Raffin Const Co Inc
- Based in
- Millbrae
- On San Francisco permits
- Mar 2009 to Dec 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2013 | Completed final sign-off May 2014 | 427 Lakeshore Dr | remove existing cabinets, counter tops, appliances, flooring & instal new in existing location. remove toilet, tub, sink. tile work in shower, around tub & floor. install new fixtures tile work fan.Details
remove existing cabinets, counter tops, appliances, flooring & instal new in existing location. remove toilet, tub, sink. tile work in shower, around tub & floor. install new fixtures tile work fan. | $60,000 |
| Aug 21, 2009 | Completed final sign-off Sep 2009 | 523 Roosevelt Wy | replace two aluminum window w/ temper glass n kind, no window work in bedrom w/ this permit.Details
replace two aluminum window w/ temper glass n kind, no window work in bedrom w/ this permit. | $2,000 |
| Mar 13, 2009 | Completed final sign-off Jul 2009 | 212 Bennington St | bathroom & kitchen remodel, termite report #5c, 32 sq ft @ front counter.Details
bathroom & kitchen remodel, termite report #5c, 32 sq ft @ front counter. | $60,000 |