Back to bathroom remodel contractors
R M Remodeling Inc
- Based in
- Daly City
- On San Francisco permits
- Oct 2006 to Dec 2025
- Last 24 months
- 6 permits filed
63 permits since 2000: 61 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 37 completed, 1 never finaled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2024 | Completed final sign-off Jan 2025 | 3256 16th St | remodel bathroom in kindDetails
remodel bathroom in kind | $18,000 |
| Mar 14, 2024 | Completed final sign-off Apr 2024 | 651 39th Av | remodel (1) lower level bathroom inkind. new tiles, mixing valve and toilet. install new flooringDetails
remodel (1) lower level bathroom inkind. new tiles, mixing valve and toilet. install new flooring | $25,000 |
| Feb 5, 2024 | Completed final sign-off Jul 2024 | 47 Santa Rita Av | convert walk-in closet to bathroom, install new plumbing, electrical, shower stall and tiles.Details
convert walk-in closet to bathroom, install new plumbing, electrical, shower stall and tiles. | $60,000 |
| Aug 17, 2022 | Completed final sign-off Nov 2022 | 400 Beale St | one bath remodel: demo tub shower surround , install new drain and mixing value install shower pan, install new tiles, install plug for toilet.Details
one bath remodel: demo tub shower surround , install new drain and mixing value install shower pan, install new tiles, install plug for toilet. | $16,000 |
| Sep 17, 2021 | Completed final sign-off Feb 2023 | 1605 Fulton St | at 1st fl. convert (e) floor space to new dwelling unit included bedroom, bathroom, living and kitchen, work to comply with nov # 201937241. convert garage to new living room.Details
at 1st fl. convert (e) floor space to new dwelling unit included bedroom, bathroom, living and kitchen, work to comply with nov # 201937241. convert garage to new living room. | $45,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2021 | 1247 42nd Av | bathroom remodel in-kind. install new plumbing, electrical, tub, shower stall tiles, vanity & toilet. no wall change.Details
bathroom remodel in-kind. install new plumbing, electrical, tub, shower stall tiles, vanity & toilet. no wall change. | $35,000 |
| Oct 23, 2020 | Completed final sign-off Jul 2021 | 106 Melrose Av | kitchen and bathroom remodel. install new cabinets, countertops, tiles, plumbing fixtures and appliances.Details
kitchen and bathroom remodel. install new cabinets, countertops, tiles, plumbing fixtures and appliances. | $45,000 |
| Sep 26, 2019 | Completed final sign-off Jun 2020 | 651 39th Av | revision to #201907267015. frame detail for skylight and wall for bathroom remodel.Details
revision to #201907267015. frame detail for skylight and wall for bathroom remodel. | |
| Jul 26, 2019 | Completed final sign-off Jun 2020 | 651 39th Av | bathroom remodel: install new tiles, tolet, anity and shower stall. install new skylight in bathroom. new fixtures.Details
bathroom remodel: install new tiles, tolet, anity and shower stall. install new skylight in bathroom. new fixtures. | $30,000 |
| May 24, 2019 | Completed final sign-off Feb 2020 | 3022 Webster St | bathroom remodel, install new shower stall, vanity, tiles and plumbing fixturesDetails
bathroom remodel, install new shower stall, vanity, tiles and plumbing fixtures | $30,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 701 Myra Wy | master bathroom remodel, 5'x8'. new tub, install new vanity, install new tiles in kindDetails
master bathroom remodel, 5'x8'. new tub, install new vanity, install new tiles in kind | $18,000 |
| Feb 5, 2019 | Completed final sign-off May 2019 | 134 Middlefield Dr | bathroom remodel, install new plumbing fixts & tiles in-kind.Details
bathroom remodel, install new plumbing fixts & tiles in-kind. | $14,490 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 701 Myra Wy | kitchen & hallway bathroom remodel, install new cabinets, countertops, lights and tile and plumbing. bathroom 5' x 10' kitchen - 10' x 12'Details
kitchen & hallway bathroom remodel, install new cabinets, countertops, lights and tile and plumbing. bathroom 5' x 10' kitchen - 10' x 12' | $35,000 |
| Jun 8, 2018 | Completed final sign-off Jan 2019 | 933 14th St | bathroom remodel. install toilet, vanity and shower stall new tile. 6'x7'Details
bathroom remodel. install toilet, vanity and shower stall new tile. 6'x7' | $40,000 |
| Jan 5, 2018 | Completed final sign-off May 2018 | 1753 Hayes St | bathroom and powder room remodel. install new toilets, sinks, tub and shower surround. install new tiles.Details
bathroom and powder room remodel. install new toilets, sinks, tub and shower surround. install new tiles. | $30,000 |
| Aug 15, 2017 | Completed final sign-off Mar 2018 | 115 Buena Vista Tr | bathroom remodel, relocate vanity & shower stall, install new tile.Details
bathroom remodel, relocate vanity & shower stall, install new tile. | $35,000 |
| Sep 26, 2016 | Completed final sign-off Jun 2017 | 2515 Sacramento St | master bathroom remodel, replace shower stall toilet and vanity. install new tile. amend pa#201607071720.Details
master bathroom remodel, replace shower stall toilet and vanity. install new tile. amend pa#201607071720. | $30,000 |
| Jul 7, 2016 | Completed final sign-off Jun 2017 | 2515 Sacramento St | hallway bathroom remodel. replace tub, toilet & vanity. install new tile.Details
hallway bathroom remodel. replace tub, toilet & vanity. install new tile. | $20,000 |
| Jan 29, 2016 | Completed final sign-off Jul 2016 | 3828 Sacramento St | apt 2: kitchen remodel: new cabinets and counter tops partial bathroom remodela, new vanity and floor tiles. no structural work.Details
apt 2: kitchen remodel: new cabinets and counter tops partial bathroom remodela, new vanity and floor tiles. no structural work. | $35,000 |
| Sep 10, 2015 | Completed final sign-off Jan 2016 | 1612 Funston Av | bathroom remodel, eliminate wall between bathroom and closet. frame in new closet in adjoining bedroom. new shower stall, tiles, toilet and pedestal sinkDetails
bathroom remodel, eliminate wall between bathroom and closet. frame in new closet in adjoining bedroom. new shower stall, tiles, toilet and pedestal sink | $30,000 |
| Jun 2, 2015 | Completed final sign-off Aug 2015 | 130 Marsilly St | bathroom remodel - new shower stall, relocate plumbing, new electrical, new tiles, replace main water supply 8x10Details
bathroom remodel - new shower stall, relocate plumbing, new electrical, new tiles, replace main water supply 8x10 | $25,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 1515 Willard St | remodel a full bath and half bath on 1st fl. no walls added, moved or removed. all fixture layout to remain unchanged. no expansion or addition.Details
remodel a full bath and half bath on 1st fl. no walls added, moved or removed. all fixture layout to remain unchanged. no expansion or addition. | $30,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 728 Clayton St | kitchen & 2 full bathrooms & 2 powder rooms remodled. install new kitchen cabinets, counter tops, appliances. install new tubs, toilets, vanities, new tile. no walls to be moved, no change in layoutDetails
kitchen & 2 full bathrooms & 2 powder rooms remodled. install new kitchen cabinets, counter tops, appliances. install new tubs, toilets, vanities, new tile. no walls to be moved, no change in layout | $100,000 |
| Oct 25, 2013 | Completed final sign-off Mar 2014 | 2525 Sacramento St | bathroom remodel - install new double sink, new tub, new tiles for shower stall and floor, frame in new tub deck relocate electrical outlets.Details
bathroom remodel - install new double sink, new tub, new tiles for shower stall and floor, frame in new tub deck relocate electrical outlets. | $25,000 |
| Jun 7, 2013 | Completed final sign-off Oct 2013 | 301 Monterey Bl | unit #4: new kitchen cabinets, counter tops and fixtures, new bathroom, vanity tub, linoleum and fixtures, to comply with complaint (renovation 1 kitchen and 1 bathroom)Details
unit #4: new kitchen cabinets, counter tops and fixtures, new bathroom, vanity tub, linoleum and fixtures, to comply with complaint (renovation 1 kitchen and 1 bathroom) | $20,000 |
| Mar 19, 2013 | Completed final sign-off Jun 2013 | 1033 Kirkham St | bathroom remodel - replace tub, sink shower valves, new recess lights, new vent fan, new tiles, no wall changesDetails
bathroom remodel - replace tub, sink shower valves, new recess lights, new vent fan, new tiles, no wall changes | $17,000 |
| Sep 12, 2012 | Completed final sign-off Jan 2013 | 1000 North Point St | replace kitchenette cabinets and appliances, new bathroom vanity, and toilet, install engineered flooringDetails
replace kitchenette cabinets and appliances, new bathroom vanity, and toilet, install engineered flooring | $6,000 |
| Aug 27, 2012 | Completed final sign-off Nov 2012 | 47 Santa Rita Av | bathroom remodel new tub/shower surround, relocate vanity plumbing install new vanity,tiles & toilet, replace sash window, permanently installed lights in bathroom shall be high effeciency unless they are controlled y manual on occupaing sensors.Details
bathroom remodel new tub/shower surround, relocate vanity plumbing install new vanity,tiles & toilet, replace sash window, permanently installed lights in bathroom shall be high effeciency unless they are controlled y manual on occupaing sensors. | $15,000 |
| Aug 29, 2011 | Completed final sign-off Feb 2012 | 237 Elsie St | remodel upper unit one bathroom & one kitchen, rough in new plumbing & electrical for bathrm and ktichen, new tub, vanity for bathrm, new kitchen cabinets, rough in new electrical for lower unit kitchen, new water supply lines for lower unit kitchen, new granite counter tops no new cabinets, lightinDetails
remodel upper unit one bathroom & one kitchen, rough in new plumbing & electrical for bathrm and ktichen, new tub, vanity for bathrm, new kitchen cabinets, rough in new electrical for lower unit kitchen, new water supply lines for lower unit kitchen, new granite counter tops no new cabinets, lightin | $21,000 |
| Aug 17, 2011 | Completed final sign-off Feb 2012 | 1170 Sacramento St | remove/replace kitchen cabinets, replace tiles, tub, & vanity for bathroom. replace 10 doors, (n) electrical panel & fixtures. (n) plumbing fixtures for kitchen, one bathroom, replace tile for entry & powder room. (e) doors being replaced are non fire rated at same locations.Details
remove/replace kitchen cabinets, replace tiles, tub, & vanity for bathroom. replace 10 doors, (n) electrical panel & fixtures. (n) plumbing fixtures for kitchen, one bathroom, replace tile for entry & powder room. (e) doors being replaced are non fire rated at same locations. | $75,000 |
| Jun 22, 2011 | Completed final sign-off Sep 2011 | 1000 North Point St | #1404 - 1 bathroom remodel- install new tub, shower valves, vanity, tile surround, tiled floor, new vanity fixtures to comply with cec 150k, no change to windows wall doors.Details
#1404 - 1 bathroom remodel- install new tub, shower valves, vanity, tile surround, tiled floor, new vanity fixtures to comply with cec 150k, no change to windows wall doors. | $10,000 |
| May 6, 2011 | Completed final sign-off Aug 2011 | 2400 Webster St | remodel 1 bathroom, new tub, vanity, install new shower valves & vanity, tile shower surround on floor. note lighting to comply w/ cec 150 (k). no change to walls windows or doors. no window, door, ceiling or wall work on this permit.Details
remodel 1 bathroom, new tub, vanity, install new shower valves & vanity, tile shower surround on floor. note lighting to comply w/ cec 150 (k). no change to walls windows or doors. no window, door, ceiling or wall work on this permit. | $10,000 |
| Mar 15, 2011 | Completed final sign-off Jun 2011 | 296 Guttenberg St | remodel second floor bathroom, relocate tub, vanity & toilet, install new shower pan, new recessed lights and sconces.Details
remodel second floor bathroom, relocate tub, vanity & toilet, install new shower pan, new recessed lights and sconces. | $15,000 |
| Dec 17, 2007 | Completed final sign-off Dec 2008 | 720 Castro St | 2nd floor-convert one bathroom into two bathrooms-rough in new plumbing and electrical, new shower pan, install new tiles, removal of non structural wall.Details
2nd floor-convert one bathroom into two bathrooms-rough in new plumbing and electrical, new shower pan, install new tiles, removal of non structural wall. | $25,500 |
| Sep 27, 2007 | Completed final sign-off Mar 2008 | 27 Hartford St | remodel kitchen caninets, relocate sink and dish washer. install recessed can lights, remodel bathroom, relocate toilet flange,install new shower valve. pan for shower stall. work on 27 hartford on 3rd fl.Details
remodel kitchen caninets, relocate sink and dish washer. install recessed can lights, remodel bathroom, relocate toilet flange,install new shower valve. pan for shower stall. work on 27 hartford on 3rd fl. | $36,500 |
| Apr 6, 2007 | Completed final sign-off Dec 2007 | 1177 California St | work in unit #309: convert shower stall for washer & dryer, convert master bathroom tub into shower stall, replace guest bath tub. change all sinks and plumbing fixtures, new tile & marble, replace toilets. 2 bathrooms remodeled, and fixture changes in kitchen & wet barDetails
work in unit #309: convert shower stall for washer & dryer, convert master bathroom tub into shower stall, replace guest bath tub. change all sinks and plumbing fixtures, new tile & marble, replace toilets. 2 bathrooms remodeled, and fixture changes in kitchen & wet bar | $25,000 |
| Mar 14, 2007 | Never finaled issued Mar 2007, no final | 1865 California St | remodel kitchen and bath. move gas lines, rough plumbing and electrical, demo wall in kitchen for island dabinets, provide new gas,elec,vent for washer and dryer. replace window in bath to awning window. new tub, update electrical panel and serviceDetails
remodel kitchen and bath. move gas lines, rough plumbing and electrical, demo wall in kitchen for island dabinets, provide new gas,elec,vent for washer and dryer. replace window in bath to awning window. new tub, update electrical panel and service | $60,000 |
| Oct 25, 2006 | Completed final sign-off Apr 2007 | 1865 California St | work for only unit#6.replace kitchen cabinets, replace tiles in 2 bathrooms,move electrical panel ,move washer + dryer hook ups, change shower valves. no structural work. new lighting to be flourescent, bathrooms to have flourescent lighting or occupancy sensors.Details
work for only unit#6.replace kitchen cabinets, replace tiles in 2 bathrooms,move electrical panel ,move washer + dryer hook ups, change shower valves. no structural work. new lighting to be flourescent, bathrooms to have flourescent lighting or occupancy sensors. | $40,000 |