Permit GraphShortlistSan Francisco building permits since 2000

Rambolt General Contractors

Contractor license
808144
State license record
Based in
San Francisco
On San Francisco permits
Oct 2004 to Apr 2008
Last 24 months
0 permits filed

9 permits since 2000: 8 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 2Stairs 2Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 57 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 31, 2008Completed
final sign-off Mar 2008
884 Alvarado Strevision to p/a #2004.1025.7657. ground floor: add shower to bathroom, reconfigure partition walls. enlarge workshop area, relocate water heater to third story exterior (tankless water heater).
Details
Permit
200801313621
Status
complete
Filed
Jan 31, 2008
Permit issued
Jan 31, 2008
Final sign-off
Mar 28, 2008
Declared cost
$10,000
Address
884 Alvarado St

revision to p/a #2004.1025.7657. ground floor: add shower to bathroom, reconfigure partition walls. enlarge workshop area, relocate water heater to third story exterior (tankless water heater).

Open the permit page

$10,000