Ramon Heredia Ortiz
- Based in
- San Francisco
- On San Francisco permits
- Aug 2026 to Aug 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 1037 Pacific Av | replace 16 windows total: 4 at the front of the building, 7 at the rear, and 5 along the stairway area. replace siding as needed and replace 2 doors at the stairway exit area (u factor was above) 0.31. doors at front and back.Details
replace 16 windows total: 4 at the front of the building, 7 at the rear, and 5 along the stairway area. replace siding as needed and replace 2 doors at the stairway exit area (u factor was above) 0.31. doors at front and back. | $39,000 |