Back to bathroom remodel contractors
R7 Construction
- Based in
- Vallejo
- On San Francisco permits
- Dec 2020 to Mar 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 28 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2025 | Completed final sign-off Nov 2025 | 1885 Pacific Av | unit 201: kitchen remodel, and bathroom remodel, electrical panel relocation. create an opening in existing wall in kitchen area. new laundryDetails
unit 201: kitchen remodel, and bathroom remodel, electrical panel relocation. create an opening in existing wall in kitchen area. new laundry | $45,000 |
| Dec 29, 2020 | Completed final sign-off Jun 2021 | 2020 Broderick St | 1) current 1/2 bath to be converted to full bath with stall shower with drawings. 2) no toilet configuration change. 3) addition/installation of shower plumbing and shower stall. 4)installation of plmg for sink/vanity.Details
1) current 1/2 bath to be converted to full bath with stall shower with drawings. 2) no toilet configuration change. 3) addition/installation of shower plumbing and shower stall. 4)installation of plmg for sink/vanity. | $26,750 |