Back to bathroom remodel contractors
R J Finato Construction
- Based in
- Mountain View
- On San Francisco permits
- Jan 2002 to Jan 2002
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2002 | Completed final sign-off Aug 2002 | 1177 California St | remove wall in bathroom, replace vanity cabinet, sink, replace toilet, replace tub, faucet, flr tileDetails
remove wall in bathroom, replace vanity cabinet, sink, replace toilet, replace tub, faucet, flr tile | $28,000 |
| Jan 28, 2002 | Expired or cancelled cancelled Nov 2024 | 1177 California St | remove wall in bathroom,replace vanity,cabinet,sink,toilet,tub,faucet,tile,appliance,counter topsDetails
remove wall in bathroom,replace vanity,cabinet,sink,toilet,tub,faucet,tile,appliance,counter tops |