Back to bathroom remodel contractors
Rain Or Shine General Const**See Note**
- Based in
- San Jose
- On San Francisco permits
- Nov 2005 to Apr 2006
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2005 | Expired or cancelled expired May 2009 | 453 Noe St | bathroom remodel: replace toilet,vanity,re-tile shower & repair water damaged studs.relocate duplex receptacles,new vanity light.new shower fixtures.Details
bathroom remodel: replace toilet,vanity,re-tile shower & repair water damaged studs.relocate duplex receptacles,new vanity light.new shower fixtures. | $4,500 |