Back to bathroom remodel contractors
Raymond Villasenor Building Contractor
- Based in
- San Rafael
- On San Francisco permits
- Mar 2001 to Oct 2023
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2018 | Expired or cancelled cancelled Jun 2018 | 2355 Polk St | unit #404: kitchen and bathroom remodel. patch plaster throughout unit as needed. no alteration for any wall. no structural work. maher n/aDetails
unit #404: kitchen and bathroom remodel. patch plaster throughout unit as needed. no alteration for any wall. no structural work. maher n/a | $35,000 |
| Dec 17, 2015 | Completed final sign-off Jun 2016 | 40 Whiting St | second floor interior upgrades. kitchen and bathroom. plumbing fixtures upgrade.Details
second floor interior upgrades. kitchen and bathroom. plumbing fixtures upgrade. | $60,000 |
| Sep 14, 2015 | Completed final sign-off Dec 2016 | 2871 Octavia St | upgrade kitchen and bathroom, cabinets & appliances. 300 sq ft. remove wall between kitchen & dining room. provide new beam at interior opening btwn kitchen and dining rm. no change to egress, occupancy, or increase. no work to bedroom wallsDetails
upgrade kitchen and bathroom, cabinets & appliances. 300 sq ft. remove wall between kitchen & dining room. provide new beam at interior opening btwn kitchen and dining rm. no change to egress, occupancy, or increase. no work to bedroom walls | $50,000 |
| Oct 10, 2006 | Completed final sign-off Dec 2006 | 2755 Buchanan St | hall bathroom. stall shower. stripe tile to stud line on walls and shower floor. install 15# felt & 5/8" water resistant sheetrock. install mortar bed & ceramic tile. no structural work.Details
hall bathroom. stall shower. stripe tile to stud line on walls and shower floor. install 15# felt & 5/8" water resistant sheetrock. install mortar bed & ceramic tile. no structural work. | $3,200 |
| Nov 11, 2002 | Completed final sign-off Jan 2003 | 2255 Lyon St | partiton exist. garden storage room to create gardeners mudroom/bathroom.Details
partiton exist. garden storage room to create gardeners mudroom/bathroom. | $7,000 |