Back to pergola or trellis contractors
R. C. Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2023
- Last 24 months
- 0 permits filed
164 permits since 2000: 124 completed, 16 never finaled, 24 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
2 pergola or trellis permits: 1 completed, 1 expired or cancelled. Typically 16 days from filing to permit and 1 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | 1)rebuild required exit deck and stairs at rear due to dryrot. 2)rebuild front step due to dryrot, use front botton concrete step. 3)install 6' fence with 2' trellis on ames alley.Details
1)rebuild required exit deck and stairs at rear due to dryrot. 2)rebuild front step due to dryrot, use front botton concrete step. 3)install 6' fence with 2' trellis on ames alley. | $25,000 |
| Apr 23, 2009 | Completed final sign-off Apr 2009 | 2159 Bay St | revision to pa# 2009-0311-3864-to delete trellis from scope of work, all work completed.Details
revision to pa# 2009-0311-3864-to delete trellis from scope of work, all work completed. |