Back to bathroom remodel contractors
R & J Construction Inc
- Based in
- Danville
- On San Francisco permits
- Sep 2009 to Jul 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2011 | Completed final sign-off Sep 2011 | 68 Eureka St | remodel 2 baths, replace plumbing fixtures flooring,tile shower on bath. replace doors at laundry room. relocate door opening on closet. install shelfing. replace light fixture in bedroom #1. field verify and replace light fixtures as needed throughout.Details
remodel 2 baths, replace plumbing fixtures flooring,tile shower on bath. replace doors at laundry room. relocate door opening on closet. install shelfing. replace light fixture in bedroom #1. field verify and replace light fixtures as needed throughout. | $47,644 |