Re-Model Design & Build Co

Contractor license
1042279
State license record
Based in
San Jose
On San Francisco permits
Oct 2020 to Mar 2023
Last 24 months
0 permits filed

8 permits since 2000: 8 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 5Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 174 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 30, 2023Completed
final sign-off May 2023
73 Estero Av(2) non structural bathroom remodel like for like: replace plumbing fixtures.
Details
Permit
202303304706
Status
complete
Filed
Mar 30, 2023
Permit issued
Mar 30, 2023
Final sign-off
May 30, 2023
Declared cost
$45,000
Address
73 Estero Av

(2) non structural bathroom remodel like for like: replace plumbing fixtures.

Open the permit page

$45,000
Mar 17, 2022Completed
final sign-off Dec 2022
1896 Green St1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor.
Details
Permit
202203170218
Status
complete
Filed
Mar 17, 2022
Permit issued
Mar 17, 2022
Final sign-off
Dec 29, 2022
Declared cost
$35,000
Address
1896 Green St

1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor.

Open the permit page

$35,000