Rankin Design
- Based in
- San Carlos
- On San Francisco permits
- Nov 2011 to Apr 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2012 | Completed final sign-off Aug 2012 | 47 Cuvier St | repair exterior entry stair, include replacing deteroriated stringers, risers and treads. existing railing to be removed and re-installed. replace components "in kind". stair repair in kind.Details
repair exterior entry stair, include replacing deteroriated stringers, risers and treads. existing railing to be removed and re-installed. replace components "in kind". stair repair in kind. | $7,500 |
| Nov 7, 2011 | Completed final sign-off Jan 2012 | 2466 44th Av | replace (e) front window w/ new unit. (n) window to fit (e) opening. repair stucco around window.Details
replace (e) front window w/ new unit. (n) window to fit (e) opening. repair stucco around window. | $2,800 |