Rdz Landscape Evolution Llc
- Based in
- El Sobrante
- On San Francisco permits
- Nov 2026 to Nov 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 2 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2026 | In progress issued Nov 2026 | 410 27th St | rehab existing deck, less than 130 sq ft less than 10' high. same footprint - rehab (e) fire wall; new rails/guard rail/hand rail. resize w 24" steps to 36"wide.Details
rehab existing deck, less than 130 sq ft less than 10' high. same footprint - rehab (e) fire wall; new rails/guard rail/hand rail. resize w 24" steps to 36"wide. | $40,000 |