Back to bathroom remodel contractors
Redpoint Builders
- Based in
- Oakland
- On San Francisco permits
- Dec 2009 to Jun 2011
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 11 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2011 | Completed final sign-off Jul 2012 | 2473 Jackson St | demo & replace kitchen, bathroom & powder room, upgrade panel, add outlets, lights and switches, new plumbing as required, exhaust fan for bath, remove pantry. no change to doors. replace windows @ lightwell, replace in kind. max ufactor 0.40. lighting to comply with cec 150(k)Details
demo & replace kitchen, bathroom & powder room, upgrade panel, add outlets, lights and switches, new plumbing as required, exhaust fan for bath, remove pantry. no change to doors. replace windows @ lightwell, replace in kind. max ufactor 0.40. lighting to comply with cec 150(k) | $48,000 |
| Mar 10, 2011 | Completed final sign-off Sep 2011 | 727 11th Av | remodel existing bathroom. turn powder room and bath into 1 room. new plumbing, elec, tile. outdoor planter platform and screen at lightwellDetails
remodel existing bathroom. turn powder room and bath into 1 room. new plumbing, elec, tile. outdoor planter platform and screen at lightwell | $50,000 |
| Dec 16, 2009 | Completed final sign-off Mar 2010 | 2471 Jackson St | refinish floors (wood) & tile floor @ 2471 jackson st only; remove/replace ktichen cabinets, upgrade electrical main panel/add gfi protection, upgrade bathroom - new tile, tub, vanity (one) plumbing fixtures, no structural changes. no new lightingDetails
refinish floors (wood) & tile floor @ 2471 jackson st only; remove/replace ktichen cabinets, upgrade electrical main panel/add gfi protection, upgrade bathroom - new tile, tub, vanity (one) plumbing fixtures, no structural changes. no new lighting | $42,000 |