R L W Development & Design Corporation
- Based in
- Sherman Oaks
- On San Francisco permits
- Jul 2014 to Aug 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2017 | Completed final sign-off Sep 2017 | 180 Carl St | to comply with nov # 201405403 to address elimination of a required means of egress. permit # 201506098555 adds required means of egressDetails
to comply with nov # 201405403 to address elimination of a required means of egress. permit # 201506098555 adds required means of egress | |
| Jun 9, 2015 | Completed final sign-off Aug 2016 | 180 Carl St | rev.#2014.0515.5859. struct.revise to deck above grade. structural reinf.of (e) beam at manager's office. remove portion of ext. stair btwn. level 2 & 3 including 3rd fl balcony. stair from level 2 to grade remain. sprinkler & underground deferred submittal. comply nov #201530111.Details
rev.#2014.0515.5859. struct.revise to deck above grade. structural reinf.of (e) beam at manager's office. remove portion of ext. stair btwn. level 2 & 3 including 3rd fl balcony. stair from level 2 to grade remain. sprinkler & underground deferred submittal. comply nov #201530111. | $20,000 |
| Mar 25, 2015 | Completed final sign-off Jul 2015 | 180 Carl St | unit #3 kitchen remodel & painting. replaced toilet in bathroom.Details
unit #3 kitchen remodel & painting. replaced toilet in bathroom. | $7,000 |
| Jan 28, 2015 | Expired or cancelled revoked Mar 2015 | 180 Carl St | revision to appl #2014.0515.5859 - relcoate bathroom downstairs, deck above grade - (n) deck framing. also, revision to beam detail between first and second floorDetails
revision to appl #2014.0515.5859 - relcoate bathroom downstairs, deck above grade - (n) deck framing. also, revision to beam detail between first and second floor | |
| Oct 28, 2014 | Completed final sign-off Jun 2016 | 180 Carl St | remove (2) lightwell covers in response to nov 201489781 and 201339601Details
remove (2) lightwell covers in response to nov 201489781 and 201339601 | $1,000 |
| Oct 10, 2014 | Completed final sign-off Aug 2016 | 180 Carl St | combine existing managers office space with unit above, revision to permit #2014-05-15-5859. sprinklers on separate submittal.Details
combine existing managers office space with unit above, revision to permit #2014-05-15-5859. sprinklers on separate submittal. | |
| Oct 8, 2014 | Expired or cancelled revoked Oct 2014 | 180 Carl St | removal of a stair & deck (balcony) at 3rd floor court yard area.Details
removal of a stair & deck (balcony) at 3rd floor court yard area. | $2,000 |
| Jul 23, 2014 | Expired or cancelled cancelled Jul 2016 | 180 Carl St | to comply with nov 201489781 to legalize the enclosing of 2 existing lightwells re-routing the exhaust vents of existing bathrooms (total of 4 bathrooms)- two vent route to roof, two vent to the kitchen per plans.Details
to comply with nov 201489781 to legalize the enclosing of 2 existing lightwells re-routing the exhaust vents of existing bathrooms (total of 4 bathrooms)- two vent route to roof, two vent to the kitchen per plans. |