Back to bathroom remodel contractors
Quinlan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 7 permits filed
97 permits since 2000: 75 completed, 3 in progress, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 25 completed, 3 in progress, 3 never finaled. Typically 4 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jul 2026 | 1406 45th Av | gr flr tenant improvement. install electrical wiring & devices for plugs & lights in gr fl retail. bathroom fixtures & sink in existing locations. install insulation & drywall on all walls. ref 202412314770Details
gr flr tenant improvement. install electrical wiring & devices for plugs & lights in gr fl retail. bathroom fixtures & sink in existing locations. install insulation & drywall on all walls. ref 202412314770 | $18,000 |
| May 23, 2025 | Completed final sign-off Feb 2026 | 175 San Anselmo Av | remodel bathroom in kind no structural workDetails
remodel bathroom in kind no structural work | $25,000 |
| Apr 1, 2025 | In progress issued Jul 2025 | 2112 18th Av | kitchen remodel, remove walls at kitchen/dining. remodel upstairs bathroom/add new bathroom upstairs. modify upstairs bedroom, relocate rear bedroom window.Details
kitchen remodel, remove walls at kitchen/dining. remodel upstairs bathroom/add new bathroom upstairs. modify upstairs bedroom, relocate rear bedroom window. | $90,000 |
| Nov 28, 2023 | In progress issued Feb 2024 | 1246 43rd Av | rev to pa# 2023-0811-4248: remodel (e) upper level plan bathroom remove lightwell at same bathroom add bathroom at closet at front bedroom upper levelDetails
rev to pa# 2023-0811-4248: remodel (e) upper level plan bathroom remove lightwell at same bathroom add bathroom at closet at front bedroom upper level | |
| Aug 11, 2023 | Never finaled issued Aug 2023, no final | 1246 43rd Av | remodel 2 bathrooms on the 3rd floor no structural workDetails
remodel 2 bathrooms on the 3rd floor no structural work | $15,000 |
| Jan 31, 2023 | Completed final sign-off Nov 2023 | 355 Castenada Av | remodel kitchen + bath in kind in same locations in kind. layout to remain the same. toilet, shower, sink in same location. no structural work and floor layout to remain the same.Details
remodel kitchen + bath in kind in same locations in kind. layout to remain the same. toilet, shower, sink in same location. no structural work and floor layout to remain the same. | $40,000 |
| Jan 20, 2023 | Completed final sign-off Oct 2023 | 2543 18th Av | remodel kitchen and one bathroom on main level. new cabinets, counters and appliances. kitchen and bathroom in same location as existing. repair waterproofing at center patio. no new wall & no (e) wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
remodel kitchen and one bathroom on main level. new cabinets, counters and appliances. kitchen and bathroom in same location as existing. repair waterproofing at center patio. no new wall & no (e) wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $35,000 |
| Aug 22, 2022 | Completed final sign-off Nov 2024 | 257 Pacheco St | horizontal addition- conversion of exterior deck to enclose full bath in 2nd floor. rear yard scope includes excavation,finishes, shed, & sun shade.front yard work includes widening the driveway 7 adding a stair run to the intermediate entry stair.lighting,plumbing & finishes in area of work.Details
horizontal addition- conversion of exterior deck to enclose full bath in 2nd floor. rear yard scope includes excavation,finishes, shed, & sun shade.front yard work includes widening the driveway 7 adding a stair run to the intermediate entry stair.lighting,plumbing & finishes in area of work. | $50,000 |
| Jun 2, 2022 | Completed final sign-off Aug 2024 | 257 Pacheco St | interior renovation of (e) single family residence: 1 kitchen and 1 bathroom. relocate 1 powder rm, new built-in millwork, and new exterior doors and windows @ rear.Details
interior renovation of (e) single family residence: 1 kitchen and 1 bathroom. relocate 1 powder rm, new built-in millwork, and new exterior doors and windows @ rear. | $150,000 |
| May 4, 2021 | Completed final sign-off Mar 2022 | 127 Westgate Dr | remodel kitchen and two bathrooms. no structural work. all work is interiorDetails
remodel kitchen and two bathrooms. no structural work. all work is interior | $35,000 |
| Jan 20, 2021 | Completed final sign-off May 2022 | 459 Magellan Av | remodel 3 bathrooms and one powder room in kind. no change to floor plans or walls.Details
remodel 3 bathrooms and one powder room in kind. no change to floor plans or walls. | $49,500 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 139 Lakeshore Dr | remodel 2 bathrooms & add closet and laundry closet.Details
remodel 2 bathrooms & add closet and laundry closet. | $15,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2023 | 469 Noriega St | horizontal addition, (n) front balcony, (n) pv roof panels. voluntary seismic strengthing, kitchen & bathroom renovation. rear yard retaining wall. (n) driveway, (n) sideyard stairs. replace (e) windows, (e) roof, (e)siding & (e) electrical services. (n) plumbing as needed.Details
horizontal addition, (n) front balcony, (n) pv roof panels. voluntary seismic strengthing, kitchen & bathroom renovation. rear yard retaining wall. (n) driveway, (n) sideyard stairs. replace (e) windows, (e) roof, (e)siding & (e) electrical services. (n) plumbing as needed. | $396,825 |
| Jul 9, 2018 | Completed final sign-off Sep 2020 | 1242 Vallejo St | alterations to 1st fl unit and main residence. new bedroom on 1st floor. remodel kitchens & baths. replace windows in kindDetails
alterations to 1st fl unit and main residence. new bedroom on 1st floor. remodel kitchens & baths. replace windows in kind | $200,000 |
| Jan 23, 2018 | Completed final sign-off Nov 2018 | 536 Los Palmos Dr | new bathroom and closet on 1st fl. convert existing family room on 1st flr to bedroomDetails
new bathroom and closet on 1st fl. convert existing family room on 1st flr to bedroom | $20,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 104 Pierce St | no ecxterior work , remodel existing bathing area and furnace closet to become 1 full bath, 1 1/2 bath. remodel existing 1/2 bath to becomen new laundry with stackable wash/dry. relocate furnace to attic, new horiz high eff unitDetails
no ecxterior work , remodel existing bathing area and furnace closet to become 1 full bath, 1 1/2 bath. remodel existing 1/2 bath to becomen new laundry with stackable wash/dry. relocate furnace to attic, new horiz high eff unit | $62,500 |
| Jul 10, 2017 | Completed final sign-off Oct 2020 | 2455 20th Av | add 2-story horizontal rear addition to (e) home to allow (2) (n) bedrooms, (2) full bathrooms & a family roomDetails
add 2-story horizontal rear addition to (e) home to allow (2) (n) bedrooms, (2) full bathrooms & a family room | $145,000 |
| Aug 2, 2016 | Completed final sign-off Feb 2017 | 65 Greenwood Av | rear garage space renovated into master bedroom & bath. new foundation at portion of perimeter. replacement of access stair with code complying stair.Details
rear garage space renovated into master bedroom & bath. new foundation at portion of perimeter. replacement of access stair with code complying stair. | $150,000 |
| Apr 28, 2016 | Completed final sign-off Apr 2020 | 232 18th Av | exterior: (n) rear horizontal addition, (n) rear deck, (n) recessed front entry, replace (e) front windows. interior: expanded kitchen, dining on ground floor, master suite/office, laundry, bath on 2nd fl.Details
exterior: (n) rear horizontal addition, (n) rear deck, (n) recessed front entry, replace (e) front windows. interior: expanded kitchen, dining on ground floor, master suite/office, laundry, bath on 2nd fl. | $300,000 |
| Sep 17, 2015 | Completed final sign-off Jun 2016 | 2182 28th Av | new curb mtd skylights; add 3 bedrooms, 2 baths on 1st story. vertical infill addition at 1st fl under 2nd fl overhang. remodel 2nd story. no change to height or depth. no change to driveway, sidewalk or parking. new deck with bldg envelopeDetails
new curb mtd skylights; add 3 bedrooms, 2 baths on 1st story. vertical infill addition at 1st fl under 2nd fl overhang. remodel 2nd story. no change to height or depth. no change to driveway, sidewalk or parking. new deck with bldg envelope | $150,000 |
| Apr 8, 2015 | Completed final sign-off Apr 2018 | 490 Magellan Av | addition of new 404 sqft/ great room w/exterior deck & remodel (e) laundry room & pantry on 1st floor. addition of 221 sqft. for bedroom extension & master bathroom remodel on the 2nd flr.Details
addition of new 404 sqft/ great room w/exterior deck & remodel (e) laundry room & pantry on 1st floor. addition of 221 sqft. for bedroom extension & master bathroom remodel on the 2nd flr. | $135,000 |
| Jan 20, 2015 | Never finaled issued Jan 2015, no final | 2090 Great Hy | replace existing kitchen cabinets and counters. all locations to remain same for appliances & cabinets. no structural work, remove ceramic tiles from 2 bathrooms and replace with new, replace toilets & sink. no change on walls.Details
replace existing kitchen cabinets and counters. all locations to remain same for appliances & cabinets. no structural work, remove ceramic tiles from 2 bathrooms and replace with new, replace toilets & sink. no change on walls. | $18,000 |
| Feb 7, 2014 | Completed final sign-off May 2014 | 538 Wawona St | remodel kitchen in same location. new cabinets & counters, remove & replace bathroom tile, no fixture relocation, no structural workDetails
remodel kitchen in same location. new cabinets & counters, remove & replace bathroom tile, no fixture relocation, no structural work | $14,000 |
| Sep 27, 2013 | Completed final sign-off Jun 2015 | 440 27th St | expansion of rear top level (e) 3-story single family residence. wk incl remove roof at rear and replace w/ flat roof, build walls and windows as shown on plans. add bathroom and expand master bedroom. structure work as req, plumbing & electrical in affected areas.Details
expansion of rear top level (e) 3-story single family residence. wk incl remove roof at rear and replace w/ flat roof, build walls and windows as shown on plans. add bathroom and expand master bedroom. structure work as req, plumbing & electrical in affected areas. | $75,000 |
| May 29, 2013 | Completed final sign-off Feb 2016 | 2133 Scott St | renovate existing 2 bedroom, 2 bath residence. no additional square footage proposed at this time. repair retaining wall in backyard due to seepage and failure. add new skylights. for retaining wall sec permit # 201304154528. (e) windows and door in back to be replaced.Details
renovate existing 2 bedroom, 2 bath residence. no additional square footage proposed at this time. repair retaining wall in backyard due to seepage and failure. add new skylights. for retaining wall sec permit # 201304154528. (e) windows and door in back to be replaced. | $100,000 |
| Mar 4, 2011 | Completed final sign-off Jan 2012 | 4316 26th St | replace e windows in kind with true divided light wood clad windows. expansion of e master bath at rear of house. replacment of e rails at back of h0useDetails
replace e windows in kind with true divided light wood clad windows. expansion of e master bath at rear of house. replacment of e rails at back of h0use | $75,000 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 401 Mangels Av | remove tile from 2 bathrooms. repair dry wall and replace with new tile. replace plumbing fixtures in same location. no change.Details
remove tile from 2 bathrooms. repair dry wall and replace with new tile. replace plumbing fixtures in same location. no change. | $6,000 |
| Oct 7, 2009 | Completed final sign-off Oct 2010 | 2445 Funston Av | interior reniovation including kitchen & bathrooms-addition of habitable space within (e) footprint at the ground floor. addition of deck at rear of house. replace wood windows at side & back of house in kind.Details
interior reniovation including kitchen & bathrooms-addition of habitable space within (e) footprint at the ground floor. addition of deck at rear of house. replace wood windows at side & back of house in kind. | $185,000 |
| Aug 20, 2009 | Never finaled issued Aug 2009, no final | 326 Presidio Av | remove and replace in kind kitchen cabinets, countertop and appliances. replace bathroom vanity and sinks. replace glass shower enclosure. all work in unit 1.Details
remove and replace in kind kitchen cabinets, countertop and appliances. replace bathroom vanity and sinks. replace glass shower enclosure. all work in unit 1. | $9,000 |
| Dec 29, 2006 | Completed final sign-off May 2007 | 1538 Diamond St | convert 1st story storage to habitable space (bedroom, entry bath), reconfigure stairway, add door to exterior, add window at rear regrade-replace floor slab. remove portion of rear deck.Details
convert 1st story storage to habitable space (bedroom, entry bath), reconfigure stairway, add door to exterior, add window at rear regrade-replace floor slab. remove portion of rear deck. | $50,000 |
| Apr 5, 2005 | Completed final sign-off May 2005 | 785 Cole St | remodel bathroom on 2/f. no structuralDetails
remodel bathroom on 2/f. no structural | $8,000 |