Back to bathroom remodel contractors
Rafael Eduardo Moran
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Sep 2021
- Last 24 months
- 0 permits filed
78 permits since 2000: 59 completed, 16 never finaled, 3 expired or cancelled.
Of the 16 never-finaled permits, 1 is 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2021 | Completed final sign-off Nov 2021 | 431 Octavia St | unit 5: upgrade kitchen counter, electrical work, new tile walls & flloring in bathroom, replace furnace in-kind, repair toilet, shower valve. no structural changes.Details
unit 5: upgrade kitchen counter, electrical work, new tile walls & flloring in bathroom, replace furnace in-kind, repair toilet, shower valve. no structural changes. | $10,000 |
| Mar 2, 2015 | Completed final sign-off May 2015 | 798 Joost Av | bathroom remodel on upper level. replace fixtures in-kind. new exhaust fan; all high effiency lighting or constrolled by manual-on sensor; one main light high effiency. no change in layout or openings.Details
bathroom remodel on upper level. replace fixtures in-kind. new exhaust fan; all high effiency lighting or constrolled by manual-on sensor; one main light high effiency. no change in layout or openings. | $6,500 |
| Dec 8, 2014 | Never finaled issued Dec 2014, no final | 1441 Haight St | remodel kitchen in-kind, no structural changes, replace kitchen cabinets, remodel full bath & 1/2 bath.Details
remodel kitchen in-kind, no structural changes, replace kitchen cabinets, remodel full bath & 1/2 bath. | $35,000 |
| Jul 20, 2007 | Completed final sign-off Oct 2008 | 171 Rice St | ground floor-convert storage space to master bedroom & bath. remove door to front side yar & replace w/acrylic block window.Details
ground floor-convert storage space to master bedroom & bath. remove door to front side yar & replace w/acrylic block window. | $30,000 |
| Jun 14, 2007 | Completed final sign-off Jun 2007 | 1115 Noe St | work only on#1125 noe st. legalize remodel work done in bathroom done without permit on third floor.Details
work only on#1125 noe st. legalize remodel work done in bathroom done without permit on third floor. | $1,000 |
| Jul 11, 2006 | Completed final sign-off Aug 2006 | 1121 Noe St | build soffit for heatinf duct at hallway area & bathroom. the enclosure must be fine rated if duct communicate with other floors.Details
build soffit for heatinf duct at hallway area & bathroom. the enclosure must be fine rated if duct communicate with other floors. | $650 |