Back to bathroom remodel contractors
Refresh And Build Inc
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2018 to Jul 2026
- Last 24 months
- 7 permits filed
30 permits since 2000: 21 completed, 6 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 17 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2025 | Completed final sign-off Sep 2025 | 15 Cityview Wy | 2/f bath remodel: replace all (e) fixtures and finishes in kind at same locations. change tub to shower, change (e) bath partition from full ht to partial ht w/ glazing above; remove (e) window in kind at same location and opening.Details
2/f bath remodel: replace all (e) fixtures and finishes in kind at same locations. change tub to shower, change (e) bath partition from full ht to partial ht w/ glazing above; remove (e) window in kind at same location and opening. | $30,000 |
| Apr 1, 2025 | Completed final sign-off Jul 2025 | 166 Sussex St | remodel bathroom and upgrade cosmetics including relocating toilet to the current shower location and shower to current toilet locate. replace tub. no wall relocation.Details
remodel bathroom and upgrade cosmetics including relocating toilet to the current shower location and shower to current toilet locate. replace tub. no wall relocation. | $27,000 |
| Mar 10, 2025 | Completed final sign-off May 2025 | 2542 Fillmore St | upper floor: 2 bathrooms remodel like for like. remove (e) tiles and fixtures + install shower system + install new tiles + new finishes. all work in kindDetails
upper floor: 2 bathrooms remodel like for like. remove (e) tiles and fixtures + install shower system + install new tiles + new finishes. all work in kind | $30,000 |
| Jun 21, 2024 | In progress issued Jun 2024 | 454 14th St | remodel bathroom like for like.Details
remodel bathroom like for like. | $15,000 |
| Dec 21, 2023 | Completed final sign-off May 2024 | 2999 California St | remodel bathroom like for like: add a light and a fan: replace shower valve and shower panDetails
remodel bathroom like for like: add a light and a fan: replace shower valve and shower pan | $20,000 |
| Sep 27, 2023 | Completed final sign-off Jan 2024 | 187 Magellan Av | revision to pa# 202307121932, revision to master bathroom to add bench in shower.Details
revision to pa# 202307121932, revision to master bathroom to add bench in shower. | |
| Aug 7, 2023 | Completed final sign-off Dec 2023 | 2119 28th Av | remodel bathroom like for like (2nd flr). replace shower pan. replace tiels. replace shower head. replace vanity and fan and light.Details
remodel bathroom like for like (2nd flr). replace shower pan. replace tiels. replace shower head. replace vanity and fan and light. | $20,000 |
| Jul 12, 2023 | Completed final sign-off Jan 2024 | 187 Magellan Av | remodel 1 kitchen and 3 bathroomsDetails
remodel 1 kitchen and 3 bathrooms | $75,000 |
| Jul 3, 2023 | Completed final sign-off Jun 2025 | 1236 07th Av | revision to pa#202211035841. relocate full bath on 2nd fl.Details
revision to pa#202211035841. relocate full bath on 2nd fl. | |
| Jun 12, 2023 | Completed final sign-off Dec 2023 | 2119 28th Av | bathroom remodel like for like: replace lights and exhaust fan. install/replace valve for shower head. tile floors and walls for shower pan. replace vanity. no structural work. no change to floor layout. no change to wall layout.Details
bathroom remodel like for like: replace lights and exhaust fan. install/replace valve for shower head. tile floors and walls for shower pan. replace vanity. no structural work. no change to floor layout. no change to wall layout. | $20,000 |
| Jun 12, 2023 | Completed final sign-off Nov 2023 | 342 Hayes St | unit# n: bathroom remodel like for like. replace one light and one fan. replace shower pan. replace shower valve and bathrom floors. maintain all cbc chp 11a accessibility requirements at time of construction. no structural work. no change to floor layout. no change to wall layout.Details
unit# n: bathroom remodel like for like. replace one light and one fan. replace shower pan. replace shower valve and bathrom floors. maintain all cbc chp 11a accessibility requirements at time of construction. no structural work. no change to floor layout. no change to wall layout. | $15,000 |
| Nov 3, 2022 | Completed final sign-off Jun 2025 | 1236 07th Av | 1st fl-remodel flr areas and convert (e) unconditioned into (n) conditioned areas to incl - 2 bedrms, 2 full baths, family rm, wet bar & laundry; remove (e) int'r wall @ front entry for (n) interior connection between flrs of unit; create (n) passageway. relocate (e) gas meters & electrical panel;Details
1st fl-remodel flr areas and convert (e) unconditioned into (n) conditioned areas to incl - 2 bedrms, 2 full baths, family rm, wet bar & laundry; remove (e) int'r wall @ front entry for (n) interior connection between flrs of unit; create (n) passageway. relocate (e) gas meters & electrical panel; | $150,000 |
| Apr 11, 2022 | Completed final sign-off Jul 2022 | 1280 Ellis St | remodel bathroom like for like, use some circuits for electrical replace valve and deverter for plumbing. no structural work. no wall/ framing modification.Details
remodel bathroom like for like, use some circuits for electrical replace valve and deverter for plumbing. no structural work. no wall/ framing modification. | $30,000 |
| Aug 20, 2021 | Completed final sign-off Nov 2021 | 2531 34th Av | remodel bath like for like. demo, install new tub, new tile, new vanity, paint, fan. lights per cec 150.0 kDetails
remodel bath like for like. demo, install new tub, new tile, new vanity, paint, fan. lights per cec 150.0 k | $20,000 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 82 Alvarado St | remodel guest bathroom in-kind, demo, upgrade plumbing, install but, install tiles/vanity, toiletDetails
remodel guest bathroom in-kind, demo, upgrade plumbing, install but, install tiles/vanity, toilet | $17,000 |
| Dec 31, 2018 | Completed final sign-off Jun 2019 | 347 Los Palmos Dr | remodel bathroom like for like. upgrade plumbing up to code and installation of tiles on shower floor and walls. install one fand install one light install vanity and toilet.Details
remodel bathroom like for like. upgrade plumbing up to code and installation of tiles on shower floor and walls. install one fand install one light install vanity and toilet. | $22,000 |
| Nov 29, 2018 | Never finaled issued Nov 2018, no final | 325 Morse St | remodel a guest bathroom, like for like. no structural.Details
remodel a guest bathroom, like for like. no structural. | $15,000 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 1776 Sacramento St | apt 401: remodel 1 bathroom, like for like, 40sf. no changes to layout, no mods to walls. maher n/a.Details
apt 401: remodel 1 bathroom, like for like, 40sf. no changes to layout, no mods to walls. maher n/a. | $16,000 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 780 Clipper St | remodel bathroom, like for likeDetails
remodel bathroom, like for like | $10,000 |