R D Rossi And Son
- Based in
- Redwood City
- On San Francisco permits
- Jun 2001 to Apr 2008
- Last 24 months
- 0 permits filed
22 permits since 2000: 18 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2007 | Completed final sign-off Jun 2007 | 237 Greenwich St | voluntary strengthening and upgrade repiar work to extg crawl space and breeze way area. replace extg beams and posts as necess. add foundation section & footings. repair extg redwood decking & guard railDetails
voluntary strengthening and upgrade repiar work to extg crawl space and breeze way area. replace extg beams and posts as necess. add foundation section & footings. repair extg redwood decking & guard rail | $28,000 |
| May 20, 2004 | Completed final sign-off Nov 2004 | 1564 Chestnut St | add deck above (e) rear bedrm, add door for access to deck (n) deck will replace (e) roof of rear beDetails
add deck above (e) rear bedrm, add door for access to deck (n) deck will replace (e) roof of rear be | $16,500 |