Back to bathroom remodel contractors
Reab Construction
- Based in
- Forestville
- On San Francisco permits
- Jun 2011 to Jun 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 4 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2013 | Completed final sign-off Jun 2013 | 1111 Greenwich St | remove and replace drywall on ceilings master bedroom and bath, guest bedroom and bath and 5' of hallway add. installation and spring system type sound system. replace extg can lighting to ic can lighting. 2 layers of 5/8 inch gyp. boardDetails
remove and replace drywall on ceilings master bedroom and bath, guest bedroom and bath and 5' of hallway add. installation and spring system type sound system. replace extg can lighting to ic can lighting. 2 layers of 5/8 inch gyp. board | $50,000 |