Back to bathroom remodel contractors
Ray Tom Construction
- Based in
- San Franicisco
- On San Francisco permits
- Jul 2000 to Feb 2016
- Last 24 months
- 0 permits filed
106 permits since 2000: 88 completed, 7 never finaled, 11 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
44 bathroom remodel permits: 35 completed, 5 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2015 | Never finaled issued Jan 2016, no final | 26 Chenery St | removal of fireplace & chimney. renovation of kitchen. addition of 4 skylights, replacement of all windows in extg position. movement of some walls, bathrooms from 3 rooms/2 bath to 2 bedrooms, 2 & half baths. redo of all drywall, electrical, flooring,ducting. structural support of wall changes.Details
removal of fireplace & chimney. renovation of kitchen. addition of 4 skylights, replacement of all windows in extg position. movement of some walls, bathrooms from 3 rooms/2 bath to 2 bedrooms, 2 & half baths. redo of all drywall, electrical, flooring,ducting. structural support of wall changes. | $190,000 |
| Sep 9, 2014 | Completed final sign-off Dec 2014 | 495 44th Av | replace kitchen cabinets & counter tops, replace plubming fixtures & tile work in bathroom, upgrade hall laundry.Details
replace kitchen cabinets & counter tops, replace plubming fixtures & tile work in bathroom, upgrade hall laundry. | $33,000 |
| Apr 17, 2014 | Completed final sign-off Aug 2014 | 1231 Guerrero St | unit a -kitchen & bathroom remodel, add study room.Details
unit a -kitchen & bathroom remodel, add study room. | $38,000 |
| Feb 27, 2014 | Completed final sign-off Oct 2014 | 1632 Quint St | legalize existing bedrooms, one full bathroom, construct one new bath room, storage room & laundry room. all work on ground floor.Details
legalize existing bedrooms, one full bathroom, construct one new bath room, storage room & laundry room. all work on ground floor. | $48,000 |
| Feb 6, 2014 | Never finaled issued Feb 2014, no final | 199 Coleridge St | replace plumbing and light fixtures for bathroom. electrical upgrade for whole unit.Details
replace plumbing and light fixtures for bathroom. electrical upgrade for whole unit. | $20,000 |
| Sep 24, 2013 | Expired or cancelled cancelled May 2015 | 2755 Mcallister St | horizontal extension. ground floor new unit: 1 bedroom, 1 study, full bath. 2/fl: relocate dining room & kitchen. new deck.Details
horizontal extension. ground floor new unit: 1 bedroom, 1 study, full bath. 2/fl: relocate dining room & kitchen. new deck. | $200,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 1727 Hayes St | 1) add one full bathroom. 2)remodel one full bathroom. 3)add 8 feet kitchen cabinets with counter top. all work on 1727 hayes street only.Details
1) add one full bathroom. 2)remodel one full bathroom. 3)add 8 feet kitchen cabinets with counter top. all work on 1727 hayes street only. | $36,000 |
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 806 Cole St | replace plumbing fixtures and retile for four bathrooms. patch openigns related to electrical work (rewiring)Details
replace plumbing fixtures and retile for four bathrooms. patch openigns related to electrical work (rewiring) | $38,000 |
| Jun 27, 2011 | Completed final sign-off Nov 2013 | 2623 Divisadero St | new staircase @ rear. master bathroom addition under eve & new dormer @ north west.Details
new staircase @ rear. master bathroom addition under eve & new dormer @ north west. | $27,000 |
| Jun 10, 2011 | Completed final sign-off Oct 2012 | 2623 Divisadero St | interior renovation of (e) one kitchen and two bathroom to structural work. lighting to comply with cec 150 (k). no change exterior walls window, door.Details
interior renovation of (e) one kitchen and two bathroom to structural work. lighting to comply with cec 150 (k). no change exterior walls window, door. | $75,000 |
| Jun 6, 2011 | Expired or cancelled expired Dec 2013 | 1229 Guerrero St | replace plumbing and light fixtures. new tile work for hall (1) bathroom only. no changes to windows, walls, doors. lighting to comply with cec 150 (k)Details
replace plumbing and light fixtures. new tile work for hall (1) bathroom only. no changes to windows, walls, doors. lighting to comply with cec 150 (k) | $13,000 |
| Dec 14, 2010 | Completed final sign-off Sep 2011 | 228 Elsie St | exterior remodeling renovatefront elevation raise ceiling on 3rd floor rer bedroom and bathroom.Details
exterior remodeling renovatefront elevation raise ceiling on 3rd floor rer bedroom and bathroom. | $60,000 |
| Nov 5, 2010 | Completed final sign-off Jan 2011 | 2107 San Jose Av | to comply with nov 201071028. remodel of kitchen and bath on 2nd floor (no work on walls) new water heater and furnace per pa # 201009231493. close skylight and restore to original roof condition.Details
to comply with nov 201071028. remodel of kitchen and bath on 2nd floor (no work on walls) new water heater and furnace per pa # 201009231493. close skylight and restore to original roof condition. | $10,000 |
| Aug 2, 2010 | Completed final sign-off Sep 2010 | 2335 Balboa St | add one half bathroom and laundry room on the ground floor per plan.Details
add one half bathroom and laundry room on the ground floor per plan. | $10,000 |
| May 27, 2010 | Completed final sign-off May 2011 | 960 Guerrero St | (1) replace kitchen counter top and new wood flooring. (2). replace two bathroom tiles 3)replace water damaged wood siding for one wall approx. 8'x12'. 4)cover walls and ceiling opening after electrical work total 8 rooms.Details
(1) replace kitchen counter top and new wood flooring. (2). replace two bathroom tiles 3)replace water damaged wood siding for one wall approx. 8'x12'. 4)cover walls and ceiling opening after electrical work total 8 rooms. | $38,000 |
| Jan 12, 2010 | Completed final sign-off Jul 2010 | 1365 Bay St | replace kitchen cabinets & coungters with new appliances with same layout. all the work to be done in #1367; replace bathroom tiles, fixtures & one small window; repalce 2 windows in two bedrooms from aluminum to vinyl (same size). (not visible fr st),u-factor 0.40 max,no structural work.Details
replace kitchen cabinets & coungters with new appliances with same layout. all the work to be done in #1367; replace bathroom tiles, fixtures & one small window; repalce 2 windows in two bedrooms from aluminum to vinyl (same size). (not visible fr st),u-factor 0.40 max,no structural work. | $18,000 |
| Jan 12, 2010 | Completed final sign-off Jul 2010 | 1365 Bay St | replace kitchen cabinets & counters with new appliances with same layout. all the work to be done in #1365; replace bathroom tiles & kixtures & one window; replace two windows in two bedrooms from aluminum to vinyl (same size) for back wall (not visible fr str),u-factor 0.40 max, no structural work.Details
replace kitchen cabinets & counters with new appliances with same layout. all the work to be done in #1365; replace bathroom tiles & kixtures & one window; replace two windows in two bedrooms from aluminum to vinyl (same size) for back wall (not visible fr str),u-factor 0.40 max, no structural work. | $18,000 |
| Oct 22, 2009 | Completed final sign-off Jan 2010 | 74 Oneida Av | grd fl.2 new bedrooms, 2 full bathrooms,laundry & storage rm. 2nd fl.add 1 full bath, remodel kitchen & (e) bathr replace plumbing, lighting, counter, cabinets,bath tub, appliances. 2nd fl.repair (e)skylights in kind above bathroom to comply w/ nov 200922191.Details
grd fl.2 new bedrooms, 2 full bathrooms,laundry & storage rm. 2nd fl.add 1 full bath, remodel kitchen & (e) bathr replace plumbing, lighting, counter, cabinets,bath tub, appliances. 2nd fl.repair (e)skylights in kind above bathroom to comply w/ nov 200922191. | $60,000 |
| May 13, 2009 | Completed final sign-off Jun 2009 | 1231 Guerrero St | work @ unit# 1231 b only. replace plumbing fixture & tile bathroom. replace 6' long cabinets & counter top, refinish wood floor, new plumbing fixtures & new paint for kitchen. no structural change.Details
work @ unit# 1231 b only. replace plumbing fixture & tile bathroom. replace 6' long cabinets & counter top, refinish wood floor, new plumbing fixtures & new paint for kitchen. no structural change. | $18,200 |
| Apr 14, 2009 | Completed final sign-off Jul 2009 | 2337 Balboa St | unit #2337: replace kitchen cabinets and counter tops, new tile flooring, approx 10'x13'; working on lower unit only (unit #2337); replace toilet and new tile flooring in bathroom, replace one window in bathroom (can't see from street)Details
unit #2337: replace kitchen cabinets and counter tops, new tile flooring, approx 10'x13'; working on lower unit only (unit #2337); replace toilet and new tile flooring in bathroom, replace one window in bathroom (can't see from street) | $20,000 |
| Apr 13, 2009 | Completed final sign-off Jul 2009 | 2335 Balboa St | replace kitchen cabinets & counter tops, new tile flooring. approx 10'x13'. replace plumbing & new tile floor in bathroom. replace two windows in lightwell are (can't see from street)Details
replace kitchen cabinets & counter tops, new tile flooring. approx 10'x13'. replace plumbing & new tile floor in bathroom. replace two windows in lightwell are (can't see from street) | $20,000 |
| Nov 17, 2008 | Completed final sign-off Mar 2009 | 136 Kingston St | grnd flr unit: replace 12'long cabinets and counter in kitchen, replace tiles and fixtures in one bathroom, provide fluorescent lights per title 24 lighting mandatory measures.Details
grnd flr unit: replace 12'long cabinets and counter in kitchen, replace tiles and fixtures in one bathroom, provide fluorescent lights per title 24 lighting mandatory measures. | $21,000 |
| Oct 20, 2008 | Completed final sign-off Apr 2009 | 1607 21st Av | interior renovation of 2nd fl, relocate kitchen combine w/ dining rm, enlarge of bath & addt of full bath in master rm, infill light-well for enlarge bath, relocate laundry area, furnace, upgrade mech piping, ductwork, plumbing, lighting.Details
interior renovation of 2nd fl, relocate kitchen combine w/ dining rm, enlarge of bath & addt of full bath in master rm, infill light-well for enlarge bath, relocate laundry area, furnace, upgrade mech piping, ductwork, plumbing, lighting. | $40,000 |
| Sep 3, 2008 | Expired or cancelled expired Aug 2012 | 2479 39th Av | add 2 bedrooms, 1 full bath, 1 storage/laundry room on existing ground floor per planDetails
add 2 bedrooms, 1 full bath, 1 storage/laundry room on existing ground floor per plan | $32,000 |
| Aug 12, 2008 | Completed final sign-off Sep 2008 | 2315 21st Av | replace plumbing & light fixtures, new tile and 2 windows (patio area) only for bathroom.Details
replace plumbing & light fixtures, new tile and 2 windows (patio area) only for bathroom. | $10,000 |
| Apr 14, 2008 | Completed final sign-off Jun 2008 | 1229 20th Av | repalce drywall and tile sub-flooring, plumbing & light fixtures for one 5'x8' bathroom only in apt #2Details
repalce drywall and tile sub-flooring, plumbing & light fixtures for one 5'x8' bathroom only in apt #2 | $8,000 |
| Jan 25, 2008 | Completed final sign-off Jan 2008 | 2701 Kirkham St | revision to pa# 2007/06/27/5241 to change proposed bedroom on ground floor to study room and change the size of the windows. change proposed bathroom configuration on the ground floor.Details
revision to pa# 2007/06/27/5241 to change proposed bedroom on ground floor to study room and change the size of the windows. change proposed bathroom configuration on the ground floor. | |
| Dec 31, 2007 | Completed final sign-off Jun 2008 | 1144 Haight St | (work to be done at unit #1144 - lot 033) strip interior walls for bathroom renovations. no structural work is to be performed.Details
(work to be done at unit #1144 - lot 033) strip interior walls for bathroom renovations. no structural work is to be performed. | $6,400 |
| Sep 26, 2007 | Completed final sign-off Sep 2008 | 1227 Guerrero St | reconfigure one bath and one kitchenin (e) location. replace all fixture and fittings. 2(e) skylites to be removed and roof hatched, 1 new skylite and replace 1 skylite, replace kitchen windowin (e0 location and same sizeDetails
reconfigure one bath and one kitchenin (e) location. replace all fixture and fittings. 2(e) skylites to be removed and roof hatched, 1 new skylite and replace 1 skylite, replace kitchen windowin (e0 location and same size | $100,000 |
| Sep 26, 2007 | Completed final sign-off May 2008 | 12 Manzanita Av | repalce plumbing & lighting fixtures, new floor & wall tiles for two bathrooms @ top floor.Details
repalce plumbing & lighting fixtures, new floor & wall tiles for two bathrooms @ top floor. | $20,000 |
| Aug 14, 2007 | Completed final sign-off Jan 2008 | 2047 31st Av | remodel kitchen & one hall bathroom on 2nd floor.new elect wire for dining & living rm. 60% of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on occupant sensor.Details
remodel kitchen & one hall bathroom on 2nd floor.new elect wire for dining & living rm. 60% of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on occupant sensor. | $26,000 |
| Jun 19, 2007 | Completed final sign-off Nov 2007 | 2126 27th Av | revision to pa 200606224811 ground floor plan: enlarge (e) bedroom & add full bathroom on existing ground floor. relocate (e) laundry room & convert (e) laundry room to new storage use.Details
revision to pa 200606224811 ground floor plan: enlarge (e) bedroom & add full bathroom on existing ground floor. relocate (e) laundry room & convert (e) laundry room to new storage use. | $16,000 |
| Mar 28, 2007 | Completed final sign-off Aug 2007 | 1696 Mcallister St | proposed (n) opening between the kitchen and family room. reconfigure master bath, (n) plumbing fixtures, electr. fixtures, finished in master bath. remodel bath. tile shower in kids bath.Details
proposed (n) opening between the kitchen and family room. reconfigure master bath, (n) plumbing fixtures, electr. fixtures, finished in master bath. remodel bath. tile shower in kids bath. | $40,000 |
| Aug 9, 2006 | Completed final sign-off Sep 2006 | 197 Coleridge St | remove existing bath tub and replace by new washerand dryer on existing 2nd floor bathroom. remodel exiwsting bathroom on existing 3rd floor per planDetails
remove existing bath tub and replace by new washerand dryer on existing 2nd floor bathroom. remodel exiwsting bathroom on existing 3rd floor per plan | $7,000 |
| May 5, 2006 | Completed final sign-off Jul 2006 | 1911 San Jose Av | to legalize existing 1 bedroom, 1 full bath, 1 storage on existing ground floor per planDetails
to legalize existing 1 bedroom, 1 full bath, 1 storage on existing ground floor per plan | $10,000 |
| Feb 8, 2006 | Completed final sign-off Apr 2006 | 1340 Geneva Av | to add 1 full bath room & bedroom. (e) kitchen & bath room on (e) 2nd floor per plan.Details
to add 1 full bath room & bedroom. (e) kitchen & bath room on (e) 2nd floor per plan. | $16,000 |
| Feb 28, 2005 | Completed final sign-off May 2005 | 38 Ankeny St | legalize existinig one family room, two bedrooml one full bath room on existing ground floor perDetails
legalize existinig one family room, two bedrooml one full bath room on existing ground floor per | $18,000 |
| Dec 27, 2004 | Never finaled issued Dec 2004, no final | 526 Somerset St | to add 2 bedroom. 2 full bathroom. 1 storage & 1 laundry room on (e) ground floor per plan.Details
to add 2 bedroom. 2 full bathroom. 1 storage & 1 laundry room on (e) ground floor per plan. | $28,000 |
| Dec 15, 2004 | Completed final sign-off Apr 2005 | 41 Balceta Av | remodel bathroom, replace toilet, tub sink & retileDetails
remodel bathroom, replace toilet, tub sink & retile | $3,500 |
| Oct 12, 2004 | Completed final sign-off Dec 2004 | 77 Concord St | to add two bedrooms, one full bathroom, one storage & one laundry rm on existing grnd flr per planDetails
to add two bedrooms, one full bathroom, one storage & one laundry rm on existing grnd flr per plan | $18,000 |
| Apr 27, 2004 | Completed final sign-off Nov 2004 | 17 Maynard St | legalize 2 bedrooms,1 family room,1 full bath & remove (e)stove,sink,counter on g/fDetails
legalize 2 bedrooms,1 family room,1 full bath & remove (e)stove,sink,counter on g/f | $3,000 |
| Dec 22, 2003 | Completed final sign-off Mar 2004 | 2369 Chestnut St | replace kitchen and bath fixtures replace cabients and counters new sheetrock for hallway no struct.Details
replace kitchen and bath fixtures replace cabients and counters new sheetrock for hallway no struct. | $20,000 |
| Jul 30, 2003 | Never finaled issued Jul 2003, no final | 1258 36th Av | construct 1 story rear deck 9'max, add 1 play room/1 family room/2 bedroom/2 full bath/1 storage/Details
construct 1 story rear deck 9'max, add 1 play room/1 family room/2 bedroom/2 full bath/1 storage/ | $30,000 |
| Mar 7, 2002 | Expired or cancelled expired Jul 2003 | 514 20th Av | relocate rear stair,new bearing wall,enlarge ktchn,rmdl bath,new footing for post,ftngDetails
relocate rear stair,new bearing wall,enlarge ktchn,rmdl bath,new footing for post,ftng | $115,000 |