Back to bathroom remodel contractors
Randy's Construction
- Based in
- Millbrae
- On San Francisco permits
- Aug 2013 to Mar 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 22 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2022 | Completed final sign-off Apr 2023 | 2442 29th Av | remodel (e) kitchen & bath & add 1 bath @ 2nd fl. reconfigure (e0 interior stair from 2nd fl to ground fl. construct (n) retaining wall & deck w/ stair @ rear yard. infill new tool room below (e) bedroom. infill (e) lightwells (north & south side).Details
remodel (e) kitchen & bath & add 1 bath @ 2nd fl. reconfigure (e0 interior stair from 2nd fl to ground fl. construct (n) retaining wall & deck w/ stair @ rear yard. infill new tool room below (e) bedroom. infill (e) lightwells (north & south side). | $96,000 |
| Mar 25, 2021 | Completed final sign-off Mar 2022 | 101 Marview Wy | construct 1 bedroom 1 full bath & family room on 1st fl. revision to no-plan pa# 202103166583. remodel (e) kitchen & 2 bath. replace sheetrock insulation with new at 2nd fl.Details
construct 1 bedroom 1 full bath & family room on 1st fl. revision to no-plan pa# 202103166583. remodel (e) kitchen & 2 bath. replace sheetrock insulation with new at 2nd fl. | $80,000 |
| Feb 21, 2020 | Completed final sign-off Jun 2020 | 2231 14th Av | existing 1st floor bathroom renovation: enlarge (e) shower.Details
existing 1st floor bathroom renovation: enlarge (e) shower. | $5,000 |
| Aug 20, 2013 | Completed final sign-off Jan 2014 | 2609 31st Av | legalize (e) family room, 1 bathroom & construct 2 bedrooms. 1 new bathroom. all work at ground floorDetails
legalize (e) family room, 1 bathroom & construct 2 bedrooms. 1 new bathroom. all work at ground floor | $42,000 |