Permit GraphShortlistSan Francisco building permits since 2000

Raiter Construction Inc

Contractor license
710810
State license record
Based in
San Francisco
On San Francisco permits
Jun 2007 to Feb 2012
Last 24 months
0 permits filed

14 permits since 2000: 7 completed, 6 never finaled, 1 expired or cancelled.

Of the 6 never-finaled permits, 6 are over 10 years old. 5 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Stairs 1Kitchen remodel 2Bathroom remodel 4

4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 1, 2010Completed
final sign-off Apr 2011
208 Lake Merced Hill No Blremodel kitchen & two bathrooms. remove & replace, finishes, cabinets, fixtures & appliances.
Details
Permit
201011014097
Status
complete
Filed
Nov 1, 2010
Permit issued
Nov 1, 2010
Final sign-off
Apr 4, 2011
Declared cost
$30,000
Address
208 Lake Merced Hill No Bl

remodel kitchen & two bathrooms. remove & replace, finishes, cabinets, fixtures & appliances.

Open the permit page

$30,000
Jun 15, 2010Completed
final sign-off Sep 2010
268 Pixley Strevision to 201002025717: enlarge windows on rear, new shear wall and rearrange bath fixtures. replace slider with french door pairs at rear.
Details
Permit
201006154505
Status
complete
Filed
Jun 15, 2010
Permit issued
Jun 15, 2010
Final sign-off
Sep 28, 2010
Declared cost
$5,000
Address
268 Pixley St

revision to 201002025717: enlarge windows on rear, new shear wall and rearrange bath fixtures. replace slider with french door pairs at rear.

Open the permit page

$5,000
Feb 2, 2010Completed
final sign-off Sep 2010
268 Pixley Stnew walls, re-arrangement of spaces, new bath, relocation of 2 rear windows @ 1st floor; reconstruction of stairway from 1st floor @ 2nd floor; infill floor opening between hall 2 & dining room below new washer/dryer closet.
Details
Permit
201002025717
Status
complete
Filed
Feb 2, 2010
Permit issued
Mar 18, 2010
Final sign-off
Sep 28, 2010
Declared cost
$85,000
Address
268 Pixley St

new walls, re-arrangement of spaces, new bath, relocation of 2 rear windows @ 1st floor; reconstruction of stairway from 1st floor @ 2nd floor; infill floor opening between hall 2 & dining room below new washer/dryer closet.

Open the permit page

$85,000
Jun 21, 2007Completed
final sign-off Oct 2007
1642 40th Avremove water damaged plaster and replace with new 5/8" dry wall. remodel kitchen and three bathrooms. install two windows at front elevation. windows are same size & location. add new office, new bedroom & new full bath at groundfloor.
Details
Permit
200706214745
Status
complete
Filed
Jun 21, 2007
Permit issued
Jun 21, 2007
Final sign-off
Oct 30, 2007
Declared cost
$30,000
Address
1642 40th Av

remove water damaged plaster and replace with new 5/8" dry wall. remodel kitchen and three bathrooms. install two windows at front elevation. windows are same size & location. add new office, new bedroom & new full bath at groundfloor.

Open the permit page

$30,000