Back to bathroom remodel contractors
Ravano & Cooney Const Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jul 2015
- Last 24 months
- 0 permits filed
73 permits since 2000: 59 completed, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2015 | Never finaled issued Aug 2015, no final | 15 Montclair Tr | exterior remodel: replace windows, skylights, doors, add front windows at 1st and 2nd floor. replace wood siding with stucco and wood. replace front and rear balconies and guardrails, add entry canopy. interior remdoel: reconfigure kitechen, bathrooms, remove 2nd fl kitchen, add stair to garage.Details
exterior remodel: replace windows, skylights, doors, add front windows at 1st and 2nd floor. replace wood siding with stucco and wood. replace front and rear balconies and guardrails, add entry canopy. interior remdoel: reconfigure kitechen, bathrooms, remove 2nd fl kitchen, add stair to garage. | $250,000 |
| Jun 6, 2012 | Completed final sign-off Nov 2012 | 1985 08th Av | interior remodel of existing bathroom. addition of 1 bedroom, wholly within interior of e building. no additional square footage. replace door in e opening, replace window in e opening. new door in e window opening. not visible from streetDetails
interior remodel of existing bathroom. addition of 1 bedroom, wholly within interior of e building. no additional square footage. replace door in e opening, replace window in e opening. new door in e window opening. not visible from street | $20,000 |
| Jul 26, 2011 | Completed final sign-off Jan 2012 | 118 Liberty St | remodel one kitchen in 118b (ground level rear unit), remodel 1 kitchen & 2 baths in 118(1st flr unit), comply with complaint 20118826; install archway headers which seem inadequateDetails
remodel one kitchen in 118b (ground level rear unit), remodel 1 kitchen & 2 baths in 118(1st flr unit), comply with complaint 20118826; install archway headers which seem inadequate | $125,000 |
| Jul 27, 2010 | Completed final sign-off Mar 2011 | 125 Presidio Av | interior remodel of kitchen and bathrooms, interior painting, replace rear door to match existing and upgrade electrical.Details
interior remodel of kitchen and bathrooms, interior painting, replace rear door to match existing and upgrade electrical. | $400,000 |
| Jun 17, 2010 | Never finaled issued Jun 2010, no final | 33 Seward St | remodel bathroom:provide h.e. lights or t-24 0.5. kitchen electrical:provide min 50% of kitchen light watt in h e. lightsDetails
remodel bathroom:provide h.e. lights or t-24 0.5. kitchen electrical:provide min 50% of kitchen light watt in h e. lights | $10,000 |
| Apr 28, 2010 | Never finaled issued Apr 2010, no final | 31 Seward St | replace cabinets & counter @ kitchen in both units. remodel bathroom fixture on 1st floor @ 31 seward st. replace dry-rotted joist & boards on 6'x10' front deck (off lowe unit). add drywall over plaster ceiling in living & bedroom @ 33 seward st. (lower unit)Details
replace cabinets & counter @ kitchen in both units. remodel bathroom fixture on 1st floor @ 31 seward st. replace dry-rotted joist & boards on 6'x10' front deck (off lowe unit). add drywall over plaster ceiling in living & bedroom @ 33 seward st. (lower unit) | $25,000 |
| Apr 21, 2009 | Expired or cancelled expired May 2013 | 3330 Octavia St | bathroom remodel in unit 4 (top rear unit) add 1 12' non bearing wall to create a studyDetails
bathroom remodel in unit 4 (top rear unit) add 1 12' non bearing wall to create a study | $10,000 |