation.Details
to resolve nov# 202418399 interior unit renovations in 20 units. new kitchen cabinets, appliances, countertops & fixtures. replace bathroom fixtures, exhaust fans, radiation dampers, tub/shower, p-trap & valves. patch drywall. flooring, doors hardware. no change of use, occupanc. no wall relocation. | $500,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2025 | 1241 Ingalls St | interior unit renovations in 8 units. new kitchen cabinets, appliances, countertops & fixtures. replace bathroom fixtures, exhaust fans, radiation dampers, tub/shower, p-trap & valves. patch drywall. replace flooring, interior doors and hardware. no change of use, occupancy, no wall locationsDetails
interior unit renovations in 8 units. new kitchen cabinets, appliances, countertops & fixtures. replace bathroom fixtures, exhaust fans, radiation dampers, tub/shower, p-trap & valves. patch drywall. replace flooring, interior doors and hardware. no change of use, occupancy, no wall locations | $200,000 |
| Apr 5, 2024 | Completed final sign-off May 2024 | 3 Bayside Village Pl | building 8 unit 119: like for like remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (2) bathrooms, vanity sinks, faucest, toilets, vacancy sensor, exhause fan to remain he lighting fixtures, outles, switches covers, no fire sprinkler alarm modifications, no removing wallsDetails
building 8 unit 119: like for like remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (2) bathrooms, vanity sinks, faucest, toilets, vacancy sensor, exhause fan to remain he lighting fixtures, outles, switches covers, no fire sprinkler alarm modifications, no removing walls | $85,000 |
| Apr 5, 2024 | Completed final sign-off Nov 2025 | 1257 Ingalls St | interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware. no change to use or occupancy or sqft.Details
interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware. no change to use or occupancy or sqft. | $450,000 |
| Apr 5, 2024 | Completed final sign-off Dec 2025 | 20 Baldwin Ct | interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware.(1kitchen, 1.5 bath) no wall relocationDetails
interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware.(1kitchen, 1.5 bath) no wall relocation | $200,000 |
| Apr 5, 2024 | Completed final sign-off Dec 2025 | 39 Baldwin Ct | interior unit renovations to include new kitchen: countertops, cabinets, appliances, & fixtures. replace bathroom fixtures, exhaust fan. radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/handware. 1 bath 1 kitchen per unit. no occp changeorsqftDetails
interior unit renovations to include new kitchen: countertops, cabinets, appliances, & fixtures. replace bathroom fixtures, exhaust fan. radiation damper, tub/shower, p-trap & valves. patch drywall as needed. replace flooring, interior doors/handware. 1 bath 1 kitchen per unit. no occp changeorsqft | $100,000 |
| Apr 5, 2024 | Completed final sign-off Nov 2025 | 1152 Oakdale Av | interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap& valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft.Details
interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap& valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft. | $90,430 |
| Apr 5, 2024 | Completed final sign-off Nov 2025 | 1128 Oakdale Av | interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware.Details
interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware. | $50,000 |
| Apr 5, 2024 | Completed final sign-off Nov 2025 | 15 Baldwin Ct | interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware.Details
interior unit renovations to include new kitchen: cabinets, countertops, appliances, & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/ shower, p-trap and valves. patch drywall as needed. replace flooring, interior doors/ hardware. | $100,000 |
| Apr 5, 2024 | Completed final sign-off Apr 2025 | 1160 Oakdale Av | interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap& valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft.Details
interior unit renovations to include new kitchen cabinets/countertops, appliances & fixtures. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap& valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft. | $50,000 |
| Apr 5, 2024 | Completed final sign-off May 2024 | 180 Brannan St | building 1 unit #301: like for like remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (2) bathrooms, vanity sinks, faucest, toilets, vacancy sensor, exhause fan to remain he lighting fixtures, outles, switches covers, no fire sprinkler alarm modifications, no removing wallsDetails
building 1 unit #301: like for like remove and replace (1) kitchen cabinets, counter tops, sink, faucet, (2) bathrooms, vanity sinks, faucest, toilets, vacancy sensor, exhause fan to remain he lighting fixtures, outles, switches covers, no fire sprinkler alarm modifications, no removing walls | $85,000 |
| Apr 3, 2024 | Completed final sign-off Apr 2025 | 1074 Oakdale Av | interior unit renovations to include new kitchen cabinets/countertops, appliances & fixutres. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft.Details
interior unit renovations to include new kitchen cabinets/countertops, appliances & fixutres. replace bathroom fixtures, exhaust fan, radiation damper, tub/shower, p-trap&valves. patch drywall, as needed. replace flooring & interior doors/hardward. no change to use or occupancy or sq ft. | $50,000 |