Rc Air
- Based in
- San Jose
- On San Francisco permits
- Jul 2012 to Jul 2012
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 6 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2012 | Completed final sign-off Jul 2012 | 1211 Sanchez St | install horiz. furnace in attic. supply 120v service, gas, drain, vent, decking and access. remove old wall furnace. supply and in take ducting.Details
install horiz. furnace in attic. supply 120v service, gas, drain, vent, decking and access. remove old wall furnace. supply and in take ducting. | $7,000 |