Re-Craft
- Based in
- San Bruno
- On San Francisco permits
- Jun 2004 to Feb 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2021 | Never finaled issued May 2021, no final | 1025 Anza St | permit for changes made to plans during construction: revise plan at 1st floor dwelling unit; rebuild entry stairs in kind; revise plan at 3rd floor bathroom. no expansion to scope of building. revision to app 201804307820Details
permit for changes made to plans during construction: revise plan at 1st floor dwelling unit; rebuild entry stairs in kind; revise plan at 3rd floor bathroom. no expansion to scope of building. revision to app 201804307820 | $16,940 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 1025 Anza St | street spaceDetails
street space | |
| Apr 30, 2018 | Never finaled issued Nov 2018, no final | 1025 Anza St | add new vertical addition to include a master bedroom, master bathroom and storage with new rear deck at roof of second floor.Details
add new vertical addition to include a master bedroom, master bathroom and storage with new rear deck at roof of second floor. | $150,000 |
| Nov 7, 2012 | Never finaled issued Nov 2012, no final | 350 Sweeny St | remove & replace (in-kind) approx 400 sq ft of stucco. windows are visible from street.Details
remove & replace (in-kind) approx 400 sq ft of stucco. windows are visible from street. | $2,500 |
| Jun 24, 2004 | Completed final sign-off Jan 2005 | 310 Missouri St | removal of lathe & plaster wall finish, upgrade/replace elect, plumb, work in kitchen & barth.Details
removal of lathe & plaster wall finish, upgrade/replace elect, plumb, work in kitchen & barth. | $20,000 |